Summary
Overview
Work History
Education
Skills
Timeline
Generic

Christopher Howard

Spirit Lake,ID

Summary

Dynamic and results-driven professional with 18 years of experience in central office equipment installation at Ziply Fiber. Proficient in fiber optic systems and skilled in team leadership, achieving consistently high customer satisfaction through efficient installations and quality control measures. Committed to safety and continuous improvement in technical processes.

Results-driven professional prepared for equipment installation roles, bringing valuable experience in setting up and maintaining machinery. Known for reliability and adaptability, consistently delivering high-quality work while maintaining strong team collaboration. Skilled in interpreting technical documents, troubleshooting mechanical issues, and ensuring compliance with safety standards.

Overview

28
28
years of professional experience

Work History

Central Office Equipment Installer

Ziply Fiber
05.2007 - Current
  • Installed and configured fiber optic equipment to ensure optimal performance and reliability.
  • Conducted thorough site assessments to determine installation requirements and project specifications.
  • Collaborated with engineering teams to develop efficient installation processes and workflows.
  • Trained junior installers on best practices for equipment handling and safety protocols.
  • Troubleshot and resolved installation issues promptly, minimizing downtime for clients.
  • Implemented quality control measures to enhance overall service efficiency and customer satisfaction.
  • Supervised installation teams, ensuring adherence to safety standards and project timelines.
  • Streamlined equipment setup procedures, reducing overall installation time while maintaining high-quality standards.
  • Performed daily equipment checks by recharging batteries and lubricating equipment parts.
  • Oversaw inventory management processes related to installation projects, ensuring adequate supplies were available when required.
  • Assisted coworkers as needed during large-scale projects, promoting teamwork and efficiency within the organization.
  • Expanded technical knowledge through continuous professional development, staying current with industry trends and advancements in technology.
  • Provided detailed documentation of each installation, allowing for streamlined future service and support.
  • Reduced downtime for clients by completing timely and efficient equipment installations.
  • Achieved consistently positive feedback from clients for exemplary workmanship and attention to detail in equipment installations.
  • Consistently met project deadlines, contributing to successful completion rates for the company''s installations division.
  • Increased customer satisfaction by providing knowledgeable guidance on proper equipment usage and maintenance.
  • Performed comprehensive testing to verify optimal functionality post-installation, ensuring client satisfaction.

Cable Technician

Verizon
04.2004 - 05.2007

Ran aerial and underground equipment for the placement of cable to expand and repair network

Backhoes, plow cat, vibratory plows, pole climbing, digger derricks, T40 stringer, Manhole/conduit systems, placement of aerial plant, underground cable and direct bury cable

Have current Class A CDL

Supervised daily operations of linemen teams to ensure safe and efficient project completion.

  • Coordinated equipment maintenance schedules to minimize downtime and enhance productivity.
  • Trained new linemen on safety protocols, tools usage, and best practices in line installation.
  • Managed project timelines and resource allocation for multiple electrical line installations simultaneously.
  • Collaborated with engineering teams to address technical issues and optimize installation processes.
  • Supervised crews in diverse weather conditions while maintaining a focus on safety, quality, and productivity.
  • Led emergency response efforts during power outages or storm damage restoration operations to quickly restore electricity access for affected communities.
  • Operated heavy machinery to complete construction tasks efficiently.
  • Inspected job sites for safety compliance and quality assurance.
  • Collaborated with team members to execute project plans effectively.
  • Assisted in training new technicians on equipment usage and safety protocols.
  • Implemented improved workflows to enhance project completion timelines.
  • Mentored junior staff, fostering skill development and teamwork.
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
  • Erected and removed temporary structures such as trench liners and scaffolding to meet team needs.

Construction Technician

Verizon
05.2002 - 04.2004

Ran aerial and underground equipment for the placement of cable to expand and repair network

Backhoes, plow cat, vibratory plows, pole climbing, digger derricks, T40 stringer, Manhole/conduit systems, placement of aerial plant, underground cable and direct bury cable


Have current Class A CDL


Supervised daily operations of linemen teams to ensure safe and efficient project completion.

  • Coordinated equipment maintenance schedules to minimize downtime and enhance productivity.
  • Trained new linemen on safety protocols, tools usage, and best practices in line installation.
  • Managed project timelines and resource allocation for multiple electrical line installations simultaneously.
  • Collaborated with engineering teams to address technical issues and optimize installation processes.
  • Supervised crews in diverse weather conditions while maintaining a focus on safety, quality, and productivity.
  • Led emergency response efforts during power outages or storm damage restoration operations to quickly restore electricity access for affected communities.
  • Operated heavy machinery to complete construction tasks efficiently.
  • Inspected job sites for safety compliance and quality assurance.
  • Collaborated with team members to execute project plans effectively.
  • Assisted in training new technicians on equipment usage and safety protocols.
  • Implemented improved workflows to enhance project completion timelines.
  • Mentored junior staff, fostering skill development and teamwork.
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
  • Erected and removed temporary structures such as trench liners and scaffolding to meet team needs.

Construction Technician

GTE
06.1997 - 06.2002

Ran aerial and underground equipment for the placement of cable to expand and repair network

Backhoes, plow cat, vibratory plows, pole climbing, digger derricks, T40 stringer, Manhole/conduit systems, placement of aerial plant, underground cable and direct bury cable


Have current Class A CDL


Supervised daily operations of linemen teams to ensure safe and efficient project completion.

  • Coordinated equipment maintenance schedules to minimize downtime and enhance productivity.
  • Trained new linemen on safety protocols, tools usage, and best practices in line installation.
  • Managed project timelines and resource allocation for multiple electrical line installations simultaneously.
  • Collaborated with engineering teams to address technical issues and optimize installation processes.
  • Supervised crews in diverse weather conditions while maintaining a focus on safety, quality, and productivity.
  • Led emergency response efforts during power outages or storm damage restoration operations to quickly restore electricity access for affected communities.
  • Operated heavy machinery to complete construction tasks efficiently.
  • Inspected job sites for safety compliance and quality assurance.
  • Collaborated with team members to execute project plans effectively.
  • Assisted in training new technicians on equipment usage and safety protocols.
  • Implemented improved workflows to enhance project completion timelines.
  • Mentored junior staff, fostering skill development and teamwork.
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
  • Erected and removed temporary structures such as trench liners and scaffolding to meet team needs.

Education

High School Diploma

Coeur D Alene High School
Coeur D'Alene, ID
06.1992

Skills

  • Skilled in operating heavy equipment
  • Licensed Class A CDL driver
  • Aerial line installation
  • Underground line work
  • Underground line placement
  • Pole climbing and working aloft
  • Manhole set up and entry
  • Skilled in fiber optic and copper cable splicing
  • Manhole system construction
  • Road boring
  • 15 years of line work/splicing experience
  • Experienced central office lead installer
  • Installation and upkeep of fiber optic systems
  • DC power plant construction and upkeep
  • Ironwork and equipment rack installation
  • Knowledgeable in ethernet, sonet, TDM, HSI, CWDM, DWDM network installation, provisioning, grooming and cuts
  • 18 years of central office equipment installation experience

Timeline

Central Office Equipment Installer

Ziply Fiber
05.2007 - Current

Cable Technician

Verizon
04.2004 - 05.2007

Construction Technician

Verizon
05.2002 - 04.2004

Construction Technician

GTE
06.1997 - 06.2002

High School Diploma

Coeur D Alene High School
Christopher Howard