Power Plant Engineer with expertise in operating and maintaining electrical equipment within the Power Plant Area at APRIL Group. Proven track record in conducting preventive maintenance on critical systems, including UPS and MV/LV switchgear. Successfully led the Power Boiler project, powering up a 350MW Turbine Generator through effective coordination and adherence to safety protocols, resulting in seamless testing, commissioning, and operation. Committed to enhancing operational efficiency and reliability of power generation systems.
Overview
4
4
years of professional experience
Work History
Power Plant Electrical Engineer
PT Riau Andalan Pulp and Paper
Riau
10.2021 - Current
Company Overview: APRIL Group
Troubleshot MV Switchgear, LV Switchgear, UPS, Variable Speed Drive, Capacitor Bank, Electric Motor, Electro Static Precipitator and Motorized Valve utilizing electrical testing equipment.
Managed cross-functional team coordination to identify and rectify potential disruptions in Power Plant processes.
Improved overall operational performance by focusing on continuous improvement.
Developed a timeline and job steps based maintenance plan.
Ensured accuracy in historical equipment data through consistent recording and organization.
APRIL Group.
Project - Power Boiler for 350 MW Turbine Generator (May 2023 - June 2024).
Install, test, and commission Transformer 33kV/690V & 33kV/400V, MV Switchgear 33kV & 6.6kV, LV Switchgear 690V & 400V, UPS 400V, Variable Speed Drive 6.6kV & 690V, Capacitor Bank 6.6kV & 690V, Electric Motor, Electrostatic Precipitator, and Motorized Valve.
Enhanced operational efficiency by implementing modifications during the commissioning phase.
Ensured up-to-date As-built Drawings by organizing and maintaining documentation.
Manage collaboration between teams for adherence to technical requirements.
Managed coordination for site needs between vendors, sub-contractors, and general contractors.
Oversaw shutdown job coordination among internal teams and external partners post-project completion.
Diploma Trainee
PT Riau Andalan Pulp and Paper
Riau
10.2021 - 03.2023
Company Overview: APRIL Group
Completed organized training aimed at developing skills in troubleshooting, leadership and management.
Gain hands-on experience through fieldwork and site visits, and deliver presentations during on-the-job training in the Power Plant area.
Engaged in problem-solving activities, analyzing engineering challenges, and proposing solutions under the guidance of experienced mentors.
Developed critical thinking and analytical skills through hands-on problem-solving exercises.
APRIL Group
Intern
PT. Riau Prima Energi
02.2021 - 05.2021
Company Overview: APRIL Group.
Knowing how the work process at PT. Riau Prima Energi, especially at the Power Plant area.
Assisting with company maintenance, troubleshooting, and upgrading relay protection for 33 kV switchgear.
Analyze data and make reports about the protection used in distribution transformers.