Summary
Overview
Work History
Education
Skills
Timeline
Husni Kurniawan

Husni Kurniawan

Deputy Project Manager & General Superintendent Construction
Kota Palembang

Summary

Flexible Deputy Project Manager and General Superintendent with commitment to safety and compliance by staff and subcontractors to job protocols. Energetic professional with more than15 years of expertise providing job site inspections and holding weekly safety meetings. Knowledgeable construction professional known for developing effective schedules, creating plans to see projects through to completion and assessing work to comply with applicable codes. Multitasking Project Superintendent works productively with various personalities and meets very tight deadlines.

Overview

19
19
years of professional experience
7
7
years of post-secondary education

Work History

Deputy Project Manager

PT. Supra Surya Indonesia
Tanjung, South Kalimantan
02.2023 - Current
  • Project is dismantled conveyor with a length of around 1035 meters and all structural include belt, machinery and electrical/instrument devices will be reused.
  • Prepare project submission documents including evaluation research reports from the client to ensure the scope of work.
  • Presenting progress to user weekly and monthly meeting.
  • Calculate manpower and experts needed and determine the time and cost to be achieved based on researcher's report from client.
  • Assistant to project manager to improve document handover project.
  • Calculate equipment needed (crane, flatbed, lowboy, manlift) and hour's equipment needs at each area (head, along conveyor, tail, and Lay down).
  • Risk analysis of all scope, especially about weather, equipment down, and materials delivery.
  • Coordinate on-site with SHE representative area owner about safety mandatory training for all crews before working.
  • Monitoring all progress and reporting to client and scheduler about on-progress work.
  • Supported senior managers and department leaders by completing projects and problem resolution under tight budgets and schedule demands.

Construction General Superintendent

PT. Freeport Indonesia, Central Services Division (EPC)
Tembaga pura, Timika
05.2021 - 01.2023
  • Handled scheduling of subcontractors and staff to complete projects within required timeframes.
  • Conducted walk-throughs with clients prior to project close, completing punchlists and answering all questions.
  • Coordinated planning, scheduling and successful execution of multiple large-scale construction projects.
  • Oversaw selection, procurement and allocation of building materials and equipment.
  • Coordinated power equipment use and maintenance to create safe working environment, limit accidents and prevent damages.
  • Coordinated on-site construction shutdowns, testing and inspections, reporting details and concerns to designated team supervisors.
  • Worked with inspectors, workers and unions, to conduct weekly status updates.
  • Continuously inspected job sites for observation of safety protocols by staff and subcontractors.
  • Developed and maintained relationships with contractors, sub-contractors and stakeholders to support successful project completion.
  • Participated in project budget and cost control measures, tracking progress and making necessary financial adjustments to meet company goals.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.
  • Prepared detailed project estimates and reports for management review.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Led 245 manpower's from 5 sections (Millwright, Electrical/Instrument, Piping&Welding, Rigging&Structural, Civil)

Construction Superintendent Electrical/Instrument Technician

PT. Freeport Indonesia, Central services Division (EPC)
Tembagapura, Timika
05.2018 - 04.2021
  • Lead 45 manpower's construction electrical/instrument technicians
  • Liaised with engineering staff on special projects to assist with configuration, installation and interoperation of system equipment.
  • Studied and interpreted equipment manuals, circuit diagrams, blueprints and schematics to determine corrective actions for repairs, calibrations and installations.
  • Used information in technical diagrams, schematics, and manuals to understand operations and make successful repairs.
  • Modified, maintained, or repaired electronics equipment or systems to achieve proper functioning.
  • Performed repair procedures on damaged instruments and sourced replacements from approved vendors.
  • Performed scheduled and planned installation and maintenance duties.
  • Evaluated finished assemblies for compliance with standard procedures and design requirements.
  • Worked to create safe, low-cost and dependable designs.
  • Prepared yearly and technical budgets for electricity and instruments projects.
  • Estimated numerical length of runs during new service installations.
  • Implemented operational timelines for service shut-offs to be observed.
  • Keep performance factor 1.0 - 1.1

Construction General Foreman Instrument

PT. Freeport Indonesia, Central Services Division (EPC)
Tembagapura, Timika
06.2012 - 04.2018
  • Lead 17 construction instruments technicians
  • Organized and detail-oriented with strong work ethic.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Developed strong organizational and communication skills through coursework and volunteer activities.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.
  • Exercised leadership capabilities by successfully motivating and inspiring others.
  • Demonstrated strong organizational and time management skills while managing multiple projects.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.\
  • Keep factor performance 1.1

Construction Foreman Electrical

PT. Freeport Indonesia Central Services Division (EPC)
Tembagapura, Timika
10.2009 - 05.2012
  • Led Crew#1 12 construction electrician
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Cultivated interpersonal skills by building positive relationships with others.
  • Resolved problems, improved operations and provided exceptional service.
  • Worked effectively in fast-paced environments.
  • Make, review and socialization Job safety Analysis before start working
  • Execute and supervise monthly target Key Performance Indicators (KPI's)

Construction Electrician

PT. Freeport Indonesia, Central Services Division (EPC)
Tembagapura, Timika
05.2006 - 09.2009
  • Installed and maintained wiring, control and lighting systems.
  • Prepared and assembled conduits and connected wiring.
  • Read blueprints and technical diagrams.
  • Repaired and replaced wiring, fixtures and equipment using hand and power tools.
  • Spliced and termination 600v-13,8kv using 3M kits
  • Installed ground leads and connected power cables to equipment.
  • Installed safety and distribution components for electrical systems, such as switches, resistors and circuit-breaker panels.
  • Tested electrical systems functionality and continuity of circuits using devices such as ohmmeters, voltmeters and oscilloscopes.
  • Replaced and repaired lighting fixtures and electrical control and distribution equipment.
  • Demonstrated expertise in use cable reels, stripping tools, voltage detector and wire cable to complete fast-paced work.

Electrician

PT. Inamco Varia Jasa
Timika, Papua
10.2003 - 04.2006
  • Present in predetermined shift.
  • Arrive 5.30 AM and attend safety meeting of supervisor.
  • Following supervisor's instructions regarding section scope of work and tasks that must be done safely.
  • Moving work that has been in lineup supervisor (installation of cable trays, cable withdrawals, tidying cables, painting supports and marking on cables and panels).
  • Clean work area after and before work.
  • Report any work issues including occupational safety and health.
  • Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.

Education

Bachelor of Engineering - Electrical Engineering

Universitas Muhammadiyah Palembang, Palembang, South Sumatra, Indonesia
02.1995 - 11.2001

Skills

Bahasa Indonesia: Native Proficiencyundefined

Timeline

Deputy Project Manager - PT. Supra Surya Indonesia
02.2023 - Current
Construction General Superintendent - PT. Freeport Indonesia, Central Services Division (EPC)
05.2021 - 01.2023
Construction Superintendent Electrical/Instrument Technician - PT. Freeport Indonesia, Central services Division (EPC)
05.2018 - 04.2021
Construction General Foreman Instrument - PT. Freeport Indonesia, Central Services Division (EPC)
06.2012 - 04.2018
Construction Foreman Electrical - PT. Freeport Indonesia Central Services Division (EPC)
10.2009 - 05.2012
Construction Electrician - PT. Freeport Indonesia, Central Services Division (EPC)
05.2006 - 09.2009
Electrician - PT. Inamco Varia Jasa
10.2003 - 04.2006
Universitas Muhammadiyah Palembang - Bachelor of Engineering, Electrical Engineering
02.1995 - 11.2001
Husni KurniawanDeputy Project Manager & General Superintendent Construction