Meinhardt Infrastructure and Environment Limited (MIEL)
07.2024 - Current
The project consists of two packages: an elevated walkway with travellators on Wai Yip Street connecting KTAA and KBAA, and an iconic pedestrian and cyclist bridge with travellators across Kwun Tong Typhoon Shelter, linking the Kwun Tong Promenade to the former runway at Kai Tak
Led the structural design team for scheme development of the proposed elevated walkway
Manage manpower to ensure seamless integration and execution
Coordinate with the Client and other different authorities to facilitate implementation of the project
Liase with other professions in resolving design discrepancies with the use of BIM in a 3D environment
Assistant Resident Engineer
Civil Engineering and Development Department, appointed by MIEL
06.2023 - 06.2024
The project involves constructing the proposed Boardwalk, which spans approximately 2 kilometers and connects Oil Street to Hoi Yu Street
Oversaw construction of pre-bored socketed H-piles
Managed contract administration, project coordination, safety, environmental management, and site supervision
Collaborated with engineers and contractors on integrating the targeted works programme
Handled Contractor’s Early Warning notifications and claims for Compensation Event
Graduate Engineer
Meinhardt Infrastructure and Environment Limited (MIEL)
01.2023 - 05.2023
The project is split into four packages, with Felix overseeing walkway cover design
Assessed various site constraints and carried out schematic design for the walkway covers
Prepared working papers related to the preliminary design and cost estimation for the project
01.2022 - 12.2022
The ATCL will be a dedicated road for autonomous passenger transport on the airport island's east coast
Carried out schematic structural design for the proposed marine viaduct
Prepared deliverables regarding buildability study and design
Graduate Engineer
Meinhardt Infrastructure and Environment Limited (MIEL)
07.2021 - 12.2021
The proposed Boardwalk, spanning approximately 2 kilometers and connecting Oil Street and Hoi Yu Street, has the objective of improving pedestrian and cyclist connectivity along the North Point waterfront
Conducted option analysis and developed the detailed design for the foundation of the proposed lift tower
Prepared comprehensive design drawings and calculation reports
The Hong Kong University of Science and Technology
BEng - Civil Engineering
The Hong Kong University of Science and Technology
Certification
NEC4: ECC Project Manager Accreditation
Awards
HKUST School of Engineering Excellent Student Scholarship, 05/24
Institution of Civil Engineers Hong Kong Association, Graduates and Students Division, Communications Competition 2022-2023, Best Speaker and 1st Runner up
Software
SAP 2000
MIDAS Civil
CAD and BIM
Microsoft
Timeline
Engineer II
Meinhardt Infrastructure and Environment Limited (MIEL)
07.2024 - Current
NEC4: ECC Project Manager Accreditation
06-2024
Assistant Resident Engineer
Civil Engineering and Development Department, appointed by MIEL
06.2023 - 06.2024
Graduate Engineer
Meinhardt Infrastructure and Environment Limited (MIEL)
01.2023 - 05.2023
01.2022 - 12.2022
Graduate Engineer
Meinhardt Infrastructure and Environment Limited (MIEL)
07.2021 - 12.2021
BEng - Civil Engineering
The Hong Kong University of Science and Technology