Summary
Overview
Work History
Education
Skills
Recent Work
Quote
Accreditations
References
Timeline
Generic

Adam Roy Dowsett

Nobel Park

Summary

To gain employment in civil, rail and mining structural or building works in the construction industry. To fulfill clients expectations to the highest level, meet timelines in successfully completing project tasks in a safe incident free working environment.

- A proven work history in the related fields of government funded commercial building and civil construction. - Ability to handle multiple assignments under high pressure and consistently meet tight deadlines within budget. - Ability to communicate with engineers in regards to drawings, briefs development of the project and time frames - A team leader and participant who is dedicated and supportive to our workforce - Focused on health and safety procedures. - Background trades; rigger, concreter, carpenter, formworker, steel fixer, pipe laying and drainage, structural erection.

Overview

9
9
years of professional experience

Work History

Rigger

BHP/CPB
Olympic Dam, SA. Mt Kieth, WA.
01.2023 - 07.2024

Completed various shutdown periods of work at Olympic Dam, South Australia, rigging for Franna, 140 t, 160 t, 80t. Mills upgrade, Process plant and furnace upgrades. Permanent 3:1 roster for CPB at Mt Kieth, Nickle West.

Shutdown rigger

BHP/CPB
Port Headland
01.2021 - 01.2022

Ongoing back to back shutdowns for mine maintenance and change out of mine machinery parts, crushers, shutes, belts, rollers, belt pulleys and brake systems, spools and piping.

Rigger

Rio Tinto
Weipa
01.2021 - 01.2022

Various rigging duties for site maintenance and new structural buildings.

Strip outs demolition rigger

J&D Qbuild
Mt Isa
01.2021 - 01.2022
  • Re-finishing works of government buildings/housing

Structural buildings team member

RIA Metro John Holland Group
01.2020 - 01.2021
  • Sunbury Rail Upgrade station and platform works
  • Hand over to client various stages for approval under completion of defects lists of structural concrete works such as capping beams, walls and overhead t-beams joining into the Metro Tunnel Kensington
  • Various station upgrade building and finishing works

Rigger

John Holland Group
01.2019 - 01.2020
  • Stabilization works exit cut Millers Road
  • As excavations continued to cut deeper for the exit ramp of the Westgate Tunnel our works involved drilling and installation of rock and saw nails, followed by preparations and completion of shotcrete walls, drainage and base slab foundations

Rigger/Dogman

John Holland Group
01.2017 - 01.2019
  • Early works for the Metro Tunnel involved relocation of all services, piling and capping beams
  • Followed by excavation of shafts, installation and rigging of steel perimeter beams and prop reinforcements
  • Demolition and reinstatement of a four level carpark to make provisions for the shaft excavation of this site

Worker

John Holland Group
01.2016 - 01.2017
  • Ormond, Mckinnon and Bentley level crossing removal and station upgrades
  • Working in both structures and buildings this project reinstated the rail track to descend under the roads eliminating traffic/train/pedestrian hazardous interaction
  • Redevelopment and upgrade of three stations which heavily involved the access for the public infrastructures including station carparks, shared user paths, concourse ramps, lift shafts and station platforms

Education

Degree - Technical Illustration

Melbourne School of Design
Caulfield
12.2002

Skills

Able to interpret plans and drawings

OH&S site specific safety awareness

Good communication skills within a team

Recent Work

  • BHP/CPB, Port Headland, Shutdown rigger, 01/21 - 12/22
  • Rio Tinto Amrun Bauxite Mine, Weipa, Dogman/Rigger, concreting, steel fixing and formworking, 01/21 - 12/22
  • J&D Qbuild, Mt Isa, Strip outs demolition rigger and refinishing works of government buildings/housing, 01/21 - 12/22
  • RIA Metro John Holland Group, Sunbury, Working within both the structural buildings team. Sunbury Rail Upgrade station and platform works., 01/20 - 12/21
  • Metro Tunnel, South Yarra, Rigger for structural reinforcements for the Tunnel Boring Machine breakthrough Eastern Portal, 01/20 - 12/20
  • Westgate Tunnel Project, John Holland Group, Stabilization works exit cut Millers Road, 01/19 - 12/20
  • Metro Tunnel early works, CBD North and CBD South, Early works for the Metro Tunnel involved relocation of all services, piling and capping beams., 01/17 - 12/19
  • John Holland group, Ormond, Mckinnon and Bentley, Working in both structures and buildings this project reinstated the rail track to descend under the roads., 01/16 - 12/17

Quote

At the end of the day we all go home safe

Accreditations

  • Cert4 Building & Construction
  • White Card
  • High Risk EWP/Boom/Scissor/WAH
  • High Risk Intermediate Rigger
  • Confined Space
  • First Attack Fire Fight Equip
  • Roller Operator
  • Rail Industry Worker

References

  • Steve Testolin, John Holland Group
  • Kerry Brand, John Holland Group
  • Luke Linaker, John Holland Group

Timeline

Rigger

BHP/CPB
01.2023 - 07.2024

Shutdown rigger

BHP/CPB
01.2021 - 01.2022

Rigger

Rio Tinto
01.2021 - 01.2022

Strip outs demolition rigger

J&D Qbuild
01.2021 - 01.2022

Structural buildings team member

RIA Metro John Holland Group
01.2020 - 01.2021

Rigger

John Holland Group
01.2019 - 01.2020

Rigger/Dogman

John Holland Group
01.2017 - 01.2019

Worker

John Holland Group
01.2016 - 01.2017

Degree - Technical Illustration

Melbourne School of Design
Adam Roy Dowsett