Head of Power Plant; Managing Power Plant with capacity 1050 MW
Area Responsibility; Water Treatment Plant, Power Boiler and Turbine
1. Operator Boiler License Pekanbaru 2012. Kementrian Tenaga Kerja
2. License K3 Energi Listrik, Pekanbaru 2015, Kementrian Tenaga Kerja
3. License of Environmental Control, Pekanbaru 2019, Kementrian KLHK
4. Management Development Program, Medan 2010, Management Development International (MDI, Berastagi, North Sumatera, July 2010
5. Lean for Manager, Pelalawan 2019, April Learning Institute
6. APRIL Future Leader Program (FLP) 19, Singapore 2021, Nanyang Technological University
Lead more than 14 Kaizen Project, 8 area 6S, 2 TPM area, Visual Management Board (VMB) and Genba with Achievement Golden Kaizen:
1. Recycle backwash of Sand Filter Bed as raw water to Clarifers, 2014
2. Reduce MP and LP steam internal consumption, 2015
3. Reduce Cooper content in Feedwater Boiler from 3 to 0.75 ppb, 2017
4. Improve pass rate process water quality from 53 to 85 %, 2018
5. Long sustain Kaizen Reduce Cooper content in Feedwater Boiler from 3 to 0.75 ppb, 2017
6. Reduce potable water consumption to townsite from 15.300 to 8.700 m3/day, 2019
7. Increase firing of brown fiber (biomass) from 150 to 600 TPD, 2020
8. Support APRIL 2030, zero sludge to Land Fill, 2021
9. Reduce Oil consumption by 10 % from 2022 budget, 2023
10. Area with Zero LTI more than 1000 days, 2024
Special Project
1. Utilize Hot Water excess of pulp mill as preheater of demin water to feed water boiler, 2018
2. Double Polish of Condensate Pulp Dryer to reduce cooper content from 15 to 3 ppb, 2019
3. Brown and Sludge feeding system to Power Boiler 3 to support Vision APRIL 2030, 2020
4. Install Sand Screen in PB1 and 2 to recycle bottom ash as sand feeding CFB and Bubbling Boiler, 2021
5. Install screw press to reduce moisture content and sodium in Brown Fiber, 2021
6. Install MPPRV from sootblower steam to ejector Turbine 5 and 7 to improve vacuum of Turbine, 2022
7. Upgrade 3 units Air dryer turbine to reduce dew point of instrument air, 2023
8. Install Gas Turbine 7.5 MW as emergency equipment, 2023
Commissioning
1. Member of Commissioning Soft Water 3 x 75 lps, 2016
2. Lead Commissioning Condensate Polishing Unit 3 x 100 lps, 2018
3. Lead Project and Commissioning Soft Water 3 x 100 lps, 2019
4. Advisor of Commissioning new water treatment plant, process water: 3000 lps, demin water 3 x 75 lps, 2022
5. Member of Commissioning steam turbine 130 MW, 2023
6. Member of Commissioning steam turbine 340 MW, 2024
Internal Audit
1. Review demin water and condensate protection in Recovery Boiler Brasell, Brazil
2021
2. Audit efficiency of Power Plant and Water Quality, APICAL 2024