Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Languages
Personal Information
Conclusion
Timeline
Generic
Achmad Baiquni

Achmad Baiquni

Karang Satria North Tambun

Summary

Dynamic engineering supervisor with extensive experience at PT Ceria Metalindo Prima, excelling in project management and quality control. Proven track record in enhancing employee training and safety compliance, leading to significant productivity improvements. Adept at risk assessment and fostering teamwork, ensuring successful project execution and operational efficiency. Resourceful Supervisor known for high productivity and efficient task completion. Specialize in team leadership, conflict resolution, and operational oversight. Excel in communication, problem-solving, and adaptability to ensure smooth operations and workplace harmony. Committed to fostering positive work environments and achieving goals through effective supervision and staff engagement. Resourceful Supervisor trained in resolution of critical issues within time-sensitive environment with successful track record of building and maintaining talented teams. Highly organized, energetic and versatile leader committed to continuous improvements. Proven history of motivating staff to work together to achieve targets.

Overview

17
17
years of professional experience
1
1
Certification

Work History

MEP Supervisor

Ceria Metalindo Prima
Kolaka Sulawesi Tenggara
03.2025 - Current
  • Performed preventive maintenance tasks on various mechanical, plumbing and electrical components as needed.
  • Negotiated contracts with vendors and suppliers to secure favorable terms.
  • Monitored progress of ongoing projects and provided feedback when needed.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Evaluated vendors' services for cost-effectiveness and quality assurance purposes.
  • Adjusted equipment to prepare for excavating and boring geological materials.
  • Installed, aligned, and balanced new equipment and supervised employees.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Identified potential areas where improvements could be made in existing processes or procedures related to MEP systems.
  • Delegated duties to employees based on skillset.
  • Monitored equipment operation during extraction process to detect problems.
  • Investigated customer complaints regarding malfunctioning MEP systems and took corrective measures accordingly.
  • Provided guidance and training to junior staff members on proper use of tools and equipment related to MEP systems.

Site Manager

PT Jianan Eng
12.2023 - 03.2024
  • Overseeing the direction of the project, ensuring that client specifications and requirements are met, reviewing progress, and liaising with quantity surveyors to monitor costs.
  • Liaise with clients, other construction professionals, and sometimes members of the public regarding the coordination and supervision of construction workers.
  • Involved in the selection of tools and materials.
  • Conduct safety inspections, and ensure construction and site safety.
  • Review and prepare site reports, designs, and drawings.
  • Maintain quality control procedures.
  • Finding ways to prevent problems from occurring, and solving problems that arise.
  • Assess and minimize risks.
  • Writing reports and creating documents.
  • Assist in negotiating contracts and securing permits and licenses.

Inspector MEP

PT Kandu
06.2022 - 11.2023
  • Performed regular maintenance checks on production lines to identify any issues needing repair or replacement.
  • Documented all inspection results accurately in accordance with established guidelines.
  • Compiled reports outlining findings from each inspection performed.
  • Assisted in training new inspectors on safety protocols and standards.
  • Investigated customer complaints regarding product quality, reliability, or performance issues.
  • Analyzed data collected during inspections to ensure accuracy and consistency.
  • Participated in internal audits to evaluate the effectiveness of current quality control measures.
  • Conducted detailed inspections of equipment and machinery to ensure they were in compliance with safety regulations.
  • Collaborated with other departments to troubleshoot problems, develop solutions, and implement corrective action plans.
  • Developed comprehensive checklists for use during inspections to ensure nothing was missed.
  • Maintained accurate records of all tests conducted during the inspection process.
  • Provided technical support for the development and implementation of quality control systems and procedures.

Site Engineer

PT Tohir Mandiri Jaya
10.2020 - 06.2021
  • Provided technical support throughout all phases of the project including pre-construction planning, procurement activities, commissioning and startup procedures.
  • Ensured that all safety regulations were strictly adhered to during on-site operations.
  • Maintained records of daily activities including measurements taken at various stages of construction.
  • Performed periodic inspections of construction sites to ensure compliance with approved designs and standards.
  • Provided technical guidance to field personnel regarding installation of equipment and systems as needed.
  • Prepared detailed engineering plans, drawings, and specifications for the project.
  • Coordinated with other engineers, contractors, subcontractors, inspectors, suppliers, and owners in order to ensure timely completion of projects within budget constraints.
  • Evaluated material samples submitted by contractor for quality assurance purposes.
  • Conducted site surveys and analyses to identify construction requirements.
  • Developed cost estimates for materials and labor resources required for the project.
  • Evaluated existing conditions on site with levels and plumb bobs.
  • Resolved technical issues arising from design or installation problems encountered at the site.

Engineering Supervisor

PT Asahi Syncrotech
07.2017 - 10.2020
  • Implemented strategies to improve employee morale among the engineering team.
  • Evaluated and implemented process improvements to maximize efficiency and reduce costs.
  • Assisted in troubleshooting complex problems related to design or process issues.
  • Monitored performance metrics such as safety, quality, productivity, and cost control to ensure engineering goals were met.
  • Established performance objectives for each engineer, monitored progress towards those goals, and provided feedback when needed.
  • Created detailed reports outlining project progress, including successes and areas needing improvement.
  • Developed standard operating procedures for engineering operations in accordance with safety standards.
  • Identified potential risks associated with proposed products or processes before implementation.
  • Maintained up-to-date knowledge of technological advances in the field of engineering.

Engineering Supervisor

PT Shinryo Ind
04.2014 - 06.2017
  • Evaluated and implemented process improvements to maximize efficiency and reduce costs.
  • Implemented strategies to improve employee morale among the engineering team.
  • Assisted in troubleshooting complex problems related to design or process issues.
  • Monitored performance metrics such as safety, quality, productivity, and cost control to ensure engineering goals were met.
  • Directed the installation and commissioning of new machinery and equipment.
  • Identified potential risks associated with proposed products or processes before implementation.
  • Analyzed customer feedback data to identify opportunities for product development or improvement.
  • Conducted training sessions for new staff members on engineering processes, policies, and procedures.
  • Improved efficiency by implementing Lean and Six Sigma principles.

Inspector MEP

PT Kandu
10.2013 - 04.2014
  • Performed regular maintenance checks on production lines to identify any issues needing repair or replacement.
  • Documented all inspection results accurately in accordance with established guidelines.
  • Investigated customer complaints regarding product quality, reliability, or performance issues.
  • Analyzed data collected during inspections to ensure accuracy and consistency.
  • Participated in internal audits to evaluate the effectiveness of current quality control measures.
  • Conducted detailed inspections of equipment and machinery to ensure they were in compliance with safety regulations.
  • Maintained accurate records of all tests conducted during the inspection process.
  • Provided technical support for the development and implementation of quality control systems and procedures.
  • Evaluated the effectiveness of existing quality control systems and made recommendations for changes or improvements as necessary.
  • Identified any potential hazards or areas that needed improvement through visual inspection and testing.
  • Reported and tracked deviations from quality standards and recommended corrective action to appropriate personnel.
  • Performed visual and NDT inspections using established tools to identify defects.
  • Reviewed technical documents to verify code and safety compliance in both electronic and paper formats.

Supervisor MEP

PT Global Konsultan
04.2008 - 09.2013
  • Monitored employee productivity levels on a regular basis to identify areas of improvement.
  • Created new strategies for improving customer service standards within the organization.
  • Developed and implemented operational policies and procedures to ensure efficiency and accuracy of workflows.
  • Trained new employees on company policies and procedures.
  • Ensured compliance with workplace safety regulations by providing training sessions for all staff members.
  • Conducted weekly meetings with team members to discuss upcoming tasks and project deadlines.
  • Identified opportunities for process improvements, leading to cost reductions and increased productivity.
  • Implemented quality control measures, significantly reducing error rates.
  • Addressed and resolved interpersonal conflicts within the team, maintaining a harmonious work environment.
  • Acted as a liaison between upper management and staff, facilitating open communication.
  • Utilized document management system to organize company files, keeping up-to-date and easily accessible data.
  • Identified areas for improvement, narrowing focus for decision-makers in making necessary changes.

Education

Bacholer (S1) - Mechanical Engineering

University of Muhammadiyah Jakarta
Jakarta
01.2007

Vocation High School - Automotive Engineering

Vocation High School Science And Technology Jakarta
Jakarta
01.2001

Junior High School -

Junior High School Negeri 1 Bekasi
Bekasi
01.1998

Skills

  • Competency Assessor Construction
  • Project management
  • Employee training
  • Team management
  • Quality control
  • Safety compliance
  • Risk assessment
  • Customer service
  • Operational Supervisor Construction and Maintenance
  • Plan and Control MEP Project and Maintenance
  • Mechanical, Electrical, Plumbing Engineer Supervisor
  • Technical documentation
  • Computer operation (Microsoft Office, Design)
  • Staff management
  • Policy communication
  • Task execution
  • Rule enforcement
  • Staff performance evaluation
  • Teamwork evaluation
  • Work planning
  • Shop drawing review

Certification

  • BNSP (SKK Utama Elektrikal), F1997 06261 2023 0231959 ME05
  • BNSP (SKK Utama Mekanikal), F1997 01243 2025 0231595 ME05
  • BNSP (SKK Utama Manajemen Konstruksi), F2292 01244 2025 0231595 MP01
  • Awareness ISO 9001:2015, 14001:2015, 45001:2018
  • POP Competency, 025 00875 2024
  • Asesor BNSP, MET000 005363 2024

Accomplishments

  • The installation work on the main power house was achieved according to schedule.
  • Achieved installation work on the low voltage distribution panels to the distribution panels in the field.
  • Achieved installation work on the fire pump system and clean water supply system in the airport area.
  • Achieved the air conditioning system for aircraft passengers from the chiller cooling tower installation to the AHU.
  • Achieving pipe installation work for dirty water as well as processing dirty and used water waste from buildings and the remains of airplane passengers.

Languages

English, Medium

Personal Information

  • Date of Birth: 08/06/83
  • Gender: Male
  • Nationality: Indonesia
  • Marital Status: Married
  • Religion: Islam

Conclusion

Thus I made this CV, I really hope to be able to join and contribute to the company.

Timeline

MEP Supervisor

Ceria Metalindo Prima
03.2025 - Current

Site Manager

PT Jianan Eng
12.2023 - 03.2024

Inspector MEP

PT Kandu
06.2022 - 11.2023

Site Engineer

PT Tohir Mandiri Jaya
10.2020 - 06.2021

Engineering Supervisor

PT Asahi Syncrotech
07.2017 - 10.2020

Engineering Supervisor

PT Shinryo Ind
04.2014 - 06.2017

Inspector MEP

PT Kandu
10.2013 - 04.2014

Supervisor MEP

PT Global Konsultan
04.2008 - 09.2013

Bacholer (S1) - Mechanical Engineering

University of Muhammadiyah Jakarta

Vocation High School - Automotive Engineering

Vocation High School Science And Technology Jakarta

Junior High School -

Junior High School Negeri 1 Bekasi
Achmad Baiquni