Technical Assistance Services For Supporting Central Project Implementation Unit (CPIU) - Dam Operational Improvement And Safety Project (DOISP) Phase 2, 12/01/18 - 12/01/23, USD 10,204,432, Directorate General of Water Resources, Ministry of Public Works and Housing, International Bank for Reconstruction and Development and Asian Infrastructure Investment Bank Preparation of Seluna River Basin Flood Management Project, 05/01/19 - 02/01/22, USD 2,454,417, Directorate of River and Coastal, Ministry of Public Works and Housing, Asian Development Bank Cimanuk-Cisanggarung River Basin Flood Management Project, 11/01/19 - 02/01/22, USD 2,195,418, Directorate of River and Coastal, Ministry of Public Works and Housing, Asian Development Bank Development of Wadaslintang Irrigation System, 03/01/19 - 02/01/21, USD 3,036,229, Directorate of River and Coastal, Ministry of Public Works and Housing, Asian Development Bank CS01 Flood Risk Management in Selected River Basin, 01/01/18 - 06/01/23, USD 5,929,090, Directorate of River and Coastal, Ministry of Public Works and Housing, Asian Development Bank Work on Flood Study For Phase I in Suryacipta City of Industry, 02/01/17 - 05/01/17, USD 51,738, PT. Suryacipta Swadaya Consulting Services for the Upper Citarum Basin Flood Management Project, 11/01/15 - 06/01/21, USD 2,442,098, Balai Besar Wilayah Sungai Citarum, Ministry of Public Works, Japan International Cooperation Agency Consulting Services for the Preparation for Modernization of the Management of the Jatiluhur Irrigation System, 11/01/15 - 05/01/18, USD 3,522,485, Balai Besar Wilayah Sungai Citarum, Ministry of Public Works, World Bank Technical Assistance for Supervision of Rehabilitation and Improvement of Irrigation and Drainage Infrastructure in Jatiluhur Irrigation System, Water Resources and Irrigation Sector Management Project - 2 (WISMP-2), 05/01/14 - 12/01/17, USD 2,515,340, Balai Besar Wilayah Sungai Citarum, Ministry of Public Works, World Bank Project Implementation Support - Metropolitan Sanitation Management and Health Project (PIS-MSMHP), 11/01/11 - 06/01/16, USD 3,026,259, Directorate of Environmental Sanitation Development, Directorate General of Human Settlements, Ministry of Public Works, Asian Development Bank Jakarta Urgent Flood Mitigation Project (JUFMP) - Jakarta Emergency Dredging Initiative (JEDI), 10/01/09 - 02/01/11, USD 1,660,897, Directorate of River and Coastal, Directorate General of Water Resources, Ministry of Public Works, World Bank Feasibility Study of Batang Toru Hydro Electric Power Plant, 06/01/11 - 09/01/12, USD 1,846,258, PT. North Sumatera Hydro Energy