Summary
Overview
Work History
Education
Skills
Timeline

Alif Hadani Alif

Staff Maintenance Engginering In Port Of Surabaya
Surabaya

Summary

Dynamic Staff Engineer with a proven track record at PT Pelindo Daya Sejahtera, excelling in performance optimization and project management. Spearheaded process improvements that enhanced project efficiency. Adept in technical writing and committed to delivering high-quality engineering solutions.

Engineering professional with comprehensive background in leading technical projects and delivering high-quality results. Known for fostering collaborative team environments and adapting to evolving project requirements. Expertise in systems engineering and process optimization, with focus on reliability and performance.

Qualified engineering in civil facility with solid background in engineering and proven ability to lead complex projects to completion. Successfully improved system efficiencies and enhanced team productivity through innovative solutions. Demonstrated expertise in problem-solving and project management.

Detail-oriented, organized, and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Competent Engineering professional offering foundation in engineering project management and design. History of success in performing load and cost calculations and establishing clear parameters. Detail-oriented with strong knowledge of maintaining facility, CAD Drawing Programe, Microsoft Office and SAP 2000

Professional engineer prepared for this role with strong background in engineering principles and technology development. Experienced in collaborating with cross-functional teams to deliver impactful solutions and adaptable to evolving project needs. Skilled in software development, systems architecture, and troubleshooting. Known for reliability, problem-solving, and results-driven approach.

Overview

12
12
years of professional experience
7
7
years of post-secondary education

Work History

Staff Engineer

PT Pelindo Daya Sejahtera
Surabaya, Jl Perak Timur No 620, Pabean Cantian, Surabaya
01.2017 - Current
  • Managed multiple concurrent projects, ensuring timely completion and adherence to budget constraints.
  • Presented technical findings and recommendations to key stakeholders with clarity, supporting informed decision-making processes.
  • Implemented process improvements that streamlined workflows, reducing lead times for project deliverables significantly.
  • Improved project efficiency by streamlining communication between team members and stakeholders.
  • Facilitated effective team collaboration by establishing clear goals and expectations, leading to higher morale and increased productivity.
  • Leveraged expertise in advanced simulation tools, optimizing designs to achieve improved performance and reliability.
  • Designed and implemented innovative solutions for complex engineering problems, resulting in increased productivity.
  • Conducted thorough analyses of existing systems to identify areas for improvement and recommend viable upgrades.
  • Enhanced product quality through rigorous testing procedures, identifying defects and proposing corrective actions.
  • Optimized resource allocation by developing and implementing data-driven project management strategies.
  • Spearheaded initiatives aimed at enhancing workplace safety protocols, resulting in a notable decrease in accidents or incidents reported within the company facilities over time.
  • Evaluated potential risks proactively during project planning stages, allowing for proper mitigation measures to be put in place early on.
  • Scoped project timelines accurately by leveraging strong analytical skills, enabling successful delivery within deadlines.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Developed cost estimates and project specifications for proposals.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Participated in formal internal design reviews of proposed products and components.
  • Monitored and evaluated engineering performance to recommend improvements.
  • Developed comprehensive engineering documents for all projects.
  • Led engineering teams to successfully complete projects on time and within budget.
  • Trained and mentored junior engineers, providing guidance and direction.
  • Designed and implemented quality control processes to facilitate customer satisfaction.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Developed high-quality engineering designs and plans to meet industry standards.
  • Documented and developed engineering procedures and processes.
  • Verified construction documentation to meet client requirements and vision.
  • Collaborated with other departments to facilitate successful project completion.
  • Conducted technical evaluations of engineering designs and test results.

Drafter

Personal
Surabaya, East Java
04.2015 - 06.2015
  • Used computer-aided design software to prepare blueprints and schematics.
  • Reviewed specifications to generate complex details of individual system components.
  • Created, printed, and modified drawings in AutoCAD and SAP 2000.
  • Evaluated information provided by architects and system subcontractors and created accurate drawings according to measurements and specifications.
  • Developed expertise in multiple industry-specific CAD programs, allowing flexibility in working on diverse projects with varying requirements.
  • Enabled a more seamless transition from design to construction by coordinating closely with contractors and providing them with all relevant documentation.

Project Manager

CV Bangun Megah Perkasa
Surabaya, East Java
08.2014 - 01.2015
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Identified plans and resources required to meet project goals and objectives.
  • Monitored project performance to identify areas of improvement and make adjustments.

Education

Bachelor of Science - Civil Engineering

Sepuluh Nopember Institute of Technology, Surabaya, Indonesia
01.2016 - 08.2019

Post-Baccalaureate Diploma - Civil Engineering

Sepuluh Nopember Institute of Technology, Surabaya, Indonesia
08.2011 - 08.2014

Skills

Performance optimization

Software architecture design

Data structures

Project estimation

Cost analysis

Collaborative design

Technical writing

Project management

Construction oversight

Process improvement

Technical reporting

Bid drafting

System design

Team collaboration

Material selection

Time management

Critical thinking

Quality control

Project planning

Structural analysis

Engineering documentation

Budget management

Topographic surveying

Proposal presentation

Construction engineering

Drawing creation

AutoCAD drawing

Self motivation

Teamwork and collaboration

Technical drawings

Construction management

Timeline

Staff Engineer - PT Pelindo Daya Sejahtera
01.2017 - Current
Sepuluh Nopember Institute of Technology - Bachelor of Science, Civil Engineering
01.2016 - 08.2019
Drafter - Personal
04.2015 - 06.2015
Project Manager - CV Bangun Megah Perkasa
08.2014 - 01.2015
Sepuluh Nopember Institute of Technology - Post-Baccalaureate Diploma, Civil Engineering
08.2011 - 08.2014
Alif Hadani AlifStaff Maintenance Engginering In Port Of Surabaya