Motivated student with strong academic achievements, ready to take on new challenges and support electrical engineering team. Applies education and attention to detail to learn new skills swiftly and complete thorough, accurate work.
Sakhalin II Phase II Project Lunskoye Field Platform
- Creating and Calculating an Electrical Loadlist in Lunskoye Field Platform
1. DED (Detail Engineering Design) Suban-28 Wellsite Facilities - Medco E&P Grissik Project
- Determine the design of Grounding & Lightning Protection system for Suban-28 Wellsite Area
- Present a datasheet for Bulk Material , Grounding & Lightning Protection
2.DED (Detail Engineering Design) Suban-21 Wellsite Facilities - Medco E&P Grissik Project
- Determine the design of Grounding & Lightning Protection system for Suban-21 Wellsite Area
- Providing a list of Cables and Cable Glands that is used in Suban-21 Wellsite area alongside with their detail data such as length, type, size, route, etc to facilitating a troubleshooting or quantity estimation
- Launching a datasheet for Bulk Material , Grounding & Lightning Protection
- Assigning an electrical material take off for Suban-21 Wellsite Surface Facilities Projects with their detail datas are as follows : i.e, Lengths, Types, Sizes, Quantities, etc
3. FEED Bekapai Artificial Lift Phase 2 - Pertamina Hulu Mahakam
- Presenting the site survey finding during the field visit to Bekapai platfoms (MWPBP1, MWPBA, MWPBE, MWPBH, and MWPBG) for FEED Bekapai AL Phase #2 Project.
FPSO Marlin, Forel Project PT Medco E & P Natuna