Validating the implementation of substation South maintenance in the field
Review individual work procedures for the implementation of substation maintenance
Analyze the availability of spare parts material in carrying out Substation south maintenance
Supervisor electrical
PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2022 - 09.2022
Preventive Maintenance for equipment panel GIS 20 kv, Switchgear 6,3 Kv, Power Transformer and LV Mcc and the other equipment electrical.
Monitoring Load Consumption power
Trouble shoot power system and synchronization power plant
Trouble shooting for electrical equipment during operation maintenance power plant.
Supervision for Installation field electrical system voltage from Medium voltage and Low Voltage
Sr Electrical Engineer
PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2019 - 09.2022
Review Contract, Technical Check List, Peformance guarantee, and TBE Time Schedule and Presiden Summary for project Power plant 7
Review Perform energizing and testing for electrical equipment such as lighting system, LV Distribution Board, Motor, MCC,etc.
Review Commissioning ITR for lighting system, LV Distribution Board, electrical cable, Motor, etc.
Review Perform illumination test for lighting system and Inspection Test Report (ITR) for lighting system.
Trouble shooting for electrical equipment during perform commissioning stage.
Supervision for Installation field electrical system voltage from Medium voltage and Low Voltage
Review Red Line Mark-up for schematic diagram, interconnection wiring diagram, lighting & small power connection diagram, SLD, as per actual at site.
Electrical Engineer and Construction engineer electrical
PT RGE GROUP ( DIVISION PROJECT APR & APRIL)
07.2015 - 03.2019
Review Contract, Technical Check List, Peformance guarantee, TBE & Time Schedule and Presiden Summarry for project Converting plant, Paper Machine 3 and Spinning plant and CS2 Recovery Plant
Review design electrical system for medium Voltage, Low Voltage and Protection system electrical
Monitoring work progress and supervise completion of Electrical construction work and highlight issue to the contractor regarding construction activities.
Supervise Electrical construction activities by Contractor / Subcontractor such as: Motor & LCS, Lighting Fixtures, Junction Boxes, Cable glanding & termination, MCC Drawer Installation, MCC Marshalling installation, Temporary Construction Facility, etc.
Perform quality control duties and responsibilities regarding the work being performed.
Prepare daily & weekly report and report to Construction Manager / CSR.
Monitor the progress of works and highlight issues to the contractor and subcontractors regarding workschedule.
Identify contractor and subcontractor non-compliance with safety, health, and environmental quality standards.
Ensure contractor works is comply with project specification and standard installation of project.
Monitor project, activities and assist for future planning.
Issue notices non-compliance to contractors regarding quality of work or scheduling.
Monitor punch list, coordinate with QC and assists for closing the punch list.
Support inspection, pre-com and commissioning activity.
Preparation & perform Boiler Start up & Running Test.
Assist for Boiler Commissioning activity: ensure Boiler Auxiliary such as Induce draft fan motor, Secondary air fan motor, Carrier fan motor, Motor screw pump motor can work properly.
Perform energizing and testing and prepare inspection test report (ITR) for Low Voltage Switchgear & MCC, Low Voltage Distribution Board & Lighting Transformer.
Perform solo run test & mechanical run test of electric motor and prepare Inspection & Test Report (ITR) for electric motor.
Trouble shooting for electric motor while perform motor solo run test & motor mechanical run test.
Perform energizing and mechanical run and prepare inspection test report (ITR) of IA Compressor Package, Flare Package, HVAC Package.
Perform illumination test for lighting system and prepare Inspection Test Report (ITR) for lighting system.
Reason for leave: Completion of Project
Electrical Engineer
CV Selta abadi Jaya
02.2011 - 02.2012
Prepare Data Sheet for Distribution Transformer
Develop Load List Calculation.
Develop Load Flow Study, Short Circuit Study.
Equipment sizing calculation for Power Distribution Transformer, LV Switchgear, LV Distribution Board, Power Cable, etc.
Prepare TBE for Electrical Equipment such as: Cable, Transformer Distribution
Supervision for Installation HV,MV Power Transformator & Trafo Distribution
Supervision for Installation Panel Control and circuit system Feeder Distribution
Client : PT PLN
Reason for Leave: Completion of Project
Electrical Engineer
CV Karya Leo engineering
03.2010 - 01.2011
Prepare Data Sheet for Distribution Transformer, Specification cable
Develop Load List Calculation.
Develop Load Flow Study, Short Circuit Study.
Equipment sizing calculation for Power Distribution Transformer, MV Switchgear, LV Distribution Board, Power Cable, etc.
Prepare TBE for Electrical Equipment such as: Cable, Transformer Distribution
Supervision for Installation HV,MV Power Transformator & Trafo Distribution
Supervision for Installation Panel Control and circuit system Feeder Distribution
Client : PT PLN
Reason for Leave: Completion of Project
Education
Bachelor's degree - Electrical Engineering, Power Engineering
University of North Sumatera
01.2013
Skills
MS Office
Power Point
Excel
Autocad
Power BI
Languages
English
Indonesian
Websites, Portfolios and Profiles
https://www.linkedin.com/in/jhenesly-tumanggor
References
Rolando Porras Tronco, Head Of Department at April, APR project Division, (+63)9283538172
Ramsingh, Project Lead Electrical at IKPP, (+62)812 89580386
PT ATMINDO, (+62)811 140 703
Custom Section
Electrical Specialist
Electrical Engineer
Electrical Supervisor
Timeline
Supervisor electrical
PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2022 - 09.2022
Electrical Expert
PT Pertamina Training and Consulting
09.2022 - 10.2023
Sr Electrical Engineer
PT Indah Kiat Pulp and Paper Serang (APP Sinarmas Group)
11.2019 - 09.2022
Electrical Engineer and Construction engineer electrical
Electrical Draughtsperson /Electrical Circuit Designer at Edge Line EngineeringElectrical Draughtsperson /Electrical Circuit Designer at Edge Line Engineering