Summary
Overview
Work History
Education
Skills
Certification
Training
Disclaimer
Field Practice for thesis
JOB Training
Timeline
AdministrativeAssistant
Marji Purwanto

Marji Purwanto

Field Production Engineer , Familiar With Drilling And Completions Software Landmark’s
Gamping

Summary

Independent, Familiar with Drilling and completions software Landmark’s, computer literate, hard worker, dynamic and persuasive, minimum supervision , excellent communication, marketing and selling skills, fast learning.

Overview

36
36
years of professional experience
1980
1980
years of post-secondary education
4
4
Certifications
1
1
Language

Work History

Field Production Engineer

PT. Bumi Siak Pusako
08.2022 - 08.2025
  • Evaluating inflow and outflow performance between the reservoir and the wellbore.
  • Designing Pump Optimation, design completion systems, including tubing selection, perforating, sand control, matrix stimulation, and hydraulic fracturing.
  • Specify and supervise well modification and stimulation programs to maximize oil recovery.

Familiar With Drilling and Completions Software L

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
04.2007 - 10.2022
  • Oversaw quality control measures throughout completions process, ensuring adherence to industry standards and company guidelines.
  • Implemented innovative technologies to improve completions efficiency and overall performance.
  • Evaluated new completion technologies to determine applicability and potential benefits to existing operations.
  • Enhanced well productivity by implementing strategic completion designs and optimizing operations.

Production Engineer

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
10.2017 - 08.2022
  • Evaluating inflow and outflow performance between the reservoir and the wellbore.
  • Designing Artificial lift by IPR, Designing completion systems, including tubing selection, perforating, sand control, matrix stimulation, and hydraulic fracturing.
  • Specify and supervise well modification and stimulation programs to maximize oil recovery.

Drilling Engineer

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
10.2013 - 10.2017
  • Responsible for planning and executing drilling operations to extract oil, on land.
  • Develops, plans engineering design, costs and supervises the operations necessary for drilling oil and gas wells.
  • Maintain records of drilling report and operations.
  • Responsible for assessing the suitability of new and existing well sites for optimised drilling operations; collecting and analysing data relating to output, daily production and extraction.
  • As well as closely monitoring day-to-day operations, such as drilling and extraction, against budgets, you’ll be preparing work schedules and comprehensive drilling plans to meet project objectives.

Quality Control application Drilling and completions software Landmark’s.

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
02.2010 - 06.2013
  • Quality Control the outputs of aplication drilling & completions software Landmark’s.

Support Engineer application Drilling and Completions software Landmark’s.

PT. Geotech System Indonesia
12.2007 - 01.2010
  • Duties include assisting daily in updating of well plans and survey files, monitoring well paths and performing assigned tasks in checking anti-collision criteria, etc, using COMPASS, Presgraf, Drillworks Predict software , running WELLPLAN; Torque and drag, Bottom Hole Assembly (BHA), Hydraulics analysis in both planning and drilling phases, CasingSeat, StressCheck, Data Analyzer , PROFILE , EDM Landmark drilling and Completions software.
  • Assisting daily in updating of OpenWells for daily drilling report in Drilling Department B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu , Zamrud , Riau.
  • Well planning activities ;
  • COMPASS Landmark’s
  • The COMputerized Planning and Analysis Survey System, is a comprehensive software tool used by oil companies and directional drilling contractors for directional well design and construction. COMPASS offers a fast and accurate means of well planning and identification of potential directional drilling or anti-collision problems at the earliest possible stage. It includes all the features required for complex well trajectory design, survey and anticollision monitoring, and analysis. COMPASS also includes tools for survey data management, multiple planning methods, torque-drag optimization, anti-collision plotting, and analysis, and platform optimization.
  • Drillworks Predict Standard software and Presgraf
  • Drillworks Predict software, program for accurately deriving a one-dimensional pore pressure analysis at a single well location , fundamental applications in a suite designed for single-well pore pressure analysis. Drillworks software Version 5000.0.0 delivers a trouble avoidance solution that enables Drill-the-Limit performance with less trouble, reduced cost and increased safety.
  • CasingSeat Landmark’s
  • CasingSeat application is used to design viable schemes consisting of casing shoe setting depths and casing sizes. It provides rigorous shoe selection calculation routines to optimize shoe locations based on pore pressure, fracture gradients, and user-defined design constraints.
  • StressCheck Landmark’s
  • StressCheck application is the first graphics-based casing design product for Microsoft Windows 2000 and Windows XP platforms. It incorporates an array of attributes to enable the user to quickly, systematically, and accurately evaluate casing wear limits, minimum cost design, and working-stress design for burst, collapse, axial installation, and service-life load cases. StressCheck is based on casing design principles that are broadly accepted and employed in the petroleum industry. CasingSeat and StressCheck are referred to as ‘Tubular’ applications. It features inventory-based management of permissible hole and casing size combinations.
  • WELLPLAN Landmark’s
  • WELLPLAN is Landmark’s drilling engineering analysis system designed for use at the rig site and the office to provide both well planning and operations analysis. The different engineering modules of WELLPLAN are seamlessly integrated and address aspects of data collection, analysis, well planning, and modeling.
  • OpenWells Drilling Morning Report Software
  • Well Operations Information Management and Reporting System Landmark’s OpenWells software is a fully comprehensive well operations reporting, data analysis and corporate data management system integrated with Landmark’s The Engineer's DeskTop system. OpenWells software supports a complete operations history for any well. Well operations data reported from OpenWells software can be used for analysis with Landmark’s engineering applications on the Engineer's Data Model (EDMTM) platform. The software supports operations reporting for drilling, completions, well services, site construction and reclamation operations. Operators and service companies can use OpenWells software to capture well operations information for corporate and regulatory reporting, performance analysis, offset well benchmarking and well planning.
  • Data Analyzer Data Query and Analysis Software
  • Data Analyzer software is included in the OpenWells software package. Data Analyzer software enables simple or complex adhoc well-operations data querying and analysis for the entire Engineer’s DeskTop software suite. The software provides an easy-to-use, powerful query construction and analysis tool for drilling and completions engineers, enabling them to realize maximum value from all of the well information collected. Queries are constructed using an intuitive selection tree where data fields are displayed with familiar user-defined labels and the data input structure used in other Engineer’s DeskTop software applications. Queries and templates are stored in the Engineer’s Data Model database so that they may be shared among all engineers to promote consistent analysis and query re-use.
  • PROFILE Wellbore Schematics Software
  • PROFILE software is included in the OpenWells software package. PROFILE software enables engineers to create and document planned completions designs and also to review current and historical equipment installation and configuration in completed wellbores. The software generates accurate, high-quality wellbore equipment schematic diagrams using data sourced from the Engineer's Data Model (EDM) platform. The tools allow the creation of planned completions through a drag-and-drop interface and data-entry interfaces.PROFILE software tools provide downhole and surface equipment data entry, high-resolution equipment symbol visualization, and accurate rendering of downhole equipment and operations – all supported by fully comprehensive hardcopy wall plots. Engineers are able to build their own wall-plot formats and equipment symbols.
  • EDM Drilling Software Landmark, in Drilling Department B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu. Zamrud, Riau.
  • Drillworks Predict software

Support Engineer Real Time Operation (RTO) Insite Anywhere Drilling Software HALLIBURTON

PT. Geotech System Indonesia
11.2007 - 12.2007
  • Assists in monitoring online daily drilling activities. In Oil Center 5th floor PERTAMINA Drilling Department.

Support Engineer aplication Drilling and Completions software Landmark’s.

PT. Geotech System Indonesia
04.2007 - 11.2007
  • Assists in well planning activities, Assisting daily in updating of OpenWells, plans and survey files, using COMPASS EDM Drilling Software Landmark in Oil Center 5th floor PERTAMINA Drilling Department.

Petroleum engineer

Petroleum Nusantara Energy
04.2006 - 03.2007
  • Manage operation of Residual Lift EOR by injecting Chemical Surfactant in PERTAMINA Limau Field South Sumatra.
  • - Implementation EOR on PERTAMINA UBEP Limau
  • - Budgeting project cost (AFE,Allowable for Expenditure)
  • - Dealing with service company, how its work and scheduling
  • - Knowing well in Chemical Injection and surface Production

Marketing , QC of wood furniture & handycraft

Abiyasa Gallery
01.2002 - 03.2006
  • Manage expo exhibition, marketing Handycraft and Wood furniture, and QC the quality of wood Furniture & Handycraft

Management

Lembaga Pembinaan Terpadu Industri Kecil dan Dagang Kecil ( LPT INDAK ) Propinsi Jawa Barat Bandung.
05.2001 - 12.2001
  • Management , credit analyst for financing and Administration for small and medium industry.

Resident Consultant

PT. Kogas Driyap Consultant
09.1999 - 04.2001
  • - Management and Administration “ Kanwil Deperindag Jawa Barat Penyaluran Dana Bergulir untuk Industri Kecil dan Menengah serta Pedagang kecil TA 1999 / 2000 di JABAR “ Monitoring and evaluation application System Information Management using FoxPro software.

Management and Administration

PT. Kogas Driyap Consultant
12.1998 - 06.1999
  • - Management and Administration “ Kanwil Deperindag Jawa Tengah Penyaluran Dana Bergulir untuk Industri Kecil dan Menengah serta Pedagang kecil TA 1998 / 1999 di JATENG ” Monitoring and evaluation application System Information Management using FoxPro software.

Major Account Officer / Sales Representative

PT. Trakindo Utama
01.1996 - 01.1998
  • - Marketing Caterpillar Heavy equipment , Such as CAT Bulldozers, CAT Hydraulic Excavator, CAT Off High way Dump Truck or Mining application, CAT Wheel Loader, CAT Motor Grader, CAT Paving Product (CATERPILLAR earth moving equipment) and Diesel Engines ( Electrical Power Supply, Industrial Engines ), CAT Generator set, Olympian genset and Pegson Stone crusher.
  • - Administration Preparing bid tender of project, prepare quotation CAT product, follow up quotation by negotiation Costing pricing product , Collection account receivable.
  • - Management Maintain existing Customer, Arrange delivery Caterpillar heavy equipment, arrange training for operator Caterpillar machine, arrange mechanic to solve the problem customer machine, maintain existing customer.
  • - Engineering Maintenance CAT heavy equipment engine and CAT generator set, Owning operating cost, feature and benefit Caterpillar Heavy equipment .

Management Trainee

PT. Trakindo Utama
01.1995 - 01.1996
  • - Administration Invoicing , purchase order processing, Inventory heavy equipment, prepare quotation based on FOB, FAS , CIF, Customer site etc.
  • - Engineering Maintenance Caterpillar Heavy Equipment Maintenance CAT engine scheduling based on engine hours usage 2500 hours, 5000 hours, 7500 hours and 10.000 hours for engine over hole, studied feature and benefit of Caterpillar machine and Caterpillar diesel engine, fleet matching of Caterpillar heavy equipment to meet optimum production in lowest operating cost US $ / ton, service and spare part operation Caterpillar Engine and machine.
  • - Accounting Basic accounting, trainee at finance department, insurance claims CAT heavy equipment, application software computer AS 400 in accounting.

Project Coordinator

PT. Margorejo
01.1990 - 06.1994
  • Supply raw material for mushroom.

Education

SD N Demakijo II Sleman

undefined

SMP N XI Yogyakarta

undefined

SMA N VII Yogyakarta

Petroleum Engineering

Universitas Pembangunan Nasional “ Veteran “ Yogyakarta

Skills

Create and prepare a concept dashboard well drilling , well workover and implemented in cooperation with programmer and creative team of Information Technology BOB PT Bumi Siak Pusako - Pertamina Hulu

Certification

Sertifikat Kompetensi Kerja Pemboran (Drilling), Ahli Pengendali Bor Darat, Ahli Pengendali Bor Darat, Ahli Perawatan Sumur( Well Servicing)

Training

  • Company : PT. Pertamina Unit Bisnis EP Tanjung, Job Description : Instructor training aplication Landmark’s software drilling and completions. Period : Three days in Jakarta office, April 16 – 18, 2009.
  • Company : Santos Indonesia. Job Description : Instructor training aplication Landmark’s software drilling and completions. Period : Three days in Jakarta office, 2009.
  • Company : JOB Pertamina - Jambi Merang. Job Description : Instructor training aplication Landmark’s software OpenWells Drilling Morning Report Software. Period : Two days in Jakarta office, 2009.

Disclaimer

I hereby declare that the above information is true and correct. Sincerely, Marji Purwanto, ST

Field Practice for thesis

Company : PERTAMINA UEP-I, NORTH SUMATRA Position : Field Practice Period : Two months in 1993 Job Description : - Engineering Evaluate hydraulic fracturing Sumur MJP-20 Pangkalan Susu Field PERTAMINA UEP-I SUMBAGUT.

JOB Training

Company : PERTAMINA UEP-II, WEST JAVA Position : JOB Training Period : One month in 1992 Job Description : - Administration Engineering Drilling program ; drilling activity, cost, administration well cutting, etc. - Engineering Evaluation drilling Mud program, Evaluation cement bond, Evaluation well cutting , Evaluation Gathering system crude oil and transportation pipe line system. MUNDU Field PERTAMINA UEP-II,CIREBON WEST JAVA.

Timeline

Field Production Engineer

PT. Bumi Siak Pusako
08.2022 - 08.2025

Production Engineer

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
10.2017 - 08.2022

Drilling Engineer

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
10.2013 - 10.2017

Quality Control application Drilling and completions software Landmark’s.

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
02.2010 - 06.2013

Support Engineer application Drilling and Completions software Landmark’s.

PT. Geotech System Indonesia
12.2007 - 01.2010

Support Engineer Real Time Operation (RTO) Insite Anywhere Drilling Software HALLIBURTON

PT. Geotech System Indonesia
11.2007 - 12.2007

Familiar With Drilling and Completions Software L

B.O.B. PT. Bumi Siak Pusako – Pertamina Hulu
04.2007 - 10.2022

Support Engineer aplication Drilling and Completions software Landmark’s.

PT. Geotech System Indonesia
04.2007 - 11.2007

Petroleum engineer

Petroleum Nusantara Energy
04.2006 - 03.2007

Marketing , QC of wood furniture & handycraft

Abiyasa Gallery
01.2002 - 03.2006

Management

Lembaga Pembinaan Terpadu Industri Kecil dan Dagang Kecil ( LPT INDAK ) Propinsi Jawa Barat Bandung.
05.2001 - 12.2001

Resident Consultant

PT. Kogas Driyap Consultant
09.1999 - 04.2001

Management and Administration

PT. Kogas Driyap Consultant
12.1998 - 06.1999

Major Account Officer / Sales Representative

PT. Trakindo Utama
01.1996 - 01.1998

Management Trainee

PT. Trakindo Utama
01.1995 - 01.1996

Project Coordinator

PT. Margorejo
01.1990 - 06.1994

undefined

SMP N XI Yogyakarta

undefined

SMA N VII Yogyakarta

Petroleum Engineering

Universitas Pembangunan Nasional “ Veteran “ Yogyakarta

SD N Demakijo II Sleman
Marji PurwantoField Production Engineer , Familiar With Drilling And Completions Software Landmark’s