Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Hobbies
Languages
Timeline
Helmi

Helmi

Banda Aceh,AC

Summary

A proven leader in project management for oil and gas activities. With a proactive mindset, I adeptly manage complex problems, ensuring projects exceed goals with innovative solutions. Brings more than 16 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs, and improvements. My expertise in FEED and EPCI significantly enhances operational efficiency and project success. I have worked on the entire project life cycle, from conceptual studies, FEED, detailed engineering design, design optimization, factory acceptance testing, site support engineering for construction, pre-commissioning, commissioning, and start-up for oil and gas surface facilities, the EPCI project, and existing brownfield projects.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Head of Project Management

Upstream Oil and Gas Management Agency (BPMA)
02.2022 - Current


  • Perform and evaluate the Block A Gas Development Field Project Expansion (ARAS Phase-2 and ARAS Phase-3) project.
  • Perform and evaluate Arun Rejuvenation Project, acid gas compression package, gas sweetening plant (AGRU), and 6 MW gas power plant.
  • Ensure and oversee project planning to achieve project goals within constraints such as time, cost, and agreed-upon quality standards.
  • Analyzes project economic valuation, revenue, margins, and ensures the achievement of the production targets for the PSC contractor.
  • Continuously monitor the progress of operating activities and program activities in terms of plan and budget status.
  • Conduct supervision and evaluation of planning activities for the completion of surface facility projects.
  • Manage and control plant operating (OPEX) costs as well as actively monitor plant availability and major equipment reliability to meet the key performance target.


Head of Operation and Production

Upstream Oil and Gas Management Agency (BPMA)
09.2020 - 01.2022
  • Reporting directly to the Deputy of Operation.
  • Managed the operation and production functions in the exploitation PSC and ensuring that production targets are met.
  • Monitored and evaluated oil and gas production realization, as well as conducting operation optimization and reducing operational expenses.
  • Formulated strategies for PSC for selected program in conjunction with the POD and WP&B. Managing of drilling and workover, well maintenance, and well abandonment
    site restoration (ASR) activities.
  • Managed and resolved the operating (OPEX) cost issue through operation optimization
  • Performed facility sharing agreement (FSA)

Operating Facility, Planning and Evaluation

Upstream Oil and Gas Management Agency (BPMA)
10.2018 - 08.2020


  • Performed in the development of the PHE-NSB conceptual project optimization (brown field).
  • Managed and resolved the operating (OPEX) cost issue through operation optimization.
  • Developed the Arun jumper line for the North Sumatra-Aceh gas operation.
  • Reviewed project cost and operating cost for all production sharing contract contractors.
  • Performed for the place into services (PIS), AFE close-out, pre-technical meeting, work program and budgeting (WP&B), and routine and non-routine costs.
  • Developed innovative approaches to manage business and operations needs and enhance performance in oil and gas production.
  • Evaluated a long-term production test (LPTP) for AS CPP PT Medco E&P Malaka.
  • Reviewed EPC-1 and EPC-2 project closing and project change orders for PT Medco E&P Malaka.

Mechanical Field Lead Engineer & CSU Engineer

PT Medco E&P Malaka
01.2017 - 09.2018

Project : Block A Gas Development Project

  • Performed during the project are implemented in compliance with company procedures.
  • Achieved installation for the varied mechanical equipment for the Block A gas development project (EPC-1, EPC-2, and EPC-4 Arun Brown Field).
  • Conducted a pre-start-up safety review (PSSR) activity by ensuring that the equipment is operable safely prior to plant start-up.
  • Conducted final closure/boxing up of the manhole, final checking of tray installation, 1st fill catalyst loading, drying out/boiling out of the boiler, lube oil flushing, 1st fill lube oil, and mechanical running tests for various equipment such as centrifugal pumps and package equipment, including all related auxiliaries.
  • Developed an in-vehicle video monitoring system (IVMS) for condensate and sulfur trucks to achieve the company's HSE index.
  • Conducted commissioning work packages, test plans, test reports, and plant start-up collaboration with the operation team.
  • Performed for mechanical construction, work repair, and contractor NCR reports.
  • Evaluated and reviewed the mechanical equipment installation procedure and field change sheet document.
  • Provided engineering support during the construction phase, and reviewed and approved the construction document made by the EPC contractor prior to field installation.

Mechanical Engineer

PT Medco E&P Malaka
04.2010 - 12.2016

Project : Block A Gas Development Project (US$300 million project capital).

  • Reviewed and approved all mechanical engineering documents delivered by the EPC contractor and vendor, such as P&ID, PFD, mechanical datasheets, material requisitions and technical bid evaluation reports, mechanical handling study reports, 3D models, and layouts.
  • Facilitated the development and monitoring of technical queries to obtain missing information, clarify work scope, and maintain preferred Company procedures, specifications, standards, practices, and operational requirements.
  • Completed response to technical queries and design change notices raised by the contractor on mechanical equipment design change issues.
  • Performed in the bid technical meeting, kick-off meeting, and pre-inspection meeting with the EPC contractor or vendor.
  • Performed all deliverables, such as the design basis, mechanical specification, data sheet (AGE, AGRU, sulfur granulation, pressure vessel, pig launchers and pig receivers, pumps, storage tanks, nitrogen generator package, EG
    package, DPCU, ACHE, etc.), related to mechanical to be submitted to contractors, which were used as proposals to participate in the tender of EPCI-1 AS Central Processing Plant (AS CPP) and EPCI-2 Flowline, Trunkline, and Pipeline (FTP).
  • Provided technical expertise during the conceptual and FEED verification processes for the design Alur Siwah Central Processing Plant Block A gas development project.
  • Managed mechanical engineering project requirements.
  • Performed progress reports.

Mechanical Engineer

PT Medco E&P Indonesia
08.2008 - 03.2010

Project : Temelat gas project, Jene water injection, Jene fire water system, Fariz phase-2 and EOR full scale project (conceptual).

  • Developed conceptual design for EOR full phase project
  • Performed TBE, technical clarification, and review of the contractors' bidding proposal document
  • Coordinate and review inputs from the various Engineering disciplines, functional departments, and sub-contractors contributing to the Engineering portion of a project
  • Developed engineering solutions for technical problems, enhancing overall system performance and reliability.
  • Established relationships with suppliers and vendors to ensure timely delivery of materials and equipment.
  • Conducted project commissioning and strat-up.


Associate Engineer (Graduate Engineer Trainee)

PT Medco E&P Indonesia
08.2007 - 07.2008
  • Performed comprehensive training program that includes basic theory training for petroleum, geologists, drilling and workover well services, surface facilities, health, safety and the environment (HSE)
  • Conducted feasibility and conseptual studies for Tualang phase-1 and phase-2 project, analyzing data to inform decision-making processes regarding project viability.
  • Collaborated with operation and discipline engineers to optimize design performance.

Field Engineer

UN Habitat
03.2006 - 04.2007

Project : Aceh-Nias Support Settlement Project

  • Provided the required services, ensuring smooth implementation of the engineering works within ongoing and developing infrastructure activities in Aceh and Nias
  • Performed technical assistance needed for the design, repair, and construction of houses and public infrastructure in Aceh and Nias for victims of the tsunami disaster.
  • Conducted thorough site assessments to identify potential beneficiaries.


Education

Master of Management - Management

University of Syiah Kuala, Banda Aceh, Indonesia
08.2023

No Degree - Engineer Profession Program (PPI)

Bandung Institute of Technology (ITB), Bandung, Indonesia
06.2021

Bachelor of Science - Mechanical Engineering

University of Syiah Kuala, Banda Aceh, Indonesia
08.2006

Skills

  • Proactive mindset
  • Project Management
  • Complex problem solver
  • Project planning and development
  • Mechanical engineering
  • FEED and EPCI

Accomplishments

  • Encourage the success of Arun Rejuvenation Project, the installation of the Acid Gas Compressor Package, the Gas Processing Plant (Amine Sweetening Technology), and the 6 MW Gas Engine Generator Package.
  • Encourage the success of the Block A Gas Development Field Project Expansion (ARAS Phase-2 and ARAS Phase-3) project.
  • Achieved installation for the varied mechanical equipment for the Block A gas development project (EPC-1, EPC-2, and EPC-4 Arun Brown Field).
  • Designed an in-vehicle video monitoring system (IVMS) for condensate and sulfur trucks to achieve the company's HSE index.
  • Successfully conducted commissioning work packages, test plans, test reports, and plant start-up collaboration with the operation team.
  • Achieved review and approval of all mechanical engineering documents delivered by the EPC contractor and vendor, such as P&ID, PFD, mechanical datasheets, material requisition and technical bid evaluation reports, mechanical handling study reports, 3D models, and layouts for Block A Gas Project.
  • Completed response to technical queries and design change notices raised by the contractor on mechanical equipment design change issues.
  • Achieved all engineering activities, such as the design basis, mechanical specification, data sheet (AGE, AGRU, sulfur granulation, pressure vessel, pig launchers and pig receivers, pumps, storage tanks, nitrogen generator package, EG package, DPCU, ACHE, etc.), related to mechanical to be submitted to contractors, which were used as proposals to participate in the tender of EPCI-1 AS Central Processing Plant (AS CPP) and EPCI-2 Flowline, Trunkline, and Pipeline (FTP).
  • Supervised team of 30 staff members.
  • Completed the Temelat gas project, Jene water injection project, Jene fire water system project, and Fariz phase 2 project on time and on budget.
  • Successfully deliver the conceptual design for the EOR full-scale project.

Certification

  • Prince2 Foundation
  • Tropical BOSIET with EBS &Travel safely by Boat-Code 5906
  • Senior Professional Engineer (PII)

Hobbies

Swimming, reading, and Cycling.

Languages

Indonesian
Native language
English
Advanced
C1

Timeline

Head of Project Management - Upstream Oil and Gas Management Agency (BPMA)
02.2022 - Current
Head of Operation and Production - Upstream Oil and Gas Management Agency (BPMA)
09.2020 - 01.2022
Operating Facility, Planning and Evaluation - Upstream Oil and Gas Management Agency (BPMA)
10.2018 - 08.2020
Mechanical Field Lead Engineer & CSU Engineer - PT Medco E&P Malaka
01.2017 - 09.2018
Mechanical Engineer - PT Medco E&P Malaka
04.2010 - 12.2016
Mechanical Engineer - PT Medco E&P Indonesia
08.2008 - 03.2010
Associate Engineer (Graduate Engineer Trainee) - PT Medco E&P Indonesia
08.2007 - 07.2008
Field Engineer - UN Habitat
03.2006 - 04.2007
University of Syiah Kuala - Master of Management, Management
Bandung Institute of Technology (ITB) - No Degree, Engineer Profession Program (PPI)
University of Syiah Kuala - Bachelor of Science, Mechanical Engineering
  • Prince2 Foundation
  • Tropical BOSIET with EBS &Travel safely by Boat-Code 5906
  • Senior Professional Engineer (PII)
Helmi