Summary
Overview
Work History
Education
Skills
Accomplishments
Technical Competencies - Latest Results
Other Experiences
Office Address
Employee Id
Position
Birthplace
Home Number
Personal Information
Training
Skills
Timeline
Generic

MUHAMMAD HADI MAHMUDI

Power Application Engineer
Jakarta Selatan

Summary

a professional in Oil & Gas Industry with 9 years experience. Skilled in Electrical especially in High Voltage Maintenance and Power system. Having basic knowledge in instrumentation, and also have experience as project engineer.

Overview

15
15
years of professional experience
13
13
years of post-secondary education

Work History

Electrical Engineer

REKAYASA ENGINEERING
01.2012
  • Prepare budgetary for AFA (non AFE) projects related to surface facilities Electrical scope
  • Design/up-grade Electrical System (Power generation, Switchgear, MCC, UPS, distribution panel, lightning protection, etc.) - Prepare calculation, specification, and data sheet for material requisition and scope of works of tender document
  • Review engineering document from bidders (Technical Bid Evaluation) & involved in FAT, SAT, commissioning & start-up.

Emerson Process Management
11.2011
  • Electrical hazardous Area Classification, held by Petrotekno&BP Migas, certificate by OPITO (Offshore Petroleum Industry Training Organization (UK)
  • Control Valve Engineering School, held by PTCS (Control System), certificate by

Service & Commissioning Engineer

PT ABB SAKTI INDUSTRI
01.2010
  • Supervising, start-up and commissioning MCC 690 V in L206 project OSV (Offshore Supply Vessel).Dry Docks World (Batam)
  • ABB Singapore project., - Commissioning PQFM (Harmonic active filter) 690V.PT Indopoly Swakarsa Industri (Cikampek)
  • 2010 - Start-up and commissioning switchgear 7.2 kV and MCC 380 V in P9 and
  • P10 projects
  • PT
  • Indocement (Cirebon).2010 - Start-up and commissioning switchgear 6,6 kV and MCC MNS 380V in KEBB(Coal plant 25MW)
  • Petrokimia Gresik (Gresik).2010 - Start-up and commissioning replacement switchgear 3,3 kV in Pulp Making.Lontar Papyrus Pulp and Paper Industry
  • (Tebing Tinggi).2010 - Performance test (Analysis network using Power Quality Analyzer)
  • Switchgear and MCC in Block 2,4,5 phase II project
  • PT
  • Indah Kiat Pulp and
  • Paper (Perawang)
  • 2010
  • ACHIEVEMENT
  • SERTIFIKASI

Power Application Engineer

SKILL GROUP
01.2017 - Current
  • Maintains the best configuration of power distribution at any given circumstances (i.e
  • Varied load condition & power generation availability)
  • Enforces HSE procedures to ensure the safety of personnel and property
  • (E.g
  • Safety meeting/inspection, STOP cards, reviews of SOP/JSA/RA, etc.)
  • Ensures the development of personnel by creating a healthy and challenging workplace, recommending special training courses, and continuous job rotation
  • Ensures an up-to-date and systematic documentation (record keeping) for every operation & maintenance activity
  • Manages, handles, controls and monitor the power system project from engineering design phase, procurement, installation and commission
  • Conduct troubleshooting on various electrical equipment, mainly on power generation system, HV distribution system and Subsea cable
  • Supervise execution of project modification/upgrade on HV electrical distribution system (34.5 kV & 13.8 kV) such as new Gas Turbine installation,SWGR installation, replacement of SWGR to SF6, and others which related to 34.5 kV & 13.8 kV system
  • Supervise relay verification & calibration in 34.5 kV & 13.8 kV system in yearly basis
  • Supervise PCR&cable tray refurbishment projects in all platforms
  • Design and upgrade Direct transfer trip (DTT) or load shedding to ease operator during certain conditions of power operation
  • Prepare project schedule, game plan & SOP prior to execution of the projects
  • Coordination with related department (Operations & Business Units) regarding execution of each projects
  • Run power system analysis study and protective relay coordination study using software such as Easy Power, Etap etc
  • Highlighted Projects
  • NBU Relay verification and calibration.2017
  • IntA 13.8 kV LBS replacement due to corroded deck
  • 2017

High Voltage Maintenance Controller

01.2015 - 01.2017
  • Plans preventive maintenance program for High Voltage equipments
  • Supervise implementation of maintenance program (SAP maintenance system) for high voltage equipment (Switchgears, Transformers, Subsea cables, UPS) at daily basis
  • Monitor back logs and set up priority of each maintenance program
  • Prepare project schedule, game plan & SOP prior to execution of corrective/shutdown maintenance
  • Controls safety device for high voltage equipments
  • Performs preventive maintenance service for SWGR, Xfmr IFLDR and etc
  • Coordinates with Power System to repair / replace old or damage equipments (LMS, IFLDR LBS) /system
  • Conducts oil sampling collection and dielectric strength test
  • Reviews and monitors High Voltage Maintenance data on the database system and integrate with SAP PM Module
  • Coordinates and supervises compliance with CNOOC’s QHSE policy in High Voltage Maintenance activities
  • Highlighted Projects
  • PM service switchgears PABL-SBU, CBU, and NBU in 2016
  • Partial replacement S/S Cable to CLX cable RamP1 at Pabelokan 2015
  • Rectify hotspot at internal bushing AVR transformer NorA 2016
  • Act as company man, during project Repair S/S Cable Pabl-ZelP 35 kV and ZelE-ZelB 13.8 kV using Bayu Cakrawala barge in 2016.

Electrical Engineering

Power & Gas, Power & Gas - Electrical
01.2015 - 01.2017
  • Engineering
  • Surface Facilities – Production Operation & Maintenance

High Voltage Maintenance Controller

IDEM
01.2012 - 01.2015
  • Prepare evaluation result of HV maintenance program in a year basis and prepare recommendation for future improvement
  • Review SOP & provide adequate tools for HV maintenance activity
  • Prepare SOW&SOR of contract services between CNOOC & third party for HV maintenance purpose (blanket service contract and goods consignment) such as transformers repair services, oil analysis of transformer, HVPD services etc
  • Prepare SOW&SOR of contract for special project (AFE/non-AFE) such as Purchase & Laying subsea cable, splicing kit, refurbishment big transformers, purchase of oil purifying machine etc
  • Review engineering document from bidders (Technical Bid Evaluation) & involved in FAT&SAT
  • Monitor and control ongoing contract service spending & duration to support HV maintenance activity
  • Highlighted Projects
  • Purchase and laying S/S Cable 13.8 kV CinD-Kitty & RamA-RamG
  • COO (Call off order) S/S cable 5 kV & splicing kit
  • Repair AVR Transformer 25 MVA ZelP
  • Purchase AVR Transformer 25 MVA for Titi
  • COO splicing kits for S/S cable 35 kV and 13.8 kV
  • COO Power transformers
  • Transformer repair services
  • Purchase mini purifying machine
  • Repair S/S Cable laying machine
  • Purchase High Voltage partial discharge equipment.

Electrical Engineering

Power & Gas
01.2012 - 01.2015
  • Surface Facilities – Production Operation & Maintenance
  • Engineering – Projects
  • TECHNICAL COMPETENCIES
  • Technical Competency Scoring Guideline:
  • Label Score Description
  • Exceptional 81 - 100 Frequently exceeded expectations
  • Employee was an exceptional contributor to the success of his/her department and the company
  • He/she demonstrated role model behaviors
  • Above Average / Requirements 71 - 80 Consistently met expectations and occasional exceeded expectations
  • Average 61 - 70 Consistently met expectations
  • Employee was a solid contributor to the success of his/her department
  • Below Average 40 - 60 Typically met expectations; however, occasionally failed to meet expectations
  • Need further development in one or more areas of expected job results or technical competencies
  • Unsatisfactory Performance 0 - 40 Consistently failed to meet expectations
  • Employee needs significant improvement in critical areas of expected job results or technical competency.

Instrument Engineer II

PETROCHINA Intl JABUNG
01.2010 - 01.2012
  • Prepare budgetary for all AFE related to surface facilities Instrument scope
  • Design/up-grade Instrumentation System (Field instrumentations, meteringsystem, shutdown panel electric/pneumatic,etc.) - Prepare calculation, specification, and data sheet for material requisition and scope of works of tender document
  • Review engineering document from bidders (Technical Bid Evaluation) & involved in FAT, SAT, commissioning & start-up.

Education

S1 - Electrical Engineering

Institut Teknologi Bandung
01.2005 - 01.2009

SMA - Natural Science

SMA Negeri 1
01.1999 - 01.2002

MTSN - undefined

MTSN Lubuk Sikaping
01.1993 - 01.1999

SD - undefined

SD Negeri 19

Skills

Power & Gas - Electrical Engineering

undefined

Accomplishments

2011, Electrical hazardous Area Classification, held by Petrotekno&BP Migas.

Technical Competencies - Latest Results

  • 04/2018, Foundation, Company Procedures, 3, 80
  • 04/2018, General Operations, Quality Assurance and Quality Control, 4, 85

Other Experiences

  • 2012, VICO, Electrical Engineer, Prepare budgetary for AFA (non AFE) projects related to surface facilities Electrical scope., Design/up-grade Electrical System.
  • 2010 - 2012, PETROCHINA Intl JABUNG, Instrument Engineer II, Prepare budgetary for all AFE related to surface facilities Instrument scope., Design/up-grade Instrumentation System.

Office Address

CNOOC office BEJ Tower 1

Employee Id

125473

Position

Power Application Engineer

Birthplace

Tanah datar

Home Number

021-7940457

Personal Information

Date of Birth: 04/27/87

Training

  • 2018, GE UR RELAY, SR-745, SR-489 TRAINING. PT.GAE. Jakarta.
  • 2017, ACCIDENT INCIDENT INVESTIGATION. Indotrain. Jakarta.

Skills

  • Power & Gas, Electrical Engineering, 01/2017, Present
  • Power & Gas, Electrical Engineering, 01/2015, 12/2016
  • Power & Gas, Electrical Engineering, 01/2012, 12/2014

Timeline

Power Application Engineer

SKILL GROUP
01.2017 - Current

High Voltage Maintenance Controller

01.2015 - 01.2017

Electrical Engineering

Power & Gas, Power & Gas - Electrical
01.2015 - 01.2017

Electrical Engineer

REKAYASA ENGINEERING
01.2012

High Voltage Maintenance Controller

IDEM
01.2012 - 01.2015

Electrical Engineering

Power & Gas
01.2012 - 01.2015

Emerson Process Management
11.2011

Service & Commissioning Engineer

PT ABB SAKTI INDUSTRI
01.2010

Instrument Engineer II

PETROCHINA Intl JABUNG
01.2010 - 01.2012

S1 - Electrical Engineering

Institut Teknologi Bandung
01.2005 - 01.2009

SMA - Natural Science

SMA Negeri 1
01.1999 - 01.2002

MTSN - undefined

MTSN Lubuk Sikaping
01.1993 - 01.1999

SD - undefined

SD Negeri 19
MUHAMMAD HADI MAHMUDIPower Application Engineer