EIT Construction Specialist, Construction Engineer, Quality Inspector, Mechanical system completion - PreComm & Commissioning
Makassar,So Sulawesi
Overview
25
25
years of professional experience
16
16
Certifications
8
8
years of post-secondary education
Work History
Client Rep - E&I Supv Acting E&I Supt/ Construction Manager
ABB
10.2024 - Current
Company Overview: Woodfibre LNG Canada project
Fabricated Constructed as in modular, and the Integration with related Electrical Instrument installation with Canadian WLNG CSA standard reference for all Equipments cabling as the following ;
- Combined Steel Structural - Corrugated wall/ Roof and Indoor Architectural with Full wall insulated wall liner, steel deck floor, All base frame stand alone E&I panel as well wall mounted steel frame of E&I panels steel structure
- Hvac system with humidity - pressurized control, Insulated Earthed-Bonded per section join of the Supply / Return air ducting which is equipped with damper-heater
- Cable Ladder/ Tray - EMT/ Alum Conduit with all accessories fitting connector for installation with unistrat support system
- F&G BFGS system with indoor outdoor detection device unit (E.g. Notifier unit - Break Glass switches - Manual Call point Beacon sounder & strobe light, Door sensor, Heat-Smoke-Gas sensor combined with Vesda HSSD with PVC Conduit installation for continuation pick-up sampling line plus the Novec Gas Fire suppression system with Galv steel pipe distribution line
- UPS system with Rectify/ Distribution panel, Grouping cell of battery bank back up
- MV/ LV SWGR / MCC Panel/ Power & Lighting indoor/outdoor installation with power outlet-switches & photo cell sensor, Telecomm/ LAN cabling & outlet-switches, telecom installation with PAGA system installation, Radio Communication as well for overall system control communication inter panel linking by Cat 6 / FO interface cabling
- PE Grounding system with installation of indoor loop copper bar - circular loop along side of wall liner as well the IE grounding system with segregate/ stand alone copper bar plus the lightning protection system installation by using of conventional air terminal combining with circular loop of copper tape comining with earthing down bare copper wire conductor
- The overall E&I cabling and Vareiy Gland using for Armor/ No Armor cable installation manufacture ref to WLNG CSA/ Canadian Standard for cable type RW90 for indoor non hazardous plus the Teck 90 cables use for Outdoor hazardous area. Variety cable gland are use with combining of barrier gland @ Ex d devices - outdoor hazardous area & non barrier gland @ outdoor hazardous area - Ex e devices, plus the Non armor gland use @ indoor safe area. The F&G cable installed by using of tray for indoor NON Shield cable and the using of protected EMT conduit system for indoor safe area installation while the using of Rigid Aluminum conduit are for the outdoor hazardous area installation are to be combined flexible Heavy duty liquitight conduit FT1 & FT 4 with related all combination fitting type connector requirement ( Eg. compression type connector, union, reducer adapter, ,nipple, conduit sealing fitting with chiko fiber & cement putty @ Wasco fabrication yard in Batam - Indonesia
Auditor/ SR QC Inspector
OES Asset Integrity LLC Abudhabi
10.2022 - Current
Visiting offshore Drilling Rig unit for Auditing/ Inspection all aspect item system related Electrical Instrument Telecom which is supporting / working with other process mechanical system on the Drilling Jack Up Rig, check verify all related data sheet/ regular inspection check sheet record to be done/ PMO Register/ Compliance Cert for all item equipment use in Hazardous location and check the list of Ex Register/ check compliance cert/ approved licence for system operation of Navigation system and all radio communication system GMDSS, check verify how the unit operation as per data sheet and how is the normal continue operation, check verify for any abnormal operation of the main item unit ( Eg. Power Generation system c/w Generator Control panel / auto change over with combine supply Normal & emergency power plus UPS system with battery battery backup, SWGR Unit with sychronising system with alternate connection of BUS switching, do testing of the marine navigation system plus the helicopter aviation landing signalling system, do testing of FIre & Gas system protection by zone / by type of sensor ( Flame det/ Gas det/Smoke det ), Visual-Close & Detail inspection by percentage on quantify overall item for all type “Ex” device item, randomly on visual/ closed inspect of non Ex.
Client Rep as EIT Quality Inspection/ Works Supervision-Coordination/ Vendor visit for Equipment FAT witness/Inspection-Review & Signed for MC/Mechanical Completion ITR with PunchList
Medco Energy FPSO Marlin Natuna
06.2023 - 09.2024
Vessel Marine Conversion scope of work which to be done with ref to CLASS Certification ( combining NK Class & BKI ) and in related the Overall structural of vessel replating & piping spool removal-replacement with RL&E Re-use/ Re-New, Cargo tank/ Water Ballast tank with Tank gauging-Tank radar level of measurement as well all item related hydraulic control valve plus the associated water ballast pump & Cargo oil pump and all related mechanical & hydraulic package control system to be Re-Use/ Re-New or change as required as well the Hydraulic package unit with tubing installation Re-Use/ Re-New –
The Engine room machinery with Electrical motor driven which to be proceeded as RL&E Re-Use job combining ReNew job in related utility vessel supporting machinery/ rotating equipment ( such as Power Generation and Extension LV Switchgear panel, Boiler existing & new item, Existing Air compressor with air receiver, hydraulic package unit system, Fresh water, fire water system, Sewage threatment, MGPS/ Marine Growth Protection System, Seacheast pump system)
The LQ/Living Quarter accommodation building which to be proceeded as RL&E/ Removal Life Extension job / Re New job for all rooms accommodation ( with existing cabin + additional cabin ), CCR/Cargo Control Room, Telecomm/ radio room, Offices room, meeting room, Galley area facility, Recreation entertainment room, Hvac system installation, Lighting & small power distribution, Access Control system, F&G system installation, LAN Network system installation, GMDSS radio system communication with all related aerial antenna for VHF/UHF/Microwave with specific cabling, PAGA/ PABX Telephone system, CCTV system, All related Navigational system installation, Helipad with aviation system installation, Lifeboat with Davit Crane system, Pedestal Crane
The New Build work scope for All TOP SIDE SKID PACKAGE in related process and utility system which is fabricated/ assembly as in modular item, such as Solar GTG/ Gas Turbine Generator Package, Power Transformer 4160 VAC/ 480VAC, EDG Generator set with 480VAC, E-House building with Electrical room – Instrument room - Battery room – Roof top Hvac machinery and with all associated integrated component equipments of the EHouse , ICSS Panel Automation system, UCP for GTG & GTC with all associated external compartment such as NER Grounding system, VFD Control panel - Converter unit & Reactor Unit panel-GTG/GTC Battery charger Battery Rack & Battery Isolation breaker, Umbilical cabling power & optical cable plus hydraulic tube to be connected to wellhead platform, Flare Tip Ignition system, CSU-Crude Stabilization Unit skid module, SG-Sale Gas/ FG-Fuel Gas/ PWT skid module, Chemical Injection Package, Solar GTC/ Gas Turbin Compressor – 3/ Three Stage Compressor, HP - LP KO Drum skid, Custody metering Package with Flow Comp metering panel - Water proofer unit & Sampling unit, Chemical Injection package, Instrument air Compressor system with Dryer & Air receiver, Laboratory room/ container - as part of EPC project specification for Non CLASS Cert system.
Client Rep - As Electrical Instrument QC Inspection
JFJV / JGC-Fluor Join Venture
02.2022 - 04.2022
Company Overview: LNG Canada
Doing the Inspection for Mechanical Completion “ITR A- As Construction stage” and “ITR B- As Mech Completion Walkdown” for the overall E&I installation Equipment Access Control system - Lighting & small power – F&G system/ instruments devices - and all item related for Hvac system.
EIT Mechanical Completion – PreComm Engr/ EIT QC Coordinator
Company Overview: QATAR GAS NOC Gallaf Batch 02 - ASCEA & ASEHA offshore wellhead Platform project development – Area Al Shaheen Field Qatar @ SMOE Yard Batam.
To Coordinate on re-setting of the scope responsibility for Construction team work, Quality Inspection team work (QC Atex - QC Non Atex team & the precomm team ) in related MC-Mechanical Completion target achievement with refer to Commissioning Skyline plan / the ICAP setup data populated with all related overcome check sheet by system sub system arrangement, as well to provide JobCarding detail works – material & Manhours Calculation for the Offshore COW/ Carry Over Works item.
Production Supervision/ Monitoring & FAT witness
Longson Vietnam petrochemical and Arctic LNG2 Russia
08.2020 - 04.2021
Company Overview: Jakarta-Cikarang
Schneider LV Switchgear Panel with Job responsibility for Coordination/ Monitoring on Line assembly on the Panels (Component install & Busbar install/ wiring internally/ Drawers FAT) Visual check and all the requirement test arrangement (Compliance verification check for the dimensional & outline arrangement panel with BOM-spec / rating component, check verify on DFT Painting, witnessing on typical Operation / Function test of panels with Mechanical operating check - Electrical function test – Primary test for CT/VT ratio check & Contact Resistant check – ACB Function test, ATS Function Test, Secondary test (SEPAM/ Protection relay system for Over voltage / Under voltage-Over current protection infinite/ Definite – Over frequency/ Under frequency, Power meter function test, Synchronizing test – Dielectric HIPOT test combined Insulation resistant test before & after HIPOT) as well Monitoring Final check completeness & packaging procedure
Siemens MV 11.5 Kv Switchgear Panel (3 Unit Line-up Item no – Qty per Tag item : 19 Cubicles, 9 Cubicles & 15 Cubicles ) with FAT Visual Dimensional check and Test arrangement (Compliance verification check the dimensional & outline arrangement panel with spec rating component, witnessing on typical Operation / Function test of panels with Mechanical operating check - Electrical function test – Primary test for CT/VT ratio check & Resistant check – Secondary test (Protection relay system for Over voltage / Under voltage-Over current protection infinite/Definite – Over frequency/Under frequency-Thermal arching sensing protection, Power meter function test, Synchronizing test – HIPOT test combined Insulation resistant test before & after HIPOT) as well Monitoring on Final check completeness & packaging procedure
GE Power Transformer 110 Kv /11,5 Kv - 80 MVA with (Qty : 3 Unit) Visual dimensional check and Test arrangement (Compliance verification check for the dimensional & outline arrangement panel with spec rating component, witnessing on typical Routine test - Special test and Operation / Function test of panels)
Client Representative as EIT Construction Engineer
BP Berau
07.2019 - 08.2020
Company Overview: TEP/ Tangguh Expansion Project
Train 03 Process Area which is including of LCR#03 Building with internally EIT equipment combining with all related cabling internally LCR/ and externally to outdoor process area (Electrical room with raise floor and contain of MV/ LV SWGR/ MCC panel – UPS Control and Distribution panel - VSD/VFD Control panel – Heat Tracing Control panel – HMI Control panel – Cathodic protection Control panel ), Instrument room with raise floor and contain of ICSS panels for Analog /Digital (I/O) Marshalling & System control cabinet – Compressor Control Panel – DC Power Distribution panel, Battery room (Grouping of Cell battery - Battery Isolation Switch, Hvac room (Contain Air condensing unit, Air handling unit & HVAC control panel) and Transformer bay area
New MCB Building which is consist of (Instrument electrical Equipment room, Instrument control room, Telecomm room, Electrical SWGR room with raise floor - Battery room, HVAC room, Operation support offices room and the Transformer bay area) which all related Equipment Panels and all cabling related externally-internally-interfaces of all types of cableMV/ LV/ Control/ Instrument IS-Non IS/ Telecomm FO-Cat & Non Cat cable-with underground /above ground - cable racking support system plus and all related electrical/ instrument/ F&G field end device
Onshore Receiving Facility which is including of LCR-21 PreFab Instrument Control building & PreFab Elect Substation building with all related equipment (Automation control system, In UPS AC/DC system, F&G Panel and integrated with HVAC system), Electrical Substation Building (LV SWGR/ MCC/ DB Panels and integrated HVAC system), Transformer bay area with several number of Outdoor LV Transformer Distribution, and all related Underground / Above ground cabling (MV/ LV/ Control/ Instrument cables) for external equipment / field end device as well for underground line supply cabling from the utility area/TR#03 and all interfacing links cabling system to the existing facility.
Client Representative as Construction supervision / Quality Inspection
TCO/ TengizChevroil – PJV Kazakstan
11.2017 - 03.2019
Fabrication Construction Installation and Assembly of E-House building equipped with Switchgear GIS 110 Kv by SIEMENS and E-House with Non GIS Switchgear by SCHNEIDER, constructed in WASCO Engineering fab yard batam with responsibility Monitoring coordinate supervise during receiving material inspection/ compliance verification, as well on the fabrication construction stage with refer to the project detail drawing designed/ specification requirement in related the installation result for quality works comply to be inspected and further to proceed for MC-Mechanical Completion Acceptance by Subsystem and precomm/ commissioning test witness
Client Representative As Construction Supervision
Medco Energy Indonesia
06.2017 - 11.2017
Company Overview: CPP Gas Plant Facility Project
Works monitoring/supervision/coordination in between JGC Main Con EPC Contractor with SubContract PT Wen in related the availability project documents ( drawings/ specification ) deliverable item for construction works – proceeding as well the material requirement (Client free issue supply item, Contractor scope of supply and the bulk material scope supply by subcont) – attend weekly progress coordination meeting with SubCont
Coordinate / monitoring on the installation works execution & ensuring for compliance to the drawing/ specification requirement and acceptable quality result during Elect Inst installation works of for LV Power Generation system, Electrical Building – Instrument control/ offices building with raised flooring, internally integrated equipment power control distribution system, process automation with DCS F&G control monitoring system ( Hvac system, MV LV SWGR panel, UPS batt system, – Process utilities machinery/ storage vessel tanking – raw material / chemical process & waste chemical storage warehouse – underground/ above ground with pipe racking / cable racking support for cabling installation – lightning/ Grounding protection system – cathodic protection system
Client Representative As Construction Supervision & Quality Inspection
Eni Muara Bakau
03.2016 - 03.2017
Company Overview: ORF/ Onshore Receiving Facility Project
Electrical / Instrument control building integrated with raised flooring
LV Power Generation system and power distribution/ control & protection
Hvac system installation - Elect LV Swgr/ LV DB’s panel-
AC-DC UPS system
Instrumentation ICSS, F&G system installation, Gas metering/ Analyser monitor control Panels with Mimic - HMI
Access control system, for office operation building and
Telecomm system with underground Fiber Optic cabling installation with 4 Km Length-along side with onshore pipeline from offshore – ORF onshore, and in parallel with MV cable, LV power cable as well install cathodic protection for pipeline in certain point located as designed
Cathodic protection system installation for ORF - plant area
Electrical Instrument Telecomm cabling with Underground cabling - Above ground cabling with Pipe rack/ cable racking support
Lighting installation indoor-outdoor, E&I Grounding/Earthing/Lightning protection system
Telecommunication installation system with Telephone system installation/ Microwave/ UHF/ Telecommunication tower antenna with 125 mtr Height .
Construction Manager
Radian Elect Inst Singapore
10.2015 - 02.2016
Company Overview: E-House Building (unit ESS700) project – Yamal Russia – Fabrication & Installation @ Siemens – Batam, Indonesia
Client Rep As EIT Construction Engineer
Exxonmobil - Mobil Cepu Ltd
05.2012 - 10.2014
Company Overview: Banyu Urip – FSO/ Floating Storage & Offloading GAGAK RIMANG Conversion vessel @ Sembawang Shipyard Singapore
During on Fabrication – Construction – Installation works ( as related RL&E / Repair Life Extension review/ verify scope ) on the Banyu Urip – FSO/ Floating Storage & Offloading GAGAK RIMANG Conversion vessel @ Sembawang Shipyard Singapore with scope of responsibility for Construction Supervision-Monitoring/ Reporting on construction progress - Coordinate for problem solving-Quality survelience/ inspection-Mechanical Completion by subsystem through CMS software / PreComm for the overall E&I subject item installation. Starting with dismantling works and renew of the overall existing LQ building installation ( Rooms-Bath room-furniture-Elect lighting power-Telecomm-F&G-Centralize TV entertain with Dome antenna, VHF/ UHF/ Microwave data radio telecommunication system & antenna, Instrument control room with telecom room ) for 70 pax capacity, LV Power generation system-Electrical rooms with LV SWGR-UPS batt system & all DB’s panel related , RL&E (Repair Life Extension scope) as to Renew & Repair for the Process Utilities machinery system – oil storage vessel control / monitoring system, cathodic protection system
PMT / E&I Supervision
Wasco Eng Singapore
05.2011 - 05.2012
Company Overview: FPSO ARC II – Teekay Tirosidin Brazil ( modular building )
SR E&I Campaign Engr
SKSWood Brunei Darussalam
04.2008 - 02.2011
Company Overview: BSP-Brunei Shell Petroleum/ Brunei water offshore oil & gas platform @ the West AMPA field and the East Champion field
To prepare/ estimating work pack item related
Coordinate / tracking / verify the availability of materials through SAP database system as well the actual storage stock inventory-delivery status arrangement
Daily works coordination on offshore works execution / progress monitoring with offshore team work
Attending daily morning coordination/ works progress updating with SCO/BSP.
Lead E&I Engr
JRay McDermott
03.2006 - 04.2008
Company Overview: Woodside LNG Train V project
Leading on small group E&I Production Engineer team
To Coordinate with Client (Foster Wheeler-Woodside/ Engineering/Planner – Cost Control/Logistic-Matl control & Site executor team) in related SOW, Project plan schedule, deliverable item ( Design drawing / specification ) and the equipment/ material tracking status and to be distribute handover to the field execution as well to resolve for any changes correction to be done
Team work Review/ Verify for the TBE/ Technical Bid Evaluation for Supplier Vendor of certain item material selection to be purchase
Supervision on Fabrication Construction 75 Modul of LNG Gas processing plant to be shipment on several batch
Daily coordination & monitoring with Superintendent/ Supervisor/ Foreman to ensure the safely works execution to be refer to latest design drawing/ specification with any potential finding item to be raised or to be resolve in-situ
Coordinate and execute the inspection for installation as well to prepare further for mechanical completion process with system subsystem ITRsAaa
Coordinate / Tracking / verify the availability of materials through PIMS database system as well the actual store stock inventory-delivery status arrangement
Daily works coordination on the works execution / construction progress monitoring and coordinate for readiness to proceed further for the MC/ Mechanical Completion-PreComm stage
SR E&I Engineer / PMT
SimeDarby Engineering Malaysia
05.2004 - 02.2006
Company Overview: Guntong “E” Offshore Platform for ExxonMobil Malaysia
Fabrication and Construction of the Guntong “E”/ Lift Gas/ compression Offshore Platform for EMEPMI-ExxonMobil Malaysia with 6 item no Part Modular of offshore platform Power Generation system/ Electrical Room & Instrument Control room with all associated Equipment SWGR MCC DBoard panels UPS AC DC HVAC system HMI MIMIC panel – Navigation /Communication system with Radio Frequency Microwave VHF UHF lighting Grounding - Instrument DCS F&G ESD system & Marshalling cabinet – One MSF/ Main Structure Frame – 1 Structural Bridge with lighting small power/ Instrument - F&G– 1 Structural item with Flaring ignition/Vent tip unit
Leading small group Engineer & Supervisor team work
Close Coordinating/ Monitoring with Client ExxonMobil, Engineering detail design team and Subcontractor in related deliverable item ( drawing / specification – Re Changes/ revision/ clashing issue ) with regard construction execution with finding issue to resolve and the progress target installation achievement to follow the project plan schedule
SR E&I Engr / Project Estimator
TransBakrie Jakarta
07.2000 - 05.2004
Working as Client Representative & EPC contractor on the Fabrication Yard facility, Onshore – Offshore Construction plant facility with the scope of the overall Instrument Electrical Telecomm installation for ( FPSO/ FSO/ E-House Elect building modular/ Onshore LNG Gas-Natural Gas Process plant with Modular fabricate/ Offshore Platform wellhead-Compression-Process facility ) as the following scope of work ;
> ELECTRICAL INSTALLATION with all associated equipments/ end devices/ cabling and supporting material as the following :
HV GIS 110 Kv - MV-LV Switchgear/ MCC panel which is shipment/ delivery in section by section with all related ship loose item components-accessories-fixing assembly item & the inter section wire cabling that will be Re-assembly/ to be integrated on site as well to continue to ( FAT/ SAT Test @ PreComm stage ) which to be associated with all inspection/ testing required ( Mechanically Operation check – mechanically interlocking protection for RACK In & RACK OUT- Insulation megger test-Ducker test/ Contact resistant test/ Arching detection test/ Under Voltage & Over Voltage test, Over Current test, Breaker Rack In-Rack out, Breaker Safety mechanism interlocking system, Electrically safety interlocking system on breaker in service position/ connected
Power/ Distribution Transformer Unit (Dry type and Oil Immersed insulation type) which is required for Type test–Routine test–Special test–Function test
Skid package unit such as GTG-Gas Turbine Generator/ Diesel Generator/ GTC-Gas Turbine compressor/ Air Compressor with air receiver tank - dryer unit/ HVAC system unit with all associated equipments (Condensing unit/ AHU/ Air intake-Discharge & Return air supply ducting, damper system, heater unit, UCP/Unit control panel for control & power distribution - local panel unit/ off-skid item & on-skid item end devices combined with all associated Instrument-F&G components / all item internally-interfaces cabling), AC-DC UPS system with Rectifier unit-Control unit-DBoard unit-Isolation switches unit and the Qty grouping of cell battery back-up
Process/ Utility pumps rotating equipments with electrical motor driven which is consist of “all required Ex item / industrial standard equipments” for Hazardous-Non Hazardous electrical type of motors & LCS control switches
Indoor-outdoor Power & lighting installation combined with various format conventional switches-auto photo cell switch and power welding outlet/ conventional small power outlet which is required “Ex item / industrial standard equipments” for Hazardous-Non Hazardous location, Busduct system installation as required
Nav aid system ( with Navigation Light/ Lantern signal unit with 10 - 15 NM/ Nautical Miles - Fog Horn sounder alarm unit - Radar Beacon unit and Control panel unit with battery backup ) and the offshore helicopter aviation system ( with Aviation/ perimeter lights units combining flood lights units located @ helicopter landing area )
Earthing-Grounding system installation with (PE Elect Protective Earth-IE/ ISE Instrument safety Earth)
Lightning Protection system with segregation to EIT Grounding system or linked @ grounded point to the electrical earthing system
MV-LV-Power AND Control cable installation (by underground with Elevation level arrangement per type function of cable for E-I-T)/ or ( installation above ground with segregation arrangement as per function of cable – such as Power cable AC MV/ LV Control cable, DC Power cables, Instrument Analog/Digital cables, Inst IS Blue cables with Armored-UnArmored spec cables/ and or Fire resistant-Flame Returdant of cables which to be laid on the typical cable racking system (Alum/SSteel/Galv) such as cable ladder-perforated channel tray or using of continuous galvanized solid conduit or flexible anaconda conduit /non continue conduit protection with all accessories fitting which will be combined with
Prefab manufacture Supporting system as with 2 major support typical installation as BOLTING type produce by HILTI / Unistrat support system that will be fully assembly by bolted ( U/ or C-Channel combine with various fixing accessories such as Bolt & spring Nut-Beam clamp-Arching stud welded-threadedRod and etc ) or using of conventional fully welding support system with Galvanized/ Painted Carbon Steel C-Channel/ Angle bar as designed for supporting of electrical strand alone/ wall mounted/ suspended/ hanging type mounted.
> Instrument installation with the following associated scope of works for equipments/ end devices/ cabling and supporting :
ICSS DCS/ PLC control automation system panel
Transmitters & Conventional pointer Gauges ( To be install remotely/ or direct mounted on the line of pipe ) with several cases requirement to be Re-calibrated on-site for all related item Instrument end devices for Pressure/ Temperature/ Level with re-setting/adjustment for zeroing on pointer gauges-adjustment for alignment of 4-20mA injection to pressure temperature flow input (in regard the Gauges /indicator /Transmitter & switches unit )
Instrument end devices ... such as ;
( ESDV /SDV /BDV named as Actuated ON-OFF valves ) with pre-testing requirement in regard travelling time / stroking test response time during valve opening/closing as well the Seat Leak test performing for OnOff valves - back seat leak test for Control valves, and the ( CONTROL VALVE PCV/ LCV ) with proportional movement when Opening / Closing of the valve through integral control of 4-20 mA combined with pneumatic air control, and then For the ( PSV/ Relief valves PSV ) apply with popping test.
Instrument tubing ( SS304/SS316/SS317 ) installation ( for Gas line with non sloop install/ Liquid line with sloop install ) which will associated with all various type of tube fittings / valves as designed for pneumatic line control /Impulse line - inst Gas line control /hydraulic line control
Instrument cabling for IS/ Non IS system to be laid by segregation on the supporting cable rack system – Process Line control & ESD shutdown line control system
> Fire & Gas detection – monitoring system installation combined with FM-200 fire suppression system (F&G control panel , Sensor/ detection compartment Eg. Heat detector, Smoke detector/ HSSD - IR/ Flame det & Gas det -ESD button/ Manual Call point)
> Telecommunication system installation (Telecomm Equipment Room with Telephone-PABX/ LAN system) CATV Entertainment & Master Clock system/ CCTV/Access Control system / Microwave & VSAT/ PAGA-PAEA system etc.) with all related type of Telecommunication system installation (Cat 5 – Cat 6 cable/ Coax cable/ RF cable/ Fibre Optic cable which will be required dedicated special hub connector (such as RJ45-RS232 etc) as well the typically dedicated test equipment per type of telecommunication cable such as LAN/Ethernet cable tester, Splicing/ jointer/ OTDR/ Optical Time Domain Reflectometer tester for the fibre optic cabling installation
Education
Bachelor of Science - Electrical Engineering
Univ UMI
Indonesia
07.1997 - 06.1999
Associate of Applied Science - Electrical Engineering
Univ Pancasila
Indonesia
07.1989 - 06.1992
No Degree - Electrical Engineering
STM Technical High School
Indonesia
07.1979 - 06.1982
Skills
Over 15 years plus of experience, been working on the oil & gas industry – Fabrication & Construction works for onshore (LNG-Natural gas process plant)/ offshore plant facility (FPSO - FSO, Offshore Wellhead platform/ CPP Platform/ Compression Platform, E-House/Substation)Overall mostly related with scope of Instrument - Electrical & Telecom works
Certification
ATEX/ Compex 01/02/03/04 Training @ ATTS Batam-Spore (May 2025), Attend Electrical Instrument Hazardous Training ATEX/CompEx (Ex 01 - Ex 04) @ Petrotechno Jakarta (April 2020 )
References
Stephen J., Reid, Ex my Superior (ExxonMobil FSO Conversion Gagak Rimang – Banyu Urip Construction advisor), stevereid70@hotmail.com, +1 (832) 922 9015, ExxonMobil
Timeline
Client Rep - E&I Supv Acting E&I Supt/ Construction Manager
ABB
10.2024 - Current
Client Rep as EIT Quality Inspection/ Works Supervision-Coordination/ Vendor visit for Equipment FAT witness/Inspection-Review & Signed for MC/Mechanical Completion ITR with PunchList
Medco Energy FPSO Marlin Natuna
06.2023 - 09.2024
Auditor/ SR QC Inspector
OES Asset Integrity LLC Abudhabi
10.2022 - Current
Client Rep - As Electrical Instrument QC Inspection
JFJV / JGC-Fluor Join Venture
02.2022 - 04.2022
EIT Mechanical Completion – PreComm Engr/ EIT QC Coordinator
Finance and Accounting Manager at PT Jiva Agriculture Indonesia (Olam Group)Finance and Accounting Manager at PT Jiva Agriculture Indonesia (Olam Group)