Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Software
Timeline
Generic
Ghema Swara Ananda

Ghema Swara Ananda

Metallurgical Engineer
Padang

Summary

Experienced in metal extraction and refining industries, with strong analytical thinking, communication, and problem-solving skills. Adaptive and a fast learner, able to work under pressure in any related field

Overview

6
6
years of professional experience
19
19
years of post-secondary education
2
2
Languages

Work History

Steelmaking Engineers

Krakatau Posco
03.2022 - Current

Established in 2010, Krakatau Posco is a joint venture company between PT Krakatau Steel (Persero) Tbk, Indonesia’s largest state-owned steel producer, and POSCO, a leading global steelmaker from South Korea. PTKP produces Steel Slab, Steel Plate and Hot Rolled Coil.

  • Planning & evaluating of operation productivity
  • Control & improve the quality of product
  • Evaluating production cost
  • Perform steel making technical improvement

Management Trainee

PT Indonesia Morowali Industrial Park
04.2021 - 03.2023

PT IMIP is the operator of an integrated nickel-based industrial park in Morowali Regency, Central Sulawesi, producing nickel, stainless steel, carbon steel, and most recently, raw materials for electric vehicle batteries.

  • Learn coke making process to support FeNi blast furnace operation
  • Support supervisory task by helping manage daily tasks, workflow, and team coordination.

Project Team Member

Grand Strategy for Mineral and Coal Commodities
09.2020 - 11.2020

The Grand Strategy for Mineral and Coal is a framework by Indonesia’s ESDM to optimize the management of the country’s mineral and coal resources

  • Contribute to data collection, analysis, and reporting on Indonesia’s industrial data, especially in the copper industry
  • Coordination and Strategic Support: participate in meetings and communicate progress, issues, or needs to project leaders

Metallurgical Intern

PT. Smelting Gresik
06.2019 - 08.2019

PT Smelting is Indonesia’s first copper smelter, processing concentrate into high-purity cathodes to support mineral downstreaming.

  • Learn 'Mitsubishi Technology' and refinery process in producing 300.000 tpy copper cathode
  • Performs technical experiments to increase the recovery rate of Se and Te from slimes autoclaves leach solution


Education

S.T - Metallurgical Engineering

Institut Teknologi Bandung
Bandung, West Java
04.2001 - 10.2020

Skills

  • Extraction metallurgy
  • Analytical & Quality
  • Operational & Safety Skills
  • Team Collaboration
  • Problem-Solving and Decision-Making
  • Communication
  • Continuous Improvement Mindset

Accomplishments

  • The first runner up (national) in Metallurgy & Materials Challenge 2019
  • Department head award: Improved ultra low-carbon steel production technology and set up monitoring system of daily/weekly alloy usage and minimized all alloy inventory
  • Innovation award: Maximizing Cost Saving by Advancing Low-Cost Alloy Input Standard at BOF station
  • Innovation award: Establish and Optimize Al pellet Input Guidelines at BOF station
  • Innovation award: Optimizing Ladle Furnace Operations for the Production of Low Sulphur Steelgrade through CaO-CaF2 Input Modification

Software

Microsoft excel

Microsoft power point

Microsoft word

Factsage

HSC Thermodynamic Calc

METSIM

Minitab

Timeline

Steelmaking Engineers

Krakatau Posco
03.2022 - Current

Management Trainee

PT Indonesia Morowali Industrial Park
04.2021 - 03.2023

Project Team Member

Grand Strategy for Mineral and Coal Commodities
09.2020 - 11.2020

Metallurgical Intern

PT. Smelting Gresik
06.2019 - 08.2019

S.T - Metallurgical Engineering

Institut Teknologi Bandung
04.2001 - 10.2020
Ghema Swara AnandaMetallurgical Engineer