Summary
Overview
Work History
Education
Skills
Accomplishments
Additional Information
Certification
Timeline
Hi, I’m

Mahyouhendra Kamil

QA/QC Inspector / Technical Representative/Third Party Inspector
Batam
Mahyouhendra  Kamil

Summary

Well-Qualified Quality Control Inspector Proficient in Inspection, Documentation, Reporting and Compliance standard, Have CSWIP 3.2.1 Senior Welding Inspector, CSWIP 3.1 Welding Inspector, NDT ASNT Level II for MT/PT/UT/RT PAUT Data Interpreter, Have an Experience as QA/QC Coordinator, QA/QC Inspector, Technical Representative, Third Party Inspector, Mechanical Inspector, Painting Inspector, for Topside Piping, Structure, Mechanical Equipments, Cladded Line pipes and Fittings, which able to interpret international Standard such as ASME, API, ASTM, AWS, DNV-OS-F-101, DS-1, ISO, ABS & ANSI, Client Specification, Work Procedures, Isometric Drawing, P&ID Drawing, Understand of Work Sequence for both Fabrication and installation including pre-Commissioning. Work Under Pressure, Flexible on duties to perform accepted works, Work well as a team player or single either, Have strong Supervision skill, Inspection skill, Technical Problem Solving with high safety standard, being professional in work displaying in integrity at all time. Proficient Quality Control Inspector adept at completing both destructive and non-destructive testing of materials and finished products. Versed in documentation and reporting as well as process improvements. Over 15 years of experience in Oil & Gas environments supporting quality improvements and reducing errors.

Overview

26
years of professional experience
3
years of post-secondary education
9
Certifications
3
Languages

Work History

APAVE TIV ASIA (Formerly ABSG Consulting)

QA/QC Inspector(Baker Hughes Representative)
04.2024 - 06.2024

Job overview

  • Supported continuous improvement initiatives by providing expert recommendations on quality control procedures.
  • Conducted root cause analysis on recurring defects, enabling targeted improvements to prevent future occurrences.
  • Maintained accurate records of inspection results, providing valuable data for process improvement initiatives.
  • Coordinated with suppliers to establish clear expectations regarding material quality and adherence to specifications, minimizing potential disruptions in production due to substandard materials received from vendors.
  • Perform Pipe Line & Fitting Fabrication monitoring as per schedule and advice to achieve the target date.
  • Perform Witness of UT Gauging Thickness of Pipe Line and Fitting Prior to Weld Overlay
  • Perform Monitoring Cladding process of Pipe Line, Elbow, Blind Flange, Reducing Tee
  • Perform witness of Final Dimensional of Pipe Line, Elbow, Blind Flange, Reducing Tee
  • Perform 100% Final Visual Inspection for Pipe Line, Elbow and Release for Pre-Shipment.
  • Review and sign off for Material Certificate, NDT Report, Welding Report, Dimensional report and Final inspection report, COC.
  • Review Documentation (MRB) and sign off Inspection Release Note.
  • Monitoring Pre-shipment process to ensure for safety during loading and shipment

ABSG Consulting On Behalf KEPPEL SHIPYARD LIMITED

QA/QC & TECHNICAL REPRESENTATIVE
12.2022 - 09.2023

Job overview

  • Oversaw inventory management for replacement parts and equipment, reducing delays in servicing client requests due to stock shortages.
  • Enhanced customer satisfaction by providing timely and effective technical support.
  • Identified opportunities for process improvement within the technical support team, implementing changes that led to increased efficiency.
  • Perform Fabrication monitoring as per schedule and advice to achieve the target date
  • Resolved complex technical issues for clients, resulting in increased product reliability.
  • Handled escalated customer complaints with professionalism and empathy, working collaboratively with clients to devise mutually satisfactory resolutions.
  • Coordinated with engineering teams to report the Drawing issues, contributing to improvements in product quality and performance over time.
  • Played a key role in the successful launch of the products, providing technical support for both Sub-Contractor teams and internal team.
  • Maintained routine communication with clients to assess overall satisfaction, resolve complaints, and promote solutions.
  • Perform Daily Fabrication progress monitoring for Structure, Piping of Chemical Injection Skid and Compressor Skid
  • Perform Mechanical Installation monitoring and advice for any matter of Chemical Injection Skid and Compressor Skid
  • Perform Monitoring Welding process, Final Dimensional witness and NDT witness of Chemical Injection Skid and Compressor Skid
  • Perform Structural Fit up and Welding monitoring of Chemical Injection Skid and Compressor Skid
  • Perform Final Visual of Structure after welding and review document for releasing to Painting.
  • Perform Visual inspection of Stainless steel piping and Carbon steel piping of Chemical Injection Skid and Compressor Skid
  • Demonstrated expertise in interpreting radiographic film images to identify potential flaws in welded joints accurately.
  • Improved welding quality by conducting thorough inspections and recommending corrective actions.
  • Expedited issue resolution with prompt reporting of non-conforming items to relevant parties for corrective action implementation
  • Tested welders for understanding of code and proficiency in different environments.
  • Review Piping test Package of Chemical Injection Skid and Compressor Skid
  • Perform witness and inspection of Pre-Hydrostatic test Line-walk of Chemical Injection Skid and Compressor Skid
  • Perform Witness Hydrostatic test for Stainless steel and Carbon steel piping of Chemical Injection Skid and Compressor Skid
  • Perform Witness and inspection of Reinstatement and flange management of Pipe Line system of Chemical Injection Skid and Compressor Skid
  • Perform Review on Painting Procedure and Blaster painter Qualification as per ASME D4228
  • Perform visual Inspection for Blasting and Painting of Chemical Injection Skid and Compressor Skid
  • Perform Electrical & Instrument Installation Monitoring and comments if any of Chemical Injection Skid and Compressor Skid
  • Perform Witness of Electrical and Instrument Function Test (FAT) of Chemical Injection Skid and Compressor Skid
  • Perform Final Inspection of Electrical and Instrument Installation of Chemical Injection Skid and Compressor Skid
  • Perform Witness of Insulation and continuity testing of cables of Chemical Injection Skid and Compressor Skid
  • Perform of Visual inspection for complete and correct installation of all electrical and instruments package of Chemical Injection Skid and Compressor Skid
  • Perform Final Closing Punch list,
  • Perform Final Inspection and Release for Chemical Injection Skid with Client and Contractor and Third Party.
  • Perform Final Inspection and Final Release of Compressor Skid with Client and Contractor and Third Party.
  • Perform Final Inspection of Monorail Structure and Release for Shipment of Compressor Skid
  • Perform Final Inspection of Spreader Bar and Release for Shipment of Compressor Skid
  • Perform Witness Mechanical Tank, Vessel, and Pump Installation of Compressor Skid
  • Perform Witnessing of Mechanical equipment testing, Pump Alignment of Chemical Injection Skid and Compressor Skid
  • Perform MDR Review,
  • Monitoring Pre-shipment process to ensure for safety during loading and shipment

Project Involved:

Petrobrass- FPSO- P78 Buzios field Area Development Project at PT.VME Batam, Indonesia

ABSG Consulting On Behalf Of BAKER HUGHES & CUEL LIMITED REPRESENTATIVE

QA/QC & TECHNICAL REPRESENTATIVE
08.2022 - 04.2023

Job overview

  • Coordinated with engineering teams to report technical issues, contributing to improvements in product quality and performance over time.
  • Established rapport with clients through regular check-ins, ensuring their ongoing satisfaction with products and services provided.
  • Played key role in successful completed project, providing technical support for both internal teams and external customers.
  • Handled escalated customer complaints with professionalism and empathy, working collaboratively with clients to devise mutually satisfactory resolutions.
  • Resolved complex technical issues for clients, resulting in increased product reliability.
  • Clarified customer requests, forwarded product information and answered questions to support sales operations.
  • Perform Fabrication monitoring as per schedule and advice to achieve target date
  • Perform Witness of UT Gauging Thickness Prior to Weld Overlay
  • Perform Monitoring Cladding process of Elbow, Blind Flange, Reducing Tee
  • Perform witness of Final Dimensional of Elbow, Blind Flange, Reducing Tee
  • Perform Final Visual Inspection for Elbow, Blind Flange, Reducing Tee after Cladding and
  • Perform visual inspection of Elbow, Blind Flange, Reducing Tee after Painting
  • Release Elbow, Blind Flange, and Reducing Tee for shipment.
  • Review and sign off for Material Certificate, NDT Report, Welding Report, Dimensional report and Final inspection report.
  • Review Documentation (MRB) and sign off Inspection Release Note.
  • Monitoring Pre-shipment process to ensure for safety during loading and shipment

Project Involved:

Petrobrass – Marlim Project at PT.Cladtek Bi-Manufacturing Batam, Indonesia

CUEL Limited - CVX2215V Blind Flange Fabrication for AR PL Disconnect (10” & 16” Blind Flange)

INEOS LTD

QC INSPECTOR (OWNER REPRESENTATIVE)
06.2022 - 08.2022

Job overview

  • Perform vendor surveillance inspection at vendor site throughout all phases of the project to ensure supplier and project quality objectives are being achieved
  • Conducted final inspections on completed products prior to shipment, ensuring customer satisfaction with delivered goods.
  • Ensured compliance with industry standards by performing regular audits of manufacturing processes.
  • Reduced defects and waste by implementing effective corrective actions in response to inspection findings.
  • Material Inspection
  • Dimensional witness, Fit-up, Monitoring Welding proses
  • Visual for Super Duplex Piping, Stainless steel piping and Carbon steel piping
  • Piping Erection & Installation
  • Witnessed Hydrotest
  • Blasting Painting Inspection
  • Final Closing Punch list
  • MDR Review and raise MDR Review comments list and sent to Supplier for addressing the comments accordingly.
  • Participated in cross-functional teams to resolve complex quality issues and drive process improvements throughout the organization.
  • Conducted root cause analysis on recurring defects, enabling targeted improvements to prevent future occurrences.
  • Coordinated with suppliers to establish clear expectations regarding material quality and adherence to specifications, minimizing potential disruptions in production due to substandard materials received from vendors.

Project Involved:

New Energy Plant Project

REPSOL GROUP

QAQC SPECIALIST
02.2020 - 06.2022

Job overview


  • Perform an inspection or witness visual inspection of Drilling Equipment
  • Oversaw daily operations of a busy office environment, ensuring tasks were completed efficiently and accurately.
  • Collaborated with cross-functional teams to achieve project goals on time and within budget.
  • Improved customer satisfaction rates through proactive problem-solving and efficient complaint resolution.
  • Listened and responded to customer requests and forwarded necessary information to superiors.
  • Followed all company policies and procedures to deliver quality work.
  • Cultivated positive relationships with vendors to deliver timely and cost-effective supply of services and materials.
  • Witness of Hydrotest
  • Witness of subsea equipment assemblies, Wellhead, Christmas tree, Tubing spool, Check valve, Tool Lubricator
  • Witness of NDE such as MPI Blacklight, UT wall Thickness
  • Dimensional check
  • Witness of Welding and PWHT for Large tubular
  • Witness of Thread inspection, Drifting, Buck On pipe and Casing Hanger/Wellhead, on behalf of Repsol in vendor facilities as per Notification with reference to API 17D, DS-1, API 6A
  • Final Painting Inspection
  • Frequently inspected production area to verify proper equipment operation.
  • Final Stencil/Marking and
  • Pre-shipment Inspection
  • Generated reports detailing findings and recommendations.
  • Evaluated customer needs and feedback to drive product and service improvements.


Project involved:

  • Repsol Indonesia- Drilling equipment, OCTG (at PT
  • Hydrill/tenaris, Baker Hughes, PT
  • TELAGA Mas Mulia)
  • Repsol Mexico – Casing hanger/Pup Joint, Wellhead Housing, Welding of TWE and Pipe and HP (at PT.Baker Hughes, Tenaris)
  • Repsol Norway – Casing, , HP/LP pup joint, Subsea drilling equipment
  • (Baker Hughes, Tenaris)
  • Repsol Indonesia - (witness for FOSV NSD SUB), KS Drilling (witness for Chicksan, High Pressure Pup, Check valve, Tee etc) , Large Tubular Welding, Repair, NDT Inspection and Stencil marking, etc.( at Nov Jakarta, Addrilltech Jakarta)
  • Repsol Indonesia –Christmas tree, Check Valve, Running Tool, Tubing Spool, Tool Lubricator, Witness NDE, Drift, Dimensional, Etc
  • (At WEIR/SPM Oil&Gas)
  • Repsol Indonesia – Drilling Jar/Intensifier at NOV Jar, Tangerang

VOPAK TERMINAL MERAK

TANKAGE MECHANICAL & QA/Lead QC Inspector
10.2018 - 02.2020

Job overview

  • Developed reusable test scripts for efficient execution across multiple platforms and environments.
  • Conducted root cause analysis on recurring defects, implementing preventative measures to reduce future occurrences.
  • Improved customer satisfaction with thorough validation of user requirements during the testing process.
  • Mentored junior team members, fostering growth and enhancing team performance.
  • Streamlined QA processes for improved efficiency, reducing project completion time.
  • Identified critical defects through rigorous testing, resulting in a more stable product release.
  • Managed multiple projects simultaneously, ensuring timely delivery of high-quality products.
  • Led cross-functional teams to ensure seamless collaboration in achieving project goals.
  • Report technically to company nominated Project Manager and be responsible for all QA/QC.
  • Responsible for co-ordination of technical areas and co-ordination with other discipline specialists where areas interface or overlap.
  • Develop / Review / Implement Quality Control Documents, Quality Manuals, Quality Plans, Procedures, Method Statements, Inspection and Test Plans.
  • Preparing/review/approval of Quality Plans, Inspection and Test Plans, Procedures and Method Statements for self-performed work, sub-contractors, suppliers
  • Review/approval of Welding Procedure Specifications, Procedure Qualification Records and Welder Qualifications for sub-contractors.
  • Responsible for overseeing all QA/QC activities of EPC Contractors
  • · Interpret Project specifications, Applicable International codes, and standards to ensure these requirements are included in those documents and are implemented during project execution. Approve/Review WPS, PQR, and QC Dossiers; Witness and Approve the Welder qualification tests and Welding Procedure Qualification as applicable.
  • Review and Approve project material certification
  • Supervise EPC contractor QC personnel
  • Monitoring Blasting and Painting process and quality of Plate Material in vendor workshop.
  • · Supervise /Witness/ Approve field Inspection activities of EPC Contractors and Third-party Inspection agencies like NDE & Hydro test.
  • Perform witness of Tank Inspection for shell, roof, bottom, structural platform, etc.
  • Perform witness of Rotating Equipment check, levelling, shaft alignment, final Alignment, Motor solo run test, etc
  • Witnessing of Truck Loading Arm Mobility test,
  • Check and Witness fit up-Welding and final visual of Super Duplex material UNS32760 for Seawater line
  • Check and Witness fit-up – welding and final visual of Stainless steel E316L pipe
  • Piping Line Check as per test package, witness Hydrotest for Piping.
  • Perform Witness of Welding and Final Visual of Pressure vessel
  • Witness of Air blowing/Flushing after pipe Hydrotest
  • Final Internal and External Cleaning Inspection of Tanks with Third Party and Contractor.
  • Supervision and Inspection of Blasting and Painting activities.
  • Ensure all documents and reports are as per required in ITP

Project Involved:

Sambu II Expansion Project (new build 14 Nos of Petrochemical Storage Tank) at PT.Vopak Terminal Merak, Indonesia

KAWASAKI HEAVY INDUSTRY LTD

MECHANICAL INSPECTOR AND EXPEDITOR
08.2018 - 09.2018

Job overview

  • Report technically to company nominated Project Manager and be responsible for all QA/QC
  • Developed strong relationships with vendors, facilitating quick resolution of any discrepancies found during inspections or warranty claims processing.
  • Supported inspectors during high-stakes projects, gaining valuable experience in advanced techniques and complex equipment inspections.
  • Saved company resources by identifying cost-effective repair solutions without compromising the integrity of mechanical systems.
  • Responsible for co-ordination of technical areas and co-ordination with other discipline specialists where areas interface or overlap
  • Coordinating and actively facilitate Subcontractor, Client and Company during clarifying and resolving issues
  • Upheld stringent quality control standards by meticulously documenting all inspection findings, ensuring accurate and reliable data for future reference.
  • Expedited project timelines with efficient scheduling and coordination of mechanical inspection activities among team members.
  • Contributed to a positive work environment by fostering open communication channels between technicians, engineers, and management regarding equipment performance and maintenance needs.
  • Played a key role in the successful completion of large-scale projects by diligently inspecting all critical components for defects or irregularities prior to installation.
  • Enhanced workplace safety by implementing strict inspection protocols and ensuring all mechanical systems adhered to industry standards.
  • Responsible for overseeing all QA/QC activities of EPC Contractors
  • Interpret Project specifications, Applicable International codes, and standards to ensure these requirements are included in those documents and are implemented during project execution
  • Approve/Review WPS, PQR, and QC Dossiers; Witness and Approve the Welder qualification tests and Welding Procedure Qualification as applicable
  • Review and Approve project material certification
  • Supervise EPC contractor QC personnel
  • Monitoring Blasting and Painting process and quality in vendor workshop
  • Supervise /Witness/ Approve field Inspection activities of EPC Contractors and Third-party Inspection agencies such as NDE & Hydro test
  • Control quality affair of Mechanical fabrication works in cooperation with Subcontractor’s QAQC Inspector
  • Supervise the Mechanical’s assembling works to carry out as per relevant drawing
  • Dimensional and Visual inspection of Structural Pipe Rack, Bridge, and other Mechanical items
  • Expedite/Monitoring/coordinate fabrication activity in respect of Site’s construction schedule
  • Checked color, shape, texture and grade of products and materials against established templates, charts, and samples.
  • Final Painting Inspection
  • Communicate with the Subcontractors to ensure target date are achieved as planned
  • Weighed products prior to shipment to confirm accuracy.
  • Examined products for imperfections and defects.
  • Monitored product quality at all stages of production process.
  • Provided feedback to production team regarding product quality.
  • Improved delivery times by closely monitoring and prioritizing urgent orders.
  • Developed strong relationships with vendors, negotiating favorable terms for the company.
  • Boosted customer satisfaction by resolving issues promptly and providing regular updates on order status.
  • Collaborated with suppliers for timely delivery, minimizing production delays.
  • Update daily progress and Report to Project Manager

Project Involved:

P3FH (Ferronickel Plant Project) – Gresik-Surabaya

KAWASAKI HEAVY INDUSTRY-LAING O’ROURKE AUSTRALIA

QA/QC TANK ENGINEER
02.2017 - 05.2018

Job overview

  • Control quality affair of construction works in cooperation with Site QA/QC Manager and another Mechanical Engineer
  • Monitoring/coordinate Construction activity in respect of construction schedule and quality control requirement
  • Supervise the assembling/erection works are carried out as per relevant drawings and method statements in Quality perspective
  • Communicate with the Subcontractors to ensure target date installation/completion of Tank component are achieved as planned
  • Interface with Contractor to ensure witness and hold points are notified for inspection
  • Liaise and communicate with client for any issues or any discrepancies to the Procedure
  • Review the NDT Report, Welding Report, Insulation Report, and sign off to submit to Client
  • Perform Blasting and painting process at vendor workshop and at site prior to final inspection with client
  • Perform the Inspection Insulation Blanket, Glass cloth and Glass wool, and submit the Notification of Inspection to the Clients for Walkdown
  • Dimensional inspection for Tank roundness
  • Conducting and witnessing Tank Hydrotest, Pneumatic Test, PRV/VRV Leak Test, and make the Test report and submit it to the Client
  • Update daily Progress report and submit to QC Manager
  • Ensure that all Documentations complete and submitted for Client’s approval.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Provided input to team lead regarding areas for process and procedural improvement.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Verified construction documentation to meet client requirements and vision.
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
  • Developed comprehensive engineering documents for all projects.

Kawasaki Heavy Industry-Laing O’Rourke AUSTRALIA

Mechanical & Welding Inspector
06.2015 - 02.2017

Job overview

  • Review the installation requirements of the tank drawings and related method statements
  • Facilitated communication between production and quality departments to ensure timely resolution of issues affecting product quality or schedule.
  • Verify proper materials are used as per specifications and drawings
  • Witness the PQR and WQT
  • Collaborated with welders to provide guidance on proper techniques and materials for optimal results.
  • Conducted visual inspections of welded joints using various tools such as magnifying glasses, mirrors, or videoscopes for accurate assessments.
  • Validate/check competencies and skills of engaged workforce
  • Improved welding quality by conducting thorough inspections and recommending corrective actions.
  • Expedited issue resolution with prompt reporting of non-conforming items to relevant parties for corrective action implementation.
  • Control measuring, inspection, examination and test devices and instruments
  • Maintain construction/inspection Records
  • Maintained accurate inspection records for future reference and quality control purposes.
  • Enhanced project efficiency by ensuring adherence to welding codes, standards, and project specifications.
  • Implement proper action for Non-conformity relative to site construction work
  • Carry out inspections for Cryogenics LNG Tank and LPG Tank such as structural Steel Erection and bolting, Witnessing Fit up and Visual Inspection on the Structural Pre-Assembly, Plate Assembly, Nozzles, Bottom Vapor Barrier, Wall vapor Barrier, Nickel Inner Shell Plate Vertical and Horizontal Welding Inspection, Inspection of Peaking and Banding of Shell, Stiffener, Suspended Deck
  • Witnessing of Mechanical Installation such as witnessing Bolting tensioning, SFT Test, Monorail inspection for the Propane and Butane Tank, Witnessing NCR Closing, Inspection by using of Swing Stage Scaffolds, EWP and AVW Machine, etc
  • Check and Witness fit up-Welding and final visual of Super Duplex material UNS32760 for storage tanks ( Fire water line, sea water line)
  • Verify that the works are in accordance with Inspection and Test Plans
  • Liaise with client inspection personnel and provide forty-eight (48) hrs notice of Witness and Hold point activities as required by specifications and ITP, Sign it off for further process
  • Coordinate with NDT Team for the NDT Request, coordinate with the Construction for any repair observed during NDT Examination’s witnessing
  • Make Daily Welding Report for all welding and inspection activity
  • Prepare Documentation for Mechanical Completion and for Handover purpose
  • Report to the QA QC Manager.

ABSG Consulting On Behalf Of PT.Mitsui & BHGE

QA/QC & Technical Representative
09.2014 - 06.2015

Job overview

  • Handled escalated customer complaints with professionalism and empathy, working collaboratively with clients to devise mutually satisfactory resolutions.
  • Coordinated with engineering teams to report issues, contributing to improvements in product quality and performance over time.
  • Resolved complex technical issues for clients, resulting in increased product reliability.
  • Managed high-profile accounts, delivering exceptional service and fostering long-term client relationships.
  • Enhanced customer satisfaction by providing timely and effective technical support.
  • Collaborated with cross-functional teams to develop innovative solutions for customer problems.
  • Witness the process of Weld Overlay Cladding of 10” pipe, 6” pipe, and 4” pipe,
  • Visual inspection of Weld overlay pipe surface after cladding using Borescope camera,
  • Witnessing UT Lamination and Disbonding, Witnessing Water washable dye penetrant of Cladded Pipe,
  • Witnessing Auto Hydrostatic test of Cladded pipe, and Witnessing Solvent penetrant after machining of pipe ends.
  • Review MDR and supporting Document of Piping, Wellhead, Casing Hanger, Connector, Box & Pin, HP/LP Housing part etc from Supplier/vendor,
  • Visual Inspection of Material for Piping, Wellhead, Casing Hanger, Connector, Box & Pin, HP/LP Housing part etc from Supplier/vendor,
  • Final Inspection of Piping, Wellhead, Casing Hanger, Connector, Box & Pin, HP/LP Housing part etc from Supplier/vendor before release for shipment,
  • Painting inspection if any,
  • Endorse for Authorization of shipment to Supplier / vendor after screening all document, and verify actual parts Refers to API 17D, API 6A
  • Reporting to Client and Project Manager

Project:

-Bangka Subsea Installation Project on Behalf Mitsui at PT. Cladtek BI Metal Batam

-Various Project, Acting as Gate Control Inspection at PT.GE Oil & Gas Batam

Lloyd’s Register Asia

QA/QC Owner Representative
09.2013 - 04.2014

Job overview

  • Review WPS and Qualification records
  • Increased customer satisfaction by implementing efficient business processes and providing exceptional service.
  • Established a positive workplace culture that fostered employee engagement, collaboration, and loyalty.
  • Witnessing the Dimensional inspection, final visual inspection of Cold Shoe Assemblies
  • Oversaw daily operations, ensuring all tasks were completed accurately and efficiently by team members.
  • Assessed damaged materials and notified maintenance personnel of needed repairs.
  • Conducted audit inspections and independent checks to verify parts and materials.
  • Reported issues to higher management with great detail.
  • Verify Hot Dip Galvanize acceptability with reference ASTM 123
  • Visual inspection including Marking/tag number of component supports
  • Witnessing Final product, documentation, components support mark/tag number and release inspection
  • Check packaging correct & despatch to packaging area for packing
  • Check that Manufacturer’s Data Report is correctly compiled
  • Expedite the production schedule to meet an initial plan as agreed formerly
  • Communicated with clients and customers to gather, provide and share updated information on products and services.
  • Handled customer complaints quickly and professionally to restore customer confidence and prevent loss of business.
  • Generated reports detailing findings and recommendations.

Global Processing System

QA/QC Piping & Mechanical Inspector ( Client Representative)
05.2013 - 09.2013

Job overview

  • Perform vendor surveillance inspection in Singapore and Batam’s vendor site throughout all phases of the project to ensure supplier and project quality objectives are being achieved
  • Material Inspection, Dimensional witness, Fit-up, Monitoring Welding proses,
  • Contributed to a positive work environment by fostering open communication channels between technicians, engineers, and management regarding equipment performance and maintenance needs.
  • Assisted colleagues in troubleshooting complex technical problems encountered during the course of routine inspections, fostering a collaborative and supportive work atmosphere.
  • Increased overall equipment reliability through meticulous attention to detail during inspections and diligent follow-up on necessary repairs.
  • Visual for Super Duplex Piping, Stainless steel piping and Carbon steel piping, Piping Erection & Installation, Hydrotest witness, PWHT
  • Blasting Painting Inspection
  • 10 Ea of Pressure vessel fabrication Inspection,
  • 1 Ea Chemical Injection Tank Fabrication Inspection
  • Witnessing Pump Installation, Pump Alignments on the Chemical Injection Skid
  • Final Closing Punch list
  • Developed strong relationships with vendors, facilitating quick resolution of any discrepancies found during inspections or warranty claims processing.
  • Upheld stringent quality control standards by meticulously documenting all inspection findings, ensuring accurate and reliable data for future reference.
  • Investigated customer complaints to take necessary corrective actions.
  • Examined products for imperfections and defects.
  • Provided feedback to production team regarding product quality.
  • MDR Review
  • Expediting, ensure all QAQC / NDE records are signed-off on a progressive basis and maintained
  • Final Inspection prior to load out, Reporting to group Manager and QA/QC Project Manager

Project: FPSO Topside Module for Petrovietnam - Gas Lift Pressure Upgrading Project-Cairn Energy India (Pressure vessel fabricating)

Germanischer Lloyd Noble Denton

Third Party QA/QC Mechanical & Welding Inspector
04.2012 - 09.2012

Job overview

  • Perform vendor surveillance inspection throughout all phases of the project to ensure supplier and project quality objectives are being achieved
  • Expedited issue resolution with prompt reporting of non-conforming items to relevant parties for corrective action implementation.
  • Performing of Material Inspection ( Fabrication Material and Offshore Material)
  • Ensured safety compliance with regular audits of equipment and work areas.
  • Optimized workflow efficiency by reviewing blueprints and ensuring alignment with project requirements before commencing work.
  • Enhanced project efficiency by ensuring adherence to welding codes, standards, and project specifications.
  • Performing of Pipe and Structural Dimensional witness
  • Fit-up, Monitoring daily Welding process to ensure compliant with the Welding Procedure and requirements.
  • Perform Welding Visual, ensure all QAQC / NDE records are signed-off on a progressive basis and maintained
  • Inspection of GRVE Lamination joint
  • Conducted visual inspections of welded joints using various tools such as magnifying glasses, mirrors, or videoscopes for accurate assessments.
  • Demonstrated expertise in interpreting radiographic film images to identify potential flaws in welded joints accurately.
  • Examined products for imperfections and defects.
  • Inspection of Adhesive Joints
  • Witnessing GRVE pipe Hydrostatic test
  • Review Hydrostatic Package
  • Line check prior to Hydrostatic test and raise punch list if any
  • Witnessing Hydrostatic test, piping Flushing/Blowing
  • Witnessing of Mechanical equipment testing, Overhead Crane Lift test, Pump Alignment, HVAC Inspection, PACU Inspection, Start up and test witnessing
  • Followed safety protocols while handling hazardous materials.
  • Inspection for Punchlist clearance
  • Investigated customer complaints to take necessary corrective actions.
  • Monitored product quality at all stages of production process.
  • Review the Test Pack
  • Final Inspection
  • MDR Review and sign off
  • Expediting the project progress as per project plan, Daily report to the Team leader regarding the activities and Progress

Project Involved:

Abu Dhabi Crude Oil Project (ADCO PROJECT)

Germanischer Lloyd Noble Denton

Third Party QA/QC Inspector
09.2011 - 03.2012

Job overview


  • Perform vendor surveillance inspection throughout all phases of the project to ensure supplier and project quality objectives are being achieved
  • Review the ITP’s, WPS, PQR Witness the Procedure Qualification, Welder Qualification Test
  • Material Inspection, Dimensional witness, Fit-up
  • Provide early warning of potential quality problems and report areas of concern to the Inspection Coordinator for action
  • Monitoring Piping and Subsea Structure Welding process
  • Performs Welding Visual inspection, ensure all QAQC / NDE records are signed-off on a progressive basis and maintained
  • Review Radiographic film, Witness DP & MT test
  • Inspection for Galvanizing and Painting of steel structure
  • Witness of Heat Shrinkage Sleeves Installation
  • Witness of Holiday test
  • Review Hydrostatic Package, Line check prior to Hydrostatic test, Witnessing Hydrostatic test
  • MDR Review and endorsement
  • Final Inspection, Pre-load out inspection and expediting
  • Witnessing of Mechanical equipment testing such as Valve testing
  • Raise the Inspection Release Note for the MRB
  • Daily report to the Project Manager regarding the Contractor’s activities and progress

Project : Iraq Crude Oil Export Expansion Project (ICOEEP Project)

Murray & Robert Australia

QC Site Inspector
06.2011 - 09.2011

Job overview

  • Assist the Inspection Coordinator to ensure project quality objectives are achieved
  • Ensure that competent and certified tradesmen are used to carry out the work
  • Ensured adherence to local, state, and federal regulations through diligent inspection of construction sites.
  • Perform surveillance inspection throughout all phases of the project to ensure supplier and project quality objectives are being achieved
  • Verify that NDT inspections are carried out appropriately by qualified personnel and that project required records are maintained including sample review radiographs film as required
  • Verify NDT and welding records are all cleared prior hydro-testing of piping systems
  • Produce reports giving status of Inspection as requested
  • Provide early warning of potential quality problems and report areas of concern to the Inspection Coordinator for action
  • Coordinate with the construction team during installation and hook-up to ensure the correct key activities can be witnessed and recorded
  • Ensure approved testing procedures are in place and verify all tests are carried out by suitably qualified personnel
  • Ensure all QAQC / NDE records are signed-off on a progressive basis and maintained
  • Witness on WPS Qual, Welder Qual, Mock Up test,
  • Performing Line Check inspection,
  • Ensure timely close out of final dossier,
  • Review NDE Report and sign off or feedback to Contractor for any Defect or flaws observed.
  • Compiling document required for MDRs, Final Review MDRs for Fender Repairs
  • Completed inspections of current construction, refurbishment and repair projects.
  • Improved project efficiency by effectively communicating inspection findings to relevant parties.

Project: Gorgon Project- Chevron

PT. Citra Tubindo Engineering Batam

QA/QC Inspector
03.2011 - 06.2011

Job overview

  • Witness of welding procedure qualification test (WPS),
  • Conduct the welder test prior to start the fabrication activities,
  • Witness of Repair WPS and Welder Test,
  • Material verification (heat number and identification comply to certificate) and check the material condition is free from damage,
  • Witness Dimensional, check fit up and joint preparation as per approved WPS such as misalignment, root gap and bevel angle,
  • Daily inspection activities, make sure pre-heat implementation as per WPS, check and correct consumable used, correct WPS used, correct welder qualification for welding,
  • Perform visual inspection for complete welding, the welding is free from crack, distortion and meet the client specification and acceptance criteria,
  • Arrange the NDT requirement as per Weld Map, Review NDT result that performed by NDE Company,
  • Coordinate with client for Final Inspection,
  • Prepare Manufacturing data Reports, Compile Fabrication data and NDE reports for MDR purpose.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Resolved problems, improved operations and provided exceptional service.
  • Excellent communication skills, both verbal and written.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Organized and detail-oriented with a strong work ethic.
  • Report to QA/QC Manager

Project Involved - Gorgon Project – Barrow Island LNG Plant (Headstock Fab & Fender Repair)

PT.Bakrie Constructions

Welding Inspector
01.2011 - 03.2011

Job overview

  • Facilitated communication between production and quality departments to ensure timely resolution of issues affecting product quality or schedule.
  • Check the Welding preparation as per Specifications and Drawing,
  • Enhanced project efficiency by ensuring adherence to welding codes, standards, and project specifications.
  • Improved welding quality by conducting thorough inspections and recommending corrective actions.
  • Expedited issue resolution with prompt reporting of non-conforming items to relevant parties for corrective action implementation.
  • Collaborated with third-party inspection agencies to ensure seamless coordination of activities and timely completion of required tests.
  • Ensured safety compliance with regular audits of equipment and work areas.
  • Examined products for imperfections and defects.
  • Check Welding Condition during Welding and after welding and comments if any otherwise release for NDT
  • Coordinate with NDT team for NDT process,
  • Coordinate with client for Final Inspection
  • Report to QA/QC Coordinator

Project involved:

-Merak Debottlenecking Project EPCM – CABOT Corporation

- LGL Million Ounce Plant Upgrade (MOPU) – LIHIR GOLDEN LIMITED (LGL)

- Rise Base - Kangean

Chiyoda Technip Joint venture Company

Completion Engineer
01.2010 - 05.2010

Job overview


  • Monitor and coordinate with the disciplines for clearing punch activities on system basis,
  • Create the report and trend graphics of each discipline refers to data from WinPCS,
  • Handling the Punch List and Turnover activities using the Project Completion and Certification Tracking System WinPCS (Windows Project Completion System)
  • Coordinate with disciplines to obtain System Definition Drawings, prepare them for official Submission, and monitor their status, get the System component lists populated in WinPCS
  • Coordinating the discipline and QC department to complete the A Check Sheets (Sign off forms confirming the Construction completion of components or Systems) with refers to the ITP
  • Coordinate with PMC (Pre-Mechanical Completion) team to complete the B Check Sheets (Sign off forms Confirming the completion of the Required Pre-commissioning Test of components or Systems,
  • Evaluate the Discipline Punch Lists for (Punch Category, estimated period to clear the Punchlist, etc.),
  • Control Punchlist Items clearance on WinPCS and Issue DCC/SMCC as if the entire Requirement fulfilled
  • Project involved: QatarGas 3&4 LNG Onshore Project– QCS Project
  • Dates

Rotary Engineering Limited

Piping Engineer
01.2009 - 12.2009

Job overview

  • Assist the Project Superintendent and clients Construction Manager to ensure project quality and Schedule objectives are achieved
  • Contributed to successful project completions by coordinating closely with construction teams, providing on-site support as needed.
  • Lead the FSI Team (Flawless Start up Initiative) for application and monitoring the application of FSI rules in fabrication shop, yard and Laydown area
  • Presented technical findings at conferences or client meetings clearly articulating recommendations supported by sound engineering principles for improved understanding among all stakeholders involved.
  • Conduct the training for engineers for the FSI Rules and it’s activity
  • Involve and responsible for overall Steam Line area and PWHT Localize Spool
  • Control and Monitor pipe spool movement for ensuring the shipment could be done as per schedule (Deliver to site)
  • Manage and associate with all engineer due to Client’s requisition(for urgent items), Provides leadership, manage for the shipment Documentation and Engineering section
  • Clearance the Test Pack / punch list raised by client, Line Check, Ensure for the Completion and clearance in accordance P&ID and Isometrics Drawing)
  • Coordinate with Material Engineer due to any lack of material need to clear the punch list refers to P&ID and Isometrics Drawing
  • Raise the TQ due to any improper or out of control condition on material to complete the Piping Installation
  • Arrange manpower to clear the punch list as per schedule required by Clients
  • Apply the PTW
  • Completing and check Line’s Instruments (mechanical) refers to Client’s Walk down, Verification the Test Pack for Painting Department
  • Trace the Subsystem line, and arrange manpower to clear the Line’s Painting
  • Coordinate with Client’s Inspector for the Line Painting Check, and Investigates any specific problem areas and ensures follow-up for solutions
  • Project involved: Fabrication of Pipe Spool for MEG Project in Rotary Engineering Indonesia, Batam – Indonesia
  • Installation, Line Check and Test Pack Clearance in SHELL-MEG Refinery - Singapore

Rotary Engineering Limited

Welding Inspector
1 2008 - 12.2008

Job overview

Main activities and responsibilities

  • Enhanced project efficiency by ensuring adherence to welding codes, standards, and project specifications.
  • Prepare WPS, Witness Welder Qualification Test,
  • Conducted visual inspections of welded joints using various tools such as magnifying glasses, mirrors, or videoscopes for accurate assessments.
  • Inspection prior to Heat Treatment, Review Non Destructive Examination Procedure, Spot check Welding Examination,
  • Prepare Manufacture Data Report (MDR), Material review against Certificate, Test coupon, Dimension, Heat numbers,),
  • Prepare document and Radiography film for Third party, Arrange radiography film and send to Client(Singapore)

Project involved: SHELL-MEG Project Batam, Indonesia & Singapore


Mexter Technology SDN.Bhd, Solectron Technology

Sales & Service Engineer
05.2004 - 01.2008

Job overview

Main activities and responsibilities

  • Provide technical support for system implementation and maintenance, Troubleshooting Software, hardware problem, Responsible for Software/Hardware installation and dismantling in Production site
  • Report all the software/hardware issues, Provide the on–site or on-call standby support on 24 hours basis including of weekend, Pre-Sales and investigate for the new Customers

Project involved: Hitachi Project at PT.Solectron Technology Indonesia

NIITAKAYAMA PTE.Ltd

Technician
10.2000 - 10.2003

Job overview

Main activities and responsibilities

  • Ensure that the fabrication achieved the daily target and for shipment either
  • Prepare for change model or new machine set up,
  • Prepare for preventive maintenance schedule & Implementation,
  • Preparation in case of internal and external audit of independent agency,
  • Operate Welding Operator using automatic Welding robot,
  • Implement the production monthly inventory.

PT. ASAHI ELECTRONICS BATAM

PRODUCTION Supervisor
01.1999 - 04.2000

Job overview

Main activities and responsibilities

  • Contributed to continuous improvement efforts by identifying opportunities for process enhancements and recommending appropriate solutions for implementation.
  • Arrange the production schedule,
  • Ensure that the production is achieve the daily target and Shipment as per schedule,
  • Evaluated employee performance regularly against established benchmarks for ongoing personnel development.
  • Control manpower (Attendance and quality of work),
  • Prepare for change model or new machine set up,
  • Improved product quality by monitoring production processes, conducting inspections, and initiating corrective actions as needed.
  • Created an inclusive work culture that encouraged collaboration and open communication among staff members at all levels within the organization.
  • Consistently met or exceeded production targets while maintaining strict quality standards, resulting in increased customer satisfaction.
  • Preparation in case of internal and external audit for ISO Certification,
  • Implement the production monthly inventory

Nusantara Aircraft Industry, Ltd

QC Tehcnician
03.1998 - 05.1998

Job overview

  • Contributed to customer satisfaction by promptly addressing quality-related issues, resolving complaints, and providing technical support as needed.
  • Documented quality control procedures and record-keeping practices, ensuring a comprehensive archive of data for future reference and analysis.
  • Minimized waste generation during testing procedures through proper handling of materials and efficient use of resources.
  • Assisted in achieving company objectives by providing accurate and timely data analysis for continuous improvement efforts.
  • overseeing the implementation of the 5S Lean Methodology system in all areas covered by the program.
  • Making sure that the set standards for the area are followed
  • Motivating and inspiring colleagues to act and improve their workplaces.
  • Report to Manager

Education

Akademi Teknologi Industri Padang
Padang, Indonesia

Associate of Applied Science from Industrial Engineering
08.1995 - 12.1998

University Overview

GPA: 3.2

Skills

ISO standards knowledge

Accomplishments

  • Project Involved DECEMBER 2022 ~ SEPTEMBER 2023
  • ABSG CONSULTING- SINGAPORE
  • QA/QC /TECHNICAL REPRESENTATIVE (KEPPEL SHIPYARD LIMITED REPRESENTATIVE)
  • Perform Daily Fabrication progress monitoring for Structure, Piping of Chemical Injection Skid and Compressor Skid
  • Perform Mechanical Installation monitoring and advice for any matter of Chemical Injection Skid and Compressor Skid
  • Perform Monitoring Welding proses, Final Dimensional witness and NDT witness of Chemical Injection Skid and Compressor Skid
  • Perform Structural Fit up and Welding monitoring of Chemical Injection Skid and Compressor Skid
  • Perform Final Visual of Structure after welding and review document for releasing to Painting
  • Perform Visual inspection of Stainless steel piping and Carbon steel piping of Chemical Injection Skid and Compressor Skid
  • Review Piping test Package of Chemical Injection Skid and Compressor Skid
  • Perform witness and inspection of Pre-Hydrostatic test Line-walk of Chemical Injection Skid and Compressor Skid
  • Perform Witness Hydrostatic test for Stainless steel and Carbon steel piping of Chemical Injection Skid and Compressor Skid
  • Perform Witness and inspection of Reinstatement and flange management of Pipe Line system of Chemical Injection Skid and Compressor Skid
  • Perform Review on Painting Procedure and Blaster painter Qualification as per ASME D4228
  • Perform visual Inspection for Blasting and Painting of Chemical Injection Skid and Compressor Skid
  • Perform Electrical & Instrument Installation Monitoring and comments if any of Chemical Injection Skid and Compressor Skid
  • Perform Witness of Electrical and Instrument Function Test (FAT) of Chemical Injection Skid and Compressor Skid
  • Perform Final Inspection of Electrical and Instrument Installation of Chemical Injection Skid and Compressor Skid
  • Perform Witness of Insulation and continuity testing of cables of Chemical Injection Skid and Compressor Skid
  • Perform of Visual inspection for complete and correct installation of all electrical and instruments package of Chemical Injection Skid and Compressor Skid
  • Perform Final Closing Punch list
  • Perform Final Inspection and Release for Chemical Injection Skid
  • Perform Final Inspection and Final Release of Compressor Skid for Shipment
  • Perform Final Inspection of Monorail Structure and Release for Shipment of Compressor Skid
  • Perform Final Inspection of Spreader Bar and Release for Shipment of Compressor Skid
  • Perform Witness Mechanical Tank, Vessel, and Pump Installation of Compressor Skid
  • Perform Witnessing of Mechanical equipment testing, Pump Alignment of Chemical Injection Skid and Compressor Skid
  • Perform MDR Review
  • PETROBRAS- FPSO- P78 BUZIOS FIELD AREA DEVELOPMENT PROJECT AT PT.VME BATAM, INDONESIA
  • AUGUST 2022 ~ APRIL 2023

Additional Information

  • 22 YEARS IN SEVERAL INDUSTRY SUCH AS MANUFACTURING COMPANY
  • AUTOMOTIVE SOFTWARE AND HARDWARE PROVIDER COMPANY. OIL & GAS CONSTRUCTION PLANT, QUALITY CONTROL, LINE INSPECTION, FABRICATION, ERECTION, INSTALLATION OIL AND GAS PIPING REFINERY, FPSO CONSTRUCTION, PRESSURE VESSEL INSPECTION , TANK CONSTRUCTIONS (PIPING & STRUCTURE), TANKS DOCUMENTS REVIEW, TURN OVER WORK AND MECHANICAL COMPLETION WORK. FABRICATION OF PIPING AND STRUCTURE FOR REFINERY NEEDS, PETROCHEMICAL EQUIPMENT AND PLANT WITH STAINLESS STEEL, SUPER DUPLEX, CARBON STEEL, GRVE MATERIAL. WITNESSING DRILLING EQUIPMENT INSPECTION, DEEP SUBSEA PIPE AND STRUCTURAL PRODUCTION LINE INSPECTION, CHRISTMAS TREE INSPECTION, THREADING INSPECTION, OCTG, FISHING TOOL, SUBSEA WELLHEAD EQUIPMENT INSPECTION , CLADDING PIPE AND FITTING INSPECTION, LINER INSPECTION, PAINTING ETC.

Certification

CSWIP 3.2.1 Senior Welding Inspector

Timeline

QA/QC Inspector(Baker Hughes Representative)

APAVE TIV ASIA (Formerly ABSG Consulting)
04.2024 - 06.2024

CSWIP 3.2.1 Senior Welding Inspector

02-2023

QA/QC & TECHNICAL REPRESENTATIVE

ABSG Consulting On Behalf KEPPEL SHIPYARD LIMITED
12.2022 - 09.2023

QA/QC & TECHNICAL REPRESENTATIVE

ABSG Consulting On Behalf Of BAKER HUGHES & CUEL LIMITED REPRESENTATIVE
08.2022 - 04.2023

Radiography Interpreter ASNT Level 2

06-2022

Magnetic Particle Test

06-2022

Penetrant Test

06-2022

QC INSPECTOR (OWNER REPRESENTATIVE)

INEOS LTD
06.2022 - 08.2022

QAQC SPECIALIST

REPSOL GROUP
02.2020 - 06.2022

CSWIP 3.1 Welding Inspector

02-2019

Ultrasonic Test

11-2018

TANKAGE MECHANICAL & QA/Lead QC Inspector

VOPAK TERMINAL MERAK
10.2018 - 02.2020

MECHANICAL INSPECTOR AND EXPEDITOR

KAWASAKI HEAVY INDUSTRY LTD
08.2018 - 09.2018

QA/QC TANK ENGINEER

KAWASAKI HEAVY INDUSTRY-LAING O’ROURKE AUSTRALIA
02.2017 - 05.2018

Mechanical & Welding Inspector

Kawasaki Heavy Industry-Laing O’Rourke AUSTRALIA
06.2015 - 02.2017

QA/QC & Technical Representative

ABSG Consulting On Behalf Of PT.Mitsui & BHGE
09.2014 - 06.2015

QA/QC Owner Representative

Lloyd’s Register Asia
09.2013 - 04.2014

QA/QC Piping & Mechanical Inspector ( Client Representative)

Global Processing System
05.2013 - 09.2013

Third Party QA/QC Mechanical & Welding Inspector

Germanischer Lloyd Noble Denton
04.2012 - 09.2012

Third Party QA/QC Inspector

Germanischer Lloyd Noble Denton
09.2011 - 03.2012

QC Site Inspector

Murray & Robert Australia
06.2011 - 09.2011

QA/QC Inspector

PT. Citra Tubindo Engineering Batam
03.2011 - 06.2011

Welding Inspector

PT.Bakrie Constructions
01.2011 - 03.2011

API 570 Piping Inspector(Attendant)

11-2010

Completion Engineer

Chiyoda Technip Joint venture Company
01.2010 - 05.2010

Piping Engineer

Rotary Engineering Limited
01.2009 - 12.2009

Sales & Service Engineer

Mexter Technology SDN.Bhd, Solectron Technology
05.2004 - 01.2008

Technician

NIITAKAYAMA PTE.Ltd
10.2000 - 10.2003

PRODUCTION Supervisor

PT. ASAHI ELECTRONICS BATAM
01.1999 - 04.2000

QC Tehcnician

Nusantara Aircraft Industry, Ltd
03.1998 - 05.1998

Akademi Teknologi Industri Padang

Associate of Applied Science from Industrial Engineering
08.1995 - 12.1998

Welding Inspector

Rotary Engineering Limited
1 2008 - 12.2008
Mahyouhendra KamilQA/QC Inspector / Technical Representative/Third Party Inspector