The milestone of my career during working in Oil and Gas Industry was commissioning and start-up four gas production and processing facilities i.e. CNOOC SES Gas Plant located at Pabelokan island, HCML BD Field (FPSO and 1 Wellhead Platform), HCML MDA-MBH Field (FPU and 2 Wellhead Platforms) and HCML MAC Field (MOPU and 1 Wellhead Platform)
I started my career in Maxus SES as Engineer in TSP (Technical Service Production) Group in 1990 handling chemical treatment, laboratory, sandblasting and coating, cathodic protection and corrosion monitoring then since 1999 joined with South Business Unit Dept. to handle Oil Remote and Processing Platforms.
After training at CNOOC Gas Plant Dong Fang Terminal, Hainan, China in 2005, I was assigned to prepare and start Phase I Offshore Gas Operation including Onshore Receiving Facility and deliver gas to Power Generation PLTGU Cilegon, West Java.
In the Phase II of gas operation after construction of Gas Plant in Pabelokan island completed, I was assigned to prepare operation readiness, commissioning and start-up of Pabelokan gas plant then continue with the daily operation and maintenance of Gas Plant until 2012.
I was promoted to Jakarta office as Senior Head of CBU (Central Business Unit) department in 2010 to handle offshore oil and gas operation then moved to HCML (Husky-CNOOC Madura Limited) in 2012.
My first position at HCML as Production Set-up & Planning Manager of BD field which is High Pressure/High Temperature wells and high H2S content, joined with PMT during FPSO construction at Keppel Shipyard Singapore, prepare operation readiness, commissioning and start up of BD field in 2017 then my position changed as Production BD Manager to handle BD operation until 2022.
In 2022 as Production MDA-MBH-MDK-MAC Manager to prepare operation readiness, commissioning and start-up of MDA-MBH Field then continue to handle operation of FPU and two wellhead platforms until now.
In 2023 as Production MDA-MBH-MDK-MAC Manager to prepare operation readiness, commissioning and start-up of MAC Field and continue to handle operation of MOPU and one wellhead platform until now.
Problem-solving
Client engagement
Decision-making
Time management
Analytical thinking
Strategic planning
- Trekking and Trail Run
- Table Tennis
- Cycling