Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Languages
Timeline
Generic
Frans Dance Jorgen Bonsapia

Frans Dance Jorgen Bonsapia

Superintendent Underground Mine Paste Plant And Stockpile Operations
Jalan Perintis Lurus RT11, Kel.Perintis Kec Mimika Baru

Summary

Talented Mine Superintendent offering 20 years of experience Block Caving Mine production, Stope Paste Plant, Mill and Stockpile operations. Successful at overseeing communication and operations between teams, vendors and design professionals. Focused on keeping projects on time and under budget using time management and prioritization skills.

Overview

19
19
years of professional experience
5
5
Certifications
1
1
Language

Work History

Superintendent Stockpile Operations

PT. Freeport Indonesia
10.2024 - Current


  • Established successful procedures to achieve 115.000 tonnage per day/ 230.000 delivered ore tonnage/month for day-to-day operations.
  • Implemented safety protocols of dozer operators to minimize accidents, Dozers damage, handling wet muck at the stockpile and improved employee wellbeing.
  • Evaluated subcontractor performance regularly, ensuring adherence to contract requirements and maintaining accountability throughout the lifecycle of each project.
  • Analyzed reports to identify areas of improvement and implement corrective action.
  • Mentored junior staff, leading to increased productivity and improved teamwork throughout the organization.
  • Reviewed plans and inspect Dozers and ongoing stockpile operations to keep work in line with project goals.
  • Communicated effectively with managers,safety officers,clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Supported project coordination and smooth workflow by coordinating 5 units Dozers D11 Caterpillar and 4 units of D10 to move ore into the feeders.
  • Resolved conflicts between staff and customers swiftly and professionally.
  • Scheduled and supervised maintenance and repair of dozers.

Superintendent Mill Auxiliary

Freeport-McMoRan Copper & Gold
11.2022 - 10.2024


  • Championed continuous improvement initiatives operating and maintaining booster pump, Geho pump, the slurry max pump and related equipment to move 6000-1000 tons of ore per day to dewatering plant Portsite.
  • Monitored pressure gauges, flow rates, and ensure the safe and efficient operation of pumping systems.
  • Controlled thickener system, percentages of Reagent,flocullant, antiscalant in the tank.

Superintendent Stope Fill and Paste Plant Operator

PT. Freeport Indonesia
04.2010 - 11.2022
  • Managed Big Gossan Mine Paste Plant start-up, slurry pipes installation and maintenance projects while maintaining strict targets and adhering to budget constraints.
  • Championed continuous improvement initiatives at Big Gossan Underground Cut and Fill Stoping Mine, introducing new methodologies to maintain and increase 60000-80000 cubic metre/month (CUM) tons of paste to fille primary and secondary stopes and maintain material cost efficiencies at all cost.
  • Established effective quality control measures of slurry paste for consistent delivery through pipes into the stopes.
  • Maintained a safe working environment by conducting daily safety talk before shift, quarterly job safety analysis and quarterly Underground Mine inspections adhering to Underground Mine safety; Upheld environmental standards by monitoring emissions, waste management, and disposal practices in compliance with Environmental Audit ISO, EPA and OSHAS standards.
  • Increased plant efficiency by monitoring and adjusting equipment settings for safety and performance; Adjusted pumping systems, chemical feeders, auxiliary equipment, control systems storage tank levels and pump stations indicator.
  • Performed preventative maintenance tasks on schedule, minimizing unexpected disruptions, and shut down protocols during emergency situation.
  • Utilized computerized plant system for process control, increasing accuracy in operations; implement new technology to improve overall plant productivity; monitored flows, pressures, chemical feeds levels, and water quality indicators; reduced downtime by quickly identifying and resolving equipment malfunctions or failures.
  • Enhanced team communication by providing clear instructions on tasks, goals and targets and forced the security of plant by controlling visitors; trained and supervised new plant operators adapting to the work environment.
  • Supervised 4 foreman and 30 crew operators to promote safe working and efficiency through open communication and constructive feedback.

Staff Dispatcher and Cave Engineer

PT. Freeport Indonesia
04.2007 - 04.2010
  • Directed dispatching, routing, and tracking 7 loaders LHD 1700 at panel extraction area and 3 teleremote LHD R1700 at the wet muck panels; 12 units of Caterpillars AD30 Tons trucks at truck haulage area including 12 rockbreakers of DOZ Underground Mine while implementing efficient routing and scheduling system.
  • Communicated with shift superintendent, cave management production engineers and truck operators of recommended draw point orders to achieve 1000 tons per shift, 3000 tons daily and 80.000 tons per month ore extracted from the draw points.
  • Facilitated smooth transitions between shifts through effective handover communications, ensuring seamless continuity of operations with minimal disruptions and monitor repaired units with the maintenance team.
  • Conducted routine mapping fragmentation of the planned sequence and rate of material extraction from drawpoints to control the flow of caved ore, optimize ore grade optimization under gravity and to ensure the stability and propagation of the cave.

Education

Bachelor of Science - Mining Engineering

Universitas Sains Dan Teknologi Jayapura
Jayapura
09-2006

Skills

Strategic planning

Accomplishments

    Underground Production team making history by achieving over 100.000 tons per month in 2009.

    Start up the cut and fill mine paste plant and achieved over 100,000CUM stope filling in 2 months in 2022.

    Initiated wetmuck handling standard operating procedures at Amole Stockpile to avoid overflow of wetmucks in 2025.

Certification

Competency of Frontline Operations Supervisor

Languages

Indonesian
Bilingual or Proficient (C2)
English
Intermediate (B1)

Timeline

Superintendent Stockpile Operations

PT. Freeport Indonesia
10.2024 - Current

Competency for Mine Middle Management supervisor

06-2023

Superintendent Mill Auxiliary

Freeport-McMoRan Copper & Gold
11.2022 - 10.2024

PLC OPERATION, PROGRAMMING, TROUBLESHOOTING AND MAINTENANCE in MMS Bandung Training Center Indonesia

08-2017

Competency of Frontline Operations Supervisor

06-2012

Superintendent Stope Fill and Paste Plant Operator

PT. Freeport Indonesia
04.2010 - 11.2022

Modular Dispatch Underground System

09-2008

Staff Dispatcher and Cave Engineer

PT. Freeport Indonesia
04.2007 - 04.2010

Underground mine rockbreaker and loading point certification, PT.Freeport Indonesia

04-2007

Bachelor of Science - Mining Engineering

Universitas Sains Dan Teknologi Jayapura
Frans Dance Jorgen BonsapiaSuperintendent Underground Mine Paste Plant And Stockpile Operations