Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Donny Julion Ramos Sianipar

Bekasi,JB

Summary

Experienced Reservoir Engineer with more than 15 years of expertise in reservoir engineering. Proven ability in skills using Eclipse simulator, MBAL, and PROSPER. Successfully increase more than 500 BOPD of oil and 3 MMSCFD of gas and increasing oil and gas recovery of 50 MBO and 600 MMSCF respectively. Seeking a challenging role to optimize reservoir performance and increase production.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Senior Reservoir Engineer

PT. Tropik Energi Pandan
2014.10 - Current

1. Conducting surveillance in producing wells in Ario Damar-Sriwijaya Field

2. Preparing production allocation data in Ario Damar-Sriwijaya Field

3. Designing and executing Pressure & temperature survey in Ario Damar-Sriwijaya Field including preparing contract

4. Updating reservoir simulation for Ario Damar-Sriwijaya Field

5. Conducting acidizing stimulation in several wells in Ario Damar-Sriwijaya Field including preparing contract in collaboration with production engineer

6. Conducting Thru Tubing Perforation in several wells in Ario Damar-Sriwijaya Field including preparing contract

7. Proposing development wells in collaboration with Geologist by preparing reservoir justification and economic evaluation.

8. In collaboration with production engineer, improving gas well performance by applying foam stick


Achievement:

- Gain +/- 500 BOPD and 3 MMSCFD from acidizing stimulation

- Gain +/- 50 BOPD and 1.5 MMSCFD from Thru Tubing Perforation

- Gain additional recover more than 50 MBO and 600 MMSCF gas by proposing flare recovery gas compressor

Reservoir Engineer

PT. Medco E&P Indonesia
2006.07 - 2014.09

1. Supervising production performance of each well in Kaji-Semoga Field

2. Calculating waterflood voidage in Kaji SEmoga Field as a part of waterflood management in Kaji Semoga Field

3. Proposing numerous workovers (change layer, reperforating, acidizing) in many wells in Kaji Semoga Field to management

4. Preparing documents in order to get permission from government in doing workovers.

5. Designing various artificial lift (SRP, HPU, gas lift, and ESP)

6. Designing, coordinate, and execute welltesting in Kaji Semoga Field and Tala Taba Heavy Oil Field

7. Updating reservoir simulation for Jene Field

8. In charge in Tala Taba Heavy Oil Field Study

9. Preparing plan of development of Kalabau Field


Achievement:

- Gain more than 600 BOPD from proposed workover

- 2nd best paper in Medco paper contest. The paper entitled ”Crude Oil Injection to remove damage in clay reactive sand”

Education

Bachelor of Science - Petroleum Engineering

Institut Teknologi Bandung
Bandung, Indonesia
06.2006

Skills

  • Quality Control
  • Data Analytics
  • Data Analysis
  • Project Management

Certification

- Welltest analyses and Design

- Formation evaluation, Petrophysics property, and log Interpretations

- Thermal simulations modelling & simulation using STARS

- Equations of State & PVT Analyses

Timeline

Senior Reservoir Engineer

PT. Tropik Energi Pandan
2014.10 - Current

Reservoir Engineer

PT. Medco E&P Indonesia
2006.07 - 2014.09

Bachelor of Science - Petroleum Engineering

Institut Teknologi Bandung

- Welltest analyses and Design

- Formation evaluation, Petrophysics property, and log Interpretations

- Thermal simulations modelling & simulation using STARS

- Equations of State & PVT Analyses

Donny Julion Ramos Sianipar