Summary
Work History
Education
Skills
Software
Certification
Timeline
Generic
AHMAD FURKON ABDILLAH

AHMAD FURKON ABDILLAH

Electrical Engineer
Tangerang

Summary

I am a Systematic Electrical Engineer with six years of experience in maintenance and managing the electrical project lifecycle from the design phase to delivery and implementation. Polished in analyzing, troubleshooting, and developing solutions. a focused electrical engineer with a background in operating various automation systems from Field Level Until Supervisor Level. In-depth understanding of control and power-delivery systems like PLC Programming, SCADA, DCS, HMI Design, Panel Design, and Commissioning AC and DC drives, including Motors.

Work History

Assistant Section Head

PT GajahTunggal Tbk
Tangerang
01.2023 - Current

Job Description

  • Planning, controlling, and analyzing preventive, corrective, and predictive maintenance activities monthly and yearly in more than 40 material tire machines and 7 variants. Make daily, monthly, and yearly electrical section problem reports.
  • Coordinate team maintenance and repair activities following the planned schedule by prioritizing repair quality, Health, Safety, and the environment.
  • Ensure the availability of spare parts and tools before maintenance and repair.
  • Control the documentation of activities related to machine maintenance and repair.
  • Evaluate and review machine maintenance and repair activities.
  • Coordinate budget planning with the Department Head for machine maintenance and repair.
  • Implement the audit suggestions and findings.


Accomplishment

  • Became the QCC leader in a project to reduce the usage of bias cutting variants, which increased productivity on six machines by 10% per machine.
  • Completed the Autobrake Project to improve material quality by integrating Mitsubishi PLC, SMC Auto Regulator, and IFM Laser Sensor Distance on six Bias Cutting Machines.
  • Completed the manufacture of a new tire material machine from the design, wiring, and commissioning program to mass production in 2 months by integrating the PLC and Scada system.

Team Leader Engineer

PT GajahTunggal Tbk
Tangerang
01.2020 - 12.2022

Job Description

  • Supervise the implementation of maintenance and repair of machines following work instructions and planned schedules by prioritizing the quality of repairs, K3, and Environmental requirements
  • Organize and assign personnel for Maintenance work following personnel competencies.
  • Ensure maintenance and repair records are entered into the ERP system
  • Identify spare part needs for maintenance and repair of machines and provide input for Preventive Maintenance schedule items
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.


Accomplishment

  • Modifying 2 machines with PLC OMRON to Mitsubishi.
  • Modify Control DC Drive Migration from Siemens Simoreg to ABB DCS in 1 day
  • Designing and assembling control panels for 6 bias cutting machines for refurbishment.
  • Commissioning AC Drive (inverter) and DC Drive with motors of various types (Mitsubishi, Sumitomo, Siemens, Yaskawa, Hitachi, and ABB)
  • Build wireless communication for remote PLC monitoring system of 10 priority machines.

Staff Electrical Engineer

PT GajahTunggal Tbk
Tangerang
09.2017 - 12.2019

Job Description

  • Use and maintain work tools according to their type and quantity.
  • Carry out all maintenance activities with attention to quality, Health, Safety, and the environment (K3L).
  • Provide reports on potentially damaged and dangerous machines related to the making of maintenance schedules and machine repairs.
  • Coordinate with Team Leaders regarding maintenance and repair activities for production machines and 5S.
  • Make Proof of Goods related to the need for spare parts for the maintenance and repair process.
  • Make daily reports on activities that have been carried out and closing work orders.
  • Perform minor repairs and findings that occur during maintenance inspections.
  • Proposed electrical product and system modifications to improve quality and efficiency.


Accomplishment

  • Understanding and Analysis of Tire Material Machines: As many as 30 machines with 10 machine variants through an integrated PLC Program
  • Understand the Installation and Analysis of AC and DC Drive problems (Mitsubishi, Siemens, ABB, Yaskawa, Sumitomo, Hitachi, etc.).
  • Understand the installation and problem analysis of AC, DC, and Servo Motors (Siemens, SEW, ABB, Motovario, Teco, etc.).
  • Understand PLC Program Installation and Problem analysis. Mitsubishi, Omron, and Siemens
  • Understand Mitsubishi and Siemens SCADA HMI Installation & Problem Analysis

Education

Diploma III - Electrical Engineering

Politeknik Gajah Tunggal
Tangerang, Banten INDONESIA
09.2014 - 09.2017

Bachelor of Engineering - Electrical Engineering

Universitas Yuppentek Indonesia
Tangerang, Banten, INDONESIA
10.2022 - 10.2023

Skills

    Coordinating Team

undefined

Software

GX DEVELOPER MITSUBISHI

GT DESIGNER MITUSBISHI

CX ONE OMRON

CX PROGRAMER OMRON

STARTER SIEMENS

WINCC SIEMENS

SIMATIC MANAGER SIEMENS

AUTOCAD

VISUAL STUDIO

MICROSOFT EXCEL

MICROSOFT WORD

MICROSOFT OUTLOOK

MICROSOFT VISIO

Certification

Piping For Industri

Timeline

Assistant Section Head

PT GajahTunggal Tbk
01.2023 - Current

Bachelor of Engineering - Electrical Engineering

Universitas Yuppentek Indonesia
10.2022 - 10.2023

Team Leader Engineer

PT GajahTunggal Tbk
01.2020 - 12.2022

Piping For Industri

03-2019

IATF 16949 : 2016 Level 2

05-2018

SML ISO 14001 : 2015 Level 2

04-2018

Basic K3

03-2018

Basic PLC Siemens

01-2018

Staff Electrical Engineer

PT GajahTunggal Tbk
09.2017 - 12.2019

Diploma III - Electrical Engineering

Politeknik Gajah Tunggal
09.2014 - 09.2017
AHMAD FURKON ABDILLAHElectrical Engineer