

A Professional Commissioning at The Coal-Fired Steam Power Plant and have been involved in The Commissioning, Start-Up, and COD (Commercial Operation Date) Periods: CFSPP 2x200 MW Unit 3 and 4 Pangkalan Susu, North Sumatera, Indonesia CFSPP 2x50 MW Unit 1 and 2 Tanjung Karang, Gorontalo, Indonesia A Professional Commissioning Operation Engineer at The Combined Cycle Power Plant: CCPP Add-On Project 650 MW (Block 2, 3 & 4) Muara Tawar, West Java, Indonesia A Professional Mechanical Engineer at The Combined Cycle Power Plant: CCPP Project 850 MW Block 3 Tambak Lorok, Semarang & Jawa Satu Power, Cilamaya. Professional Commissioning Operator and Commissioning Operation and Mechanical Engineering in steam and combined steam and gas power plant more than 5 years. Experienced with warranty claims management, ensuring timely and accurate resolutions. Utilizes technical problem-solving skills to identify root causes and implement effective solutions. Track record of fostering strong relationships with stakeholders and maintaining high levels of customer satisfaction.
Warranty claim analysis
Root-cause analysis
Skilled at analyzing and troubleshooting the failures in the local site
Power plant efficiency analysis
Turbine operation troubleshooting
Water treatment troubleshooting