Over 15 years plus of experience, been working on the oil & gas industry – Fabrication & Construction works for onshore (LNG-Natural gas process plant)/ offshore plant facility (FPSO - FSO, Offshore Wellhead platform/ CPP Platform/ Compression Platform, E-House/Substation)Overall mostly related with scope of Instrument - Electrical & Telecom works
Project Construction Supervision & Coordination & Interfacing ( in between Client / Sub-contractor / inter discipline works ) during on stage of Fabrication/ Construction @ fab yard as well in-situ onshore plant fabrication installation works
Quality Inspection/ witness on the following ;
- Receiving, storage, preservation arrangement of ( the bulk material, equipment/ field end devices ) as well Monitoring up to packing process start with final cleaning /preservation with silica Gel/ plastic cover with sealed vacum/ packing onto pallet wooden box ready for shipment
- As well to monitor/ witness for the requirement of calibration @ manufacture/ on-site function test of the EI&T equipment end devices,
- To review/ verify compliance check with project specification/ data sheet - manufacture test result/ design drawing related as detail installation - hook up - isometric, P&ID drawing
- Short visit and/or Residential visit to manufacture plant for supervision /monitoring on assembly process-progress as well for witnessing the FAT test of individual equipment or skid integrated modular unit (SWGR-MCC, Transformer power distribution, chemical injection, instrument air compressor, F&G system with Control panel combining vesda & FM200 fire supression, custody metering skid with all integrated instrument & water proover calibrator unit, Hvac system skid unit, Power generator package unit and etc
Leading / Coordinating an Engineering I&E team work ( combining Field production Engineer and Engineering detail design ) on the technical review/ preparation-progressing of the deliverable item & Verification/ Clarification during Construct ability – design modelling review ( in related documents/ drawings/ MTO/ installation execution ) with supporting of the Engineering software Navis/ PDMS - SPR/ Smart Plan Review
Leading / Coordinating and assist to manage the scope responsibility for Construction Team – PreComm Team - QC Inspection Team on segregation scope works responsibility – works execution in related priority for the works readiness for inspection of the MC/ Mechanical System Completion by system – sub system ITR A & Pre-Comm with check sheet/ Overcome ITR B and further stage up to RFC/ Ready for Commissioning with schedule prioritize to be completed and to be aligned with all construction activity provided by a skyline chart schedule The using of MC system software ( ICAP with associated overcome ITR, WinPCS/ PIMS / CCMS with associated Check sheet ITR ) which will be recorded / to be reported by the the MC system including all Punch List associated items ( as part of the ITR check sheet – ITR Overcome ) that will be closed/ or to be transfered as COW/ Carry Over Works item onto a work pack / job carding system as required
Estimator for bidding & construction execution ( with regard Man hours & material requirement for project Tendering, Job Carding-work pack )