Summary
Overview
Work History
Education
Skills
Certification
Software
Interests
Additional Information
Travelling, Sports, Game
Timeline
Generic
AFIKLI  YUDHA

AFIKLI YUDHA

MEP Superintendent
Bekasi

Summary

  • At PT. Takenaka Indonesia, I led MEP engineering projects to completion under budget and ahead of schedule, showcasing exceptional team collaboration and problem-solving aptitude. I expertise in MEP coordination and strong negotiation skills resulted in a 20% increase in client satisfaction and project efficiency.
  • Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
  • To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
  • Seasoned Construction professional with exceptional leadership and project management skills. Competent in team, budget and schedule oversight. Develops scopes, checks field activities, and updates clients.
  • Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.
  • Results-driven professional leads, motivates and collaborates with teams of mechanics. Experienced in troubleshooting and diagnosing repair issues. Committed to implementing best practices and standards to deliver customer satisfaction.
  • MEP Engineer experienced formulating cost estimates while working under tight budget constraints within construction. Selected high-quality products and materials for projects without breaking budget. Inspected and evaluated facilities for compliance to design and codes and to inspire future projects.
  • MEP Engineer experienced in design and maintenance of mechanical, electrical and plumbing systems for facilities. Interpreted architectural designs and engineering schematics to best route electrical and plumbing. Updated designs with as-built drawings and entered data into systems for facility maintenance. Sought solutions for issues concerning.

Overview

11
11
years of professional experience
16
16
years of post-secondary education
2
2
Certifications
3
3
Languages

Work History

MEP Superintendent

PT. Takenaka Indonesia
Jakarta, JK
02.2021 - Current
  • Ensured compliance with local building codes, industry standards, and safety regulations throughout all stages of construction.
  • Facilitated effective communication among team members by conducting regular progress meetings with key stakeholders across functions.
  • Increased overall project profitability by identifying opportunities for value engineering during design phase of projects.
  • Developed comprehensive project schedules to effectively allocate resources and meet key deadlines.
  • Managed multiple MEP projects simultaneously, ensuring timely completion within budget constraints.
  • Mentored junior staff members on best practices in MEP management, contributing to their professional growth and success within organization.
  • Coordinated with subcontractors to ensure adherence to project specifications, budgets, and timelines.
  • Collaborated with architects and engineers to ensure seamless integration of MEP systems into overall building design.
  • Optimized energy consumption for various facilities through implementation of efficient HVAC systems and controls.
  • Continuously improved project management skills through ongoing professional development, staying current on industry trends and best practices.
  • Improved MEP project efficiency by streamlining communication and coordination between engineering, design, and construction teams.
  • Leveraged strong negotiation skills in securing favorable contract terms with vendors and subcontractors while maintaining positive working relationships.
  • Managed project documentation including submittals, RFIs, change orders, and closeout documentation for clear communication with stakeholders.
  • Oversaw commissioning activities for completed projects to ensure proper functioning of all MEP systems prior to occupancy handover.
  • Conducted site inspections to verify adherence to design specifications and maintain high-quality workmanship from contractors.
  • Implemented quality control processes for MEP installations, resulting in reduced callbacks and increased client satisfaction.
  • Provided technical expertise on complex mechanical designs involving HVAC systems, plumbing fixtures, and electrical systems.
  • Reduced downtime during construction by proactively identifying potential issues and implementing corrective measures.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Prepared detailed project estimates and reports for management review.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Scheduled utility service providers according to project timelines.
  • Collaborated with structural engineers to evaluate structural integrity of projects.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Analyzed and evaluated construction bids to select most cost-effective contractors.
  • Used computer software to design construction plans and perform calculations.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
  • Led design and development of residential and commercial buildings.
  • Negotiation cost to vendors or subcontractor until 20%
  • At PT. Takenaka Indonesia, I led MEP engineering projects to completion under budget and ahead of schedule, showcasing exceptional team collaboration and problem-solving aptitude. I expertise in MEP coordination and strong negotiation skills resulted in a 20% increase in client satisfaction and project efficiency.

Senior MEP Engineer

PT. Takenaka Indoensia
Jakarta, JK
02.2016 - 02.2021
  • Monitored systems to assure increase in power flow and integrated new system components, fixtures and motors.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
  • Managed efficient teams of up to 500 employees.
  • Efficiently assisted service workers with problematic transactions to maintain customer satisfaction and quickly rectify issues.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Created and maintained daily and weekly reports for upper management
  • Scheduled and oversaw maintenance, repair and installation activities
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers
  • Utilized proper tools and materials to adhere to safety guidelines
  • Organized ongoing maintenance schedules to boost system performance

MEP Engineer

PT. Takenaka Indonesia
02.2013 - 02.2016
  • Optimized HVAC systems for increased comfort and reduced energy consumption.
  • Performed detailed load calculations for accurate sizing of equipment and distribution systems.
  • Managed project timelines, ensuring timely completion of all MEP engineering tasks.
  • Ensured adherence to safety regulations and industry standards in all aspects of MEP engineering work.
  • Provided expert guidance on local building codes, ensuring compliance throughout the design process.
  • Developed comprehensive technical reports detailing project progress and recommendations for improvement.
  • Collaborated with architects and other engineers for seamless integration of MEP systems into building design.
  • Reduced overall costs through value engineering practices while maintaining high performance standards in system designs.
  • Resolved complex engineering challenges through creative problem-solving and collaboration with multidisciplinary teams.
  • Increased client satisfaction by effectively communicating project updates, addressing concerns promptly, and delivering projects on time and within budget constraints.
  • Interpreted architectural designs and engineering plans for systems, new construction and existing facilities.
  • Minimized disruptions during construction by developing effective phasing plans for installation of MEP systems within occupied buildings.
  • Enhanced building performance through the development of sustainable MEP designs.
  • Evaluated vendor bids, selecting high-quality suppliers for cost-effective procurement of materials and equipment.
  • Utilized advanced software programs to create precise MEP designs and simulations.
  • Carefully analyzed completed projects and studies for compliance with established budgets and policies.
  • Improved MEP system efficiency by designing and implementing energy-saving solutions.
  • Implemented cutting-edge technologies in MEP designs, staying ahead of industry trends and advancements.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Managed multiple MEP projects simultaneously, ensuring timely completion within budget constraints.
  • Coordinated with subcontractors to ensure adherence to project specifications, budgets, and timelines.
  • Collaborated with architects and engineers to ensure seamless integration of MEP systems into overall building design.
  • Optimized energy consumption for various facilities through the implementation of efficient HVAC systems and controls.
  • Improved MEP project efficiency by streamlining communication and coordination between engineering, design, and construction teams.
  • Leveraged strong negotiation skills in securing favorable contract terms with vendors and subcontractors while maintaining positive working relationships.
  • Oversaw commissioning activities for completed projects to ensure proper functioning of all MEP systems prior to occupancy handover.
  • Conducted site inspections to verify adherence to design specifications and maintain high-quality workmanship from contractors.
  • Implemented quality control processes for MEP installations, resulting in reduced callbacks and increased client satisfaction.
  • Provided technical expertise on complex mechanical designs involving HVAC systems, plumbing fixtures, and electrical systems.
  • Reduced downtime during construction by proactively identifying potential issues and implementing corrective measures.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Used computer software to design construction plans and perform calculations.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Scheduled utility service providers according to project timelines.
  • Collaborated with structural engineers to evaluate structural integrity of projects.

Education

Bachelor of Science - SKK MIGAS

Institute Sains Tecnology National
Jakarta
08.2015 - 08.2016

High School Diploma -

State Polytechnic of Jakarta
Depok , Indonesia
06.2009 - 08.2024

Skills

Load Calculations

MEP Coordination

Site Inspections

As-Built Documentation

Coordination Drawings

Value Engineering

Shop Drawing Review

Plumbing Systems Design

Electrical Systems Design

Field Reports

Proposal Development

Sustainable design

Equipment Selection

Technical Presentations

Mechanical Systems Design

Navisworks Proficiency

Cost Estimation

Clash Detection

Work Estimation

Vendor Relationship Management

Time management abilities

Schedule Preparation

Standards Conformance

Personnel Management

Team Collaboration

Problem-solving aptitude

Accident and Injury Investigation

Employee Safety Training

Maintenance Planning

Construction Methods

Effective Communication

Customer Relations

Visual Inspection

Work Area Inspection

Skilled Maintenance and Repair

Cross-Functional Collaboration

Teamwork and Collaboration

Problem-Solving

Tools and Equipment Maintenance

Time Management

Problem-solving abilities

Excellent Communication

Decision-Making

Analytical and Critical Thinking

Adaptability and Flexibility

Active Listening

Organizational Skills

Safety Compliance

Team building

Professional Communication

Analytical Thinking

Relationship Building

Adaptability

Employee Motivation

Schedule Management

Policy and Procedure Writing

Analytical Skills

Certification

The Occupational Safety and Health ( OSH )Technical Training of Electrical

Software

Naviswork

Ms office

Interests

Data Center

Oil and Gas Construction

Smelter Construction

EPC construction

MEP systems at Data Center and Oil and Gas

Additional Information

  • My Name is Afikli Yudha as MEP Superintendent I handled a lot project like : PT. Lotte Indonesia, PT. YKK Zipco Factory ( 1,2,3,4 ) , PT. Shibaura, PT. Toyota Auto Compressors Indoensia, PT. Mitsubishi Logistics Indonesia, PT. Emina cheese Indonesia, PT. Kaneka Foods Indonesia, PT. NIPPN Products Indonesia, PT. Sugity Creatives Indonesia, PT. Hanwa Steel Indonesia, PT. Sankyo Indonesia, PT. YKK AP Indonesia.
  • During work at PT. Takenaka Indonesia i got best project for PT. LOTTE indonesia ( 2014 ) and PT. Mitsubishi Logistics Indonesia ( 2017 ) from takenaka international
  • I got best safety performance PT. Takenaka Indonesia at 2019.

Travelling, Sports, Game

  • I had go to japan , Bali, and another beautiful place at indonesia.
  • I like culinary during travelling
  • I like football and jogging
  • i like play playstation with my son and my brother

Timeline

The Occupational Safety and Health ( OSH ) Technical Training of Cinfined Space

11-2021

MEP Superintendent

PT. Takenaka Indonesia
02.2021 - Current

The Occupational Safety and Health ( OSH )Technical Training of Electrical

04-2017

Senior MEP Engineer

PT. Takenaka Indoensia
02.2016 - 02.2021

Bachelor of Science - SKK MIGAS

Institute Sains Tecnology National
08.2015 - 08.2016

MEP Engineer

PT. Takenaka Indonesia
02.2013 - 02.2016

High School Diploma -

State Polytechnic of Jakarta
06.2009 - 08.2024
AFIKLI YUDHAMEP Superintendent