Overview
Work History
Education
Skills
Languages
Websites, Portfolios and Profiles
References
Custom Section
Timeline
Generic
Jean Jhenesly Firnandus Tumanggor

Jean Jhenesly Firnandus Tumanggor

Kota Pekanbaru

Overview

14
14
years of professional experience

Work History

Electrical Expert

PT Pertamina Training and Consulting
09.2022 - 10.2023
  • Validating the implementation of substation South maintenance in the field
  • Review individual work procedures for the implementation of substation maintenance
  • Analyze the availability of spare parts material in carrying out Substation south maintenance

Supervisor electrical

PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2022 - 09.2022
  • Preventive Maintenance for equipment panel GIS 20 kv, Switchgear 6,3 Kv, Power Transformer and LV Mcc and the other equipment electrical.
  • Monitoring Load Consumption power
  • Trouble shoot power system and synchronization power plant
  • Trouble shooting for electrical equipment during operation maintenance power plant.
  • Supervision for Installation field electrical system voltage from Medium voltage and Low Voltage

Sr Electrical Engineer

PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2019 - 09.2022
  • Review Contract, Technical Check List, Peformance guarantee, and TBE Time Schedule and Presiden Summary for project Power plant 7
  • Review Perform energizing and testing for electrical equipment such as lighting system, LV Distribution Board, Motor, MCC,etc.
  • Review Commissioning ITR for lighting system, LV Distribution Board, electrical cable, Motor, etc.
  • Review Perform illumination test for lighting system and Inspection Test Report (ITR) for lighting system.
  • Trouble shooting for electrical equipment during perform commissioning stage.
  • Supervision for Installation field electrical system voltage from Medium voltage and Low Voltage
  • Review Red Line Mark-up for schematic diagram, interconnection wiring diagram, lighting & small power connection diagram, SLD, as per actual at site.

Electrical Engineer and Construction engineer electrical

PT RGE GROUP ( DIVISION PROJECT APR & APRIL)
07.2015 - 03.2019
  • Review Contract, Technical Check List, Peformance guarantee, TBE & Time Schedule and Presiden Summarry for project Converting plant, Paper Machine 3 and Spinning plant and CS2 Recovery Plant
  • Review design electrical system for medium Voltage, Low Voltage and Protection system electrical
  • Monitoring work progress and supervise completion of Electrical construction work and highlight issue to the contractor regarding construction activities.
  • Supervise Electrical construction activities by Contractor / Subcontractor such as: Motor & LCS, Lighting Fixtures, Junction Boxes, Cable glanding & termination, MCC Drawer Installation, MCC Marshalling installation, Temporary Construction Facility, etc.
  • Perform quality control duties and responsibilities regarding the work being performed.
  • Prepare daily & weekly report and report to Construction Manager / CSR.
  • Monitor the progress of works and highlight issues to the contractor and subcontractors regarding workschedule.
  • Identify contractor and subcontractor non-compliance with safety, health, and environmental quality standards.
  • Ensure contractor works is comply with project specification and standard installation of project.
  • Monitor project, activities and assist for future planning.
  • Issue notices non-compliance to contractors regarding quality of work or scheduling.
  • Monitor punch list, coordinate with QC and assists for closing the punch list.
  • Support inspection, pre-com and commissioning activity.
  • Reason for leave: Completion of Project

Electrical Commissioning Engineer, Supervisor electrical engineer

PT Atmindo (Boilerprofessional)
05.2014 - 01.2015
  • Preparation & perform Boiler Start up & Running Test.
  • Assist for Boiler Commissioning activity: ensure Boiler Auxiliary such as Induce draft fan motor, Secondary air fan motor, Carrier fan motor, Motor screw pump motor can work properly.
  • Perform energizing and testing and prepare inspection test report (ITR) for Low Voltage Switchgear & MCC, Low Voltage Distribution Board & Lighting Transformer.
  • Perform solo run test & mechanical run test of electric motor and prepare Inspection & Test Report (ITR) for electric motor.
  • Trouble shooting for electric motor while perform motor solo run test & motor mechanical run test.
  • Perform energizing and mechanical run and prepare inspection test report (ITR) of IA Compressor Package, Flare Package, HVAC Package.
  • Perform illumination test for lighting system and prepare Inspection Test Report (ITR) for lighting system.
  • Reason for leave: Completion of Project

Electrical Engineer

CV Selta abadi Jaya
02.2011 - 02.2012
  • Prepare Data Sheet for Distribution Transformer
  • Develop Load List Calculation.
  • Develop Load Flow Study, Short Circuit Study.
  • Equipment sizing calculation for Power Distribution Transformer, LV Switchgear, LV Distribution Board, Power Cable, etc.
  • Prepare TBE for Electrical Equipment such as: Cable, Transformer Distribution
  • Supervision for Installation HV,MV Power Transformator & Trafo Distribution
  • Supervision for Installation Panel Control and circuit system Feeder Distribution
  • Client : PT PLN
  • Reason for Leave: Completion of Project

Electrical Engineer

CV Karya Leo engineering
03.2010 - 01.2011
  • Prepare Data Sheet for Distribution Transformer, Specification cable
  • Develop Load List Calculation.
  • Develop Load Flow Study, Short Circuit Study.
  • Equipment sizing calculation for Power Distribution Transformer, MV Switchgear, LV Distribution Board, Power Cable, etc.
  • Prepare TBE for Electrical Equipment such as: Cable, Transformer Distribution
  • Supervision for Installation HV,MV Power Transformator & Trafo Distribution
  • Supervision for Installation Panel Control and circuit system Feeder Distribution
  • Client : PT PLN
  • Reason for Leave: Completion of Project

Education

Bachelor's degree - Electrical Engineering, Power Engineering

University of North Sumatera
01.2013

Skills

  • MS Office
  • Power Point
  • Excel
  • Autocad
  • Power BI

Languages

English
Indonesian

Websites, Portfolios and Profiles

https://www.linkedin.com/in/jhenesly-tumanggor

References

  • Rolando Porras Tronco, Head Of Department at April, APR project Division, (+63)9283538172
  • Ramsingh, Project Lead Electrical at IKPP, (+62)812 89580386
  • PT ATMINDO, (+62)811 140 703

Custom Section

  • Electrical Specialist
  • Electrical Engineer
  • Electrical Supervisor

Timeline

Supervisor electrical

PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2022 - 09.2022

Electrical Expert

PT Pertamina Training and Consulting
09.2022 - 10.2023

Sr Electrical Engineer

PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2019 - 09.2022

Electrical Engineer and Construction engineer electrical

PT RGE GROUP ( DIVISION PROJECT APR & APRIL)
07.2015 - 03.2019

Electrical Commissioning Engineer, Supervisor electrical engineer

PT Atmindo (Boilerprofessional)
05.2014 - 01.2015

Electrical Engineer

CV Selta abadi Jaya
02.2011 - 02.2012

Electrical Engineer

CV Karya Leo engineering
03.2010 - 01.2011

Bachelor's degree - Electrical Engineering, Power Engineering

University of North Sumatera
Jean Jhenesly Firnandus Tumanggor