
26 years of working experience as a Supervisor Rigger/Inspector Scaffolding/Performing Authority in Oil-Gas and Construction Projects, with solid knowledge of the technical aspects of Lifting, Scaffolding, and Commissioning Processes. I hold an International Certificate No. 13419067210120011 OPITO (Banksman and Slinger Training Stage 1) and a BNSP Certification for Rigger. I am certified and experienced as a Performing Authority in Mechanical Commissioning Process, Leak Tests (managing line-up points for purging), and PSV & Equipment Preservation. Additionally, I know and be able to understand P&ID.
1.1 Support Lifting all Procject Regas SLTR West Sumbawa Amman Project. Doing Lifting Acitivities all of materials SLTR Regas Amman Project, like as Structure Beam, Modul, Equipment, Compressor A, B, C Engine in BOG UTILITY Area.
1.2 Support Lifting loading/unloading SLTR Project Regas Procject; Doing Lifting Activities all of materials, eguipment, modul of City SLTR Regas Project loading unloading according to Request of Material Control SLTR Regas West Sumbawa.
1.3 Support Team Mechanical Static and Rotating, in manner installating and Assambeling Modul, Equipment, Parts Compressor, Etcetera, and in BOG Area, Regas, Equalizer, Utility. Eguipment Rotating in Rigger Area, include Utility, Bog, Equalizer.
1.4 Support Team Jetty Head Team Mechanical for Isntall Modul Loading Arm not only in Laydown Area but also in Jetty Head; Now still hold on Loading Unloading and Lifting Activities in Jetty Head, Laydown area and Equipment preparation toll Pre Commisioning.
1.1 Support Mechanical Rotating & PSV; Monitoring lifting activities in 207.202.205 Area. Supporting PT. JEL in Project TA until Completion.
1.2 Discussing about Lifting Activities Planning with Pertamina Team According to Procedure Perspective, SIMOB Meeting, and joint together with the Company near by our activities.
1.3 Support Lifting all Project Lotte Chemical; Monitoring Lifting activities pipe Spool. Supporting Static Menchanical in all area: WP 1& WP 7 by Crane 55 Sany & Tadano 80.
1.4 Making installation of JSA joint with HSE Hein Team for Lifting Heavy Activities.
1.5 Joining with Hein Team and Owner Lotte Project Team to evaluate te Work and doing Management Work True.
1.1 Doing Lifting structur activities, mechanical Rotating, Equipment and Jadestone.
1.2 Monitoring Work of Heavy lift for Lifting compressor A, B, C, in Akatara Project.
1.3 Evaluating Work after Work True Management in work location of area.
1.4 Support Assambeling Structure Beam, Compressor Equipment and PSV until completed, with the other Teams.
1.1 Monitoring Lifting pipe Spool activities. Support Mechanical static in all area WP 1 &WP 7 by Crane 55 Sany & Tadano 80
1.2 Installating JSA with HSE Hein Team for Heavy Lift activities
1.3 Evaluating Work and doing Management Work True with Hein Team and Own Lotte Project Team
1.1 Making all of Permit in Tep 3 Constuction Project Area; Preparing all of Permit documents not only for Permit Hot Work Activities for installing pipe Spool 1 inch, buat also for until 45 inch in all Area
1.2 Doing Line Up Check before applied application to AA.OA where the spot would be mapping for our activities according to permit that we applied; Visiting with AA.OA Team before permit printed
1.3 Preparing all of tools and equipment for work before work; Evaluating Work on holding.
1.4 Knowing plane of Rescue Team about emmergency response according each our work area
1.1 Managed and authorized permits, including Cold Work, Hot Work, Spark Potential, and Confined Space Permits
1.2 Prepared supporting documents for equipment like cranes, generators, and compressors..
1.3 Coordinated with Area Authority to monitor work progress
1.4 Completed documentation for lifting, leak testing, purging (N2), hydrogen, pneumatic, and hydro testing, as well as water tank flushing
1.1 Supporting Lifting National Strategic Development Project: LRT, MRT and Train Railway, and Port over Indonesia Project
1.2 Doing Lifting activities loading/unloading and monitoring Project in Tangguh TAR 10.11 until the end as Maintenance Team
1.3 Making and preparing support documents for Lifting Permit in Project Area GOO Bp Tangguh West Papua by Crane Liebherr 300.200.110., Roughter Crane Kato 90.70., Forklift, Telehandler, TMC Trailer for supporting Train 1.2 and all of process Area
1.4 Managing Work True with HSE.AA. Team and Operation Bp. Tangguh Team a long TAR Work in holding
1.5 Monitoring Work in each area when Work in holding
1.1 Inspect Scaffolding Material at PT. Hally Save Warehouse
1.2 Infecting the Scaffolding that is being built
1.1 Inpect Scaffolding that has been completed in the Marine and Loading Arm area
1.2 Inpect Scaffolding that has been completed in Train One area
1.3 Inpect Scaffolding that has been completed in Train Twoarea
1.4 Inpect Scaffolding that has been completed in ORF
1.5 Inpect Scaffolding that has been completed in Utility
9.7 Inpect Scaffolding that has been completed in VR and VR
9.8 Make permits in all Tangguh LNG areas
1.1 Inspecting the Waste Water Treatment (WWT) project
1.2 Make a permit in the are of Waste Water Treatment
1.3 The head of the Scaffolding installation team in the Tangguh Site LNG area
1.4 The head of the Scaffolding installation team in the Babo Site area
1.5 Scaffolding Technician at Tangguh Site
1.6 Scaffolding Technician at the Bosowa Cement project
1 Software: Microsoft Word, Microsoft Excel, Microsoft Power Point
OPITO - PETROTEKNO
Certificate First Aider Lv2
OPITO - PETROTEKNO
Crane Operator Certificate
Certificate RIGGER
Certificate Basic Fire Fighting Course
Certificate Basic Sea Survival Course
Control of Work Course
INSPECTOR SCAFFOLDING
Scaffolding Inspector
Certificate of Accomplishment
Certificate of Achievement
Certificate Scaffolding Safety Training
Certificate Scaffolding Training Awareness