Summary
Overview
Work History
Education
Skills
Certification
Timeline
QUALIFICATION
Generic
Henky Ardiansyah

Henky Ardiansyah

Fabrication Engineer Specialist
Ciparay

Summary

With more than 16 years experiences working mainly on specialist construction engineer (piping) onshore/offshore projects for major oil & gas.

Client relations professional with proven ability to manage client accounts and ensure satisfaction. Known for strong focus on team collaboration and achieving results. Reliable and adaptable, with excellent communication and problem-solving skills.

Overview

18
18
years of professional experience
5
5
Certifications

Work History

Client Rep. Construction Supervisor

PT. EJJV Engineering Indonesia
01.2025 - 12.2025
  • As Client representative for technical advisory, monitor and checking all materials on order comply with specifications.
  • Ensure execution of quality control activities on purchased goods and availability of relevant necessary documentation, in accordance with purchase order requirements/conditions and project procedures /contract, optimizing and minimizing costs.
  • Ensure timely update of Company Information Tools/Systems (either directly or by Inspectors) with the most reliable and up to date information on quality control and inspection activities (i.e. Inspection Report, Inspection Release Note).
  • Coordinate efficiently and efficaciously internal Inspectors and/or Inspection Agencies in order to reach project goals by means of cost effective and result oriented solutions according to Company network synergies, best practices and procedures.
  • Conduct and approving for assessment offshore MOB DEMOB.
  • As Area Authority to manage and approve document such as: PTW, JHA and another permit related.
  • Supporting Operation & Commissioning team for Start Up activities.
  • Project Involvement:
  • OPL LES Reactivation Project - Jakarta, Indonesia

Piping Field Engineer (Site Supervisor)

PT. SMOE Indonesia
10.2023 - 09.2024
  • Manage and prepare testing document and ensure (directly or through Internal Inspection) efficient workflow to vendor quality control documents review (ITP and Test Procedure).
  • Check all inspection report received from on-site construction worker (Internal and External) and ensure the correct distribution.
  • Maintain good strong interface with construction supervision and have regular site visits to ensure construction activities and the smooth transition to completion is maintained.
  • Comply with project schedule requirements.
  • Ensure all paperwork is complete, accurate and submitted on time to support compliance, quality and project milestones.
  • Project Involvement:
  • BMY Pluto Train 2 Project 50 modules - Woodside, Australia

Sr. Construction Engineer

Pertamina Hulu Kalimantan Timur (PHKT)
10.2022 - 09.2023
  • Review project requirements, design specifications and technical documents to ensure compliance with industry standards, regulations and project expectations.
  • Collaborate with the project team, including contractors, subcontractors and other stakeholders to develop and implement effective construction strategies and plans.
  • Conduct regular site visits and inspection to assess progress, identify potential issues, and provide timely solutions.
  • Manage and resolve any construction related conflicts or disputes in a proactive and efficient manner.
  • Monitoring construction budgets resource allocation and overall project costs to ensure optimal utilization and cost efficiency.
  • Coordinate efficiently and efficaciously internal in order to reach project goals by means of cost effective and best practices and procedures
  • Manage MOM Construction Weekly Meeting with Contractor at-site (daily progress of mechanical piping, structure, civil, etc.)
  • Project Involvement:
  • Bunyu wellhead drilling campaign onshore project - PHKT Zona 10
  • Tarakan wellhead drilling campaign onshore project - PHKT Zona 10

Piping Field Engineer

PT. McDermott Indonesia
08.2018 - 06.2022
  • Manage fabrication/ installation as per the Company procedures and processes. As a minimum, the procedure(s) will outline the following:
  • Methods, techniques, and practices to be used to perform work
  • The sequences to be used to perform work
  • Installation aids, temporary works, and consumables required to perform the work
  • Monitor the progress of the mechanical piping work and site conditions and advise the lead construction of any development that may result in changes to the project and schedule and/or execution sequence.
  • Participate in the resolution of any technical problems arising during assembly or installation and assist in the formulation of corrective action requirements.
  • Coordinate with Vendors, Quality, HSES, Surveyor and Subcontractors as per scope execution requirements to ensure that necessary equipment and personnel are available and ready to be deployed for the project.
  • Witness/inspect pre-rigging, and acknowledge the receipt of temporary structures, line pipes, and other materials to be installed.
  • Project Involvement:
  • WHRP TYRA REDEVELOMENT PROJECT – TOTAL (August 2018 to February 2020)
  • SHWE SUBSEA PROJECT – POSCO (February 2020 to June 2021)
  • NFPS PROJECT – GATAR GAS (June 2021 to June 2022)

Field Engineer Fabrication

PT. SAIPEM KARIMUN INDONESIA BRANCH
04.2016 - 07.2017
  • Coordinates with Piping fabrication shops to monitor and report the daily/weekly progress, ensuring that the necessary resources are in place by Contractor to complete the spools & pipe supports fabrication installation, pressure testing etc. in a safe and timely manner meeting priorities to suit the schedule requirement.
  • Monitor the progress of the work and site conditions and advise the Operations Engineer of any development that may result in changes to the project and schedule and/or execution sequence.
  • Actively participate in project Constructability sessions, Readiness reviews, Hazard Identification studies or Job Safety Analysis as applicable and communicate to implement the recommendations.
  • Project Involvement:
  • NORTH & SOUTH FPSO TOTAL E&P ANGOLA BLOCK 32.

Valve Engineer

PT. CAMERON SERVICES INTERNATIONAL
01.2014 - 03.2016
  • Manage the warranty & non warranty inspection such as (responsible for testing valve, spare parts replacement, site inspection report).
  • Project Involvement:
  • Valve Engineer, working on ConocoPhillips Indonesia working on Valve Integrity Management System and Valve Bill of Material Identification Project
  • Having experience as Valve and Flange Management Engineer working on Chevron Chuan Dong Bei (CDB) Gas Plant Project at Nanba – China (2013 – 2015)
  • Project Service Engineer, focused on valve warranty and non-warranty of valve for Cameron Korea (2015)
  • Project Service Engineer, field services on valve warranty non warranty for MSP Project – Chevron, Angola (2015).

Piping Field Engineer

PT. McDermott Indonesia
10.2008 - 09.2013
  • Actively participate in project Constructability sessions, Readiness reviews, Hazard Identification studies or Job Safety Analysis as applicable and communicate to implement the recommendations.
  • Reviewed of all interface related contractor produced engineering documents and related any differences or site approved changes to the Project Manager and corresponding work packages team leaders.
  • Participate in the resolution of any technical problems arising during assembly temporary structure installation.
  • Prepare Daily Post Job Completion Reports as per Company Procedures.
  • Project involvement:
  • FPSO Maersk Peregrine Project (October 2008 – February 2010)
  • Platon Gas II Chevron Project (March 2010 – April 2011)
  • Gorgon Project Barrow Island LNG Plant–Chevron (Mei 2011 – September 2013)

Piping Designer

PT. Yasa Industri Nusantara
11.2007 - 03.2008
  • Responsible for review and approve all relevant drawing and specification.
  • Responsible for checking and back checking design and control 3Dmodelingwork.
  • Assist engineers with initial design and final design solution on project.
  • Ensure compliance with approved design standards, to provide quality design.
  • Communicate and interface with other engineering disciplines.
  • Project Involvement:
  • LNG Tangguh Train 1 & 2 at Papua BP Project (November 2007 – March 2008)

Education

Bachelor Degree of Technology Engineering -

University of Pasundan

Skills

Microsoft Office Software (MS Outlook, MS Excel, MS Office, MS Teams)

Operated AUTO CAD, Navisworks, 3D Model

PIMS (Project Information Management System for Daily Bases)

Smart Completion (Project Completion Management System for Daily Bases)

Familiar with international Code & Standard (API, AWS, ASME, NORSOK, ISO)

Achievement focused

Proficient in CRM tools

Mental health support

Cross-functional teamwork

Certification

NDT LEVEL II (LPT & MPT) organized by Indonesian Welding Society (IWS)- Batam & NDE Consultancy Service Sdn.Bhd – Malaysia (Certified at Batam, 2007-02-12).

Timeline

Client Rep. Construction Supervisor

PT. EJJV Engineering Indonesia
01.2025 - 12.2025

Piping Field Engineer (Site Supervisor)

PT. SMOE Indonesia
10.2023 - 09.2024

Sr. Construction Engineer

Pertamina Hulu Kalimantan Timur (PHKT)
10.2022 - 09.2023

Piping Field Engineer

PT. McDermott Indonesia
08.2018 - 06.2022

Field Engineer Fabrication

PT. SAIPEM KARIMUN INDONESIA BRANCH
04.2016 - 07.2017

Valve Engineer

PT. CAMERON SERVICES INTERNATIONAL
01.2014 - 03.2016

Piping Field Engineer

PT. McDermott Indonesia
10.2008 - 09.2013

Piping Designer

PT. Yasa Industri Nusantara
11.2007 - 03.2008

Bachelor Degree of Technology Engineering -

University of Pasundan

QUALIFICATION

  • Manage construction oversight, and execution support for all piping-related activities associated with offshore facilities, topsides, pipelines, and brownfield/greenfield modifications.
  • Prepare and review piping construction work packs, method statements, and job cards.
  • Conduct constructability reviews and ensure design deliverables are construction-ready.
  • Interpret piping isometrics, P&IDs, GA drawings, support details, and vendor documents.
  • Provide technical solutions to site queries (SQs), technical queries (TQs), and interface issues.
  • Supervise piping construction activities at onshore yards and during offshore mobilization.
  • Liaise with engineering, procurement, fabrication yards, EPC contractors, and client representatives.
  • Maintain accurate records of construction progress, deviations, and change requests.
  • Prepare daily/weekly progress reports and mechanical completion dossiers
  • Familiar with CMS (Completion Management System) in order to integrated construction planning and Turnover tool set up to allow Turnover completion status to be received and sent from fabrication yards to the main Project server located at site and Home Office across the Project internet system.