Summary
Overview
Work History
Education
Skills
Software
Certification
Timeline
Generic
Nicolaus Putrandaru

Nicolaus Putrandaru

East Jakarta

Summary

Accomplished Chief Engineer specializing in evaluating systems to provide cost-effective work plans. Creator of designs and strategies that meet tight deadlines and achieve business objectives. Known provider of reliable and actionable plans for stakeholders in Infrastructure

Construction Industry. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

21
21
years of professional experience
2
2
Certifications

Work History

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
Palu, SN
12.2021 - 07.2023

Reconstruction Road of Kalawara-Kulawi and Sirenja, Design and Built Package, Sulawesi Tengah

  • Streamlined engineering processes for increased efficiency, leading to faster project completion and reduced costs.
  • Coordinate with the design expert (road, geotechnical, drainage, and geologist) and BIM (building information modeling) team to have a complete road design, including protection accessories such as slope and embankment stability, road protection from river scouring, road marking and signs, drainage systems, and tide analysis. All designs are based on national design standards, which are nowadays applicable.
  • Prepare design drawing documents along with compiling planning documents, to obtain approval from the Management Consultant and project owner.
  • Preparing shop drawings based on approved design drawings.
  • Performing work instruction for each work item, to ensure the product meet technical specification.
  • Create job safety analysis documents for each work item.
  • Coordinate with the quality engineer to perform on-site inspections with the consultant supervision and construction team of the project owner.

Head of Construction

PT Wijaya Karya (Persero) Tbk
Lombok
07.2019 - 09.2021

Construction of Road Infrastructure, Clean Water Utility Network, Sewerage, Irrigation Channel, and Electrical Network for Mandalika Exclusive Area

  • Coordinated permitting processes with local authorities for streamlined approvals and reduced delays in project timelines.
  • Reduced construction costs through effective budgeting and negotiation with suppliers.
  • Increased project efficiency by streamlining communication and implementing time management strategies.
  • Consistently delivered high-quality workmanship by setting performance standards based on industry best practices and closely monitoring team adherence.

Coordinator of Quantity Survey

PT Wijaya Karya (Persero) Tbk
Mataram, BT
05.2018 - 05.2019
  • Managed budgets skillfully by tracking expenses diligently and allocating resources appropriately based on priority needs.
  • Collaborated with department heads to develop strategic plans aligning with overall company objectives, fostering a unified approach toward shared goals.
  • Managed project timelines for successful completion, ensuring milestones were met and deadlines were adhered to.
  • Improved team productivity with regular communication and progress updates, fostering a collaborative work environment.

Construction Manager

PT Wijaya Karya (Persero) Tbk
02.2018 - 03.2018

Design and Build Contractor Services for Construction of the Balikpapan-Samarinda Toll Road Sections 2, 3 and 4

  • Implemented safety protocols for reduced workplace injuries, conducting regular site inspections and safety meetings.
  • Increased client satisfaction by consistently delivering high-quality workmanship and addressing concerns promptly.
  • Negotiated favorable contract terms with clients, ultimately benefitting both parties involved in the project.
  • Reduced construction costs through diligent budget management and effective negotiation with suppliers.

Engineering Manager

PT Wijaya Karya (Persero) Tbk
11.2016 - 02.2018

Design and Build Contractor Services for Construction of the Balikpapan-Samarinda Toll Road Sections 2, 3 and 4

  • Coordinate with the design subcontractor team to have a complete highway road design, including bridges, junctions, underpasses, protection accessories such as slope and embankment stability, road accessories, toll gates, road markings and signs, and drainage systems. All designs are based on the national highway design standard, which is nowadays applicable.
  • Preparing detailed engineering design drawing.
  • Coordinate the quantity survey team to prepare a quantity and quality backup document for the monthly certificate.
  • Coordinate with the construction manager for the solution of any technical problem during construction, such as embankment settlement or slope failures.

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
06.2015 - 03.2017

Paselloreng Dam Construction Work Package, Wajo Regency

  • Streamlined engineering processes for increased efficiency, leading to faster project completion and reduced costs.
  • Prepare the presentation for the pre-construction meeting, which consists of the work construction method, project work plan, safety management, general work schedule (including the S-curve), and equipment plan and schedule.
  • Preparing shop drawings for Consultant Supervision approval.
  • Preparing construction methods, calculating work volume, and reviewing shop drawings.
  • Preparing the job mix design dan job mix formula for soil, concrete materials that related with work items.
  • Carry out quality testing of the final results of each stage of work to ensure quality is achieved according to technical specifications.

Supervisor

PT Wijaya Karya (Persero) Tbk
01.2015 - 04.2015

Bridge Construction Work Package I, (Continued) Bintan Island - Dompak Island (Multiyears)

  • Supervise workers at rebar fabrication and setting, as well as formwork setting, for bridge pile cap and column structure construction.
  • Coordinate with the survey team for the structure stakeout.
  • Coordinate with other supervisors during structure concreting work.
  • Attending the weekly construction meeting, which was presided over by the construction manager.
  • Coordinate with the safety officer for safety aspects at every construction site.

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
06.2011 - 05.2014

Hauling Road Package #1 Sta 0+000 - 37+000 PT Gunung Bara Utama

  • Prepare the presentation for the pre-construction meeting, which consists of the work construction method, project work plan, safety management, general work schedule (including the S-curve), and equipment plan and schedule.
  • Preparing shop drawings for Consultant Supervision approval.
  • Preparing construction methods, calculating work volume, and reviewing shop drawings.
  • Preparing the job mix design dan job mix formula for soil, concrete materials that related with work items.
  • Carry out quality testing of the final results of each stage of work to ensure quality is achieved according to technical specifications.

Supervisor

PT Wijaya Karya (Persero) Tbk
02.2010 - 05.2011

Double Track Railway Bridge Serpong-Maja Project, Tangerang

  • Planning work methods together with subcontractors to ensure good quality of work, work safety, and according to the project budget plan.
  • Carrying out material testing with supervisory consultants.
  • Analyze the bar bending schedule to make the use of reinforcing steel more effective.
  • Prepare work progress presentations at meetings with project owners.

Staff Engineer

PT Wijaya Karya (Persero) Tbk
01.2009 - 02.2010
  • Prepare construction methods, calculate work volume, and prepare a general project schedule for various tenders.
  • Prepare technical solution of project problem.
  • Monitor the collection of innovation and construction project reports from various projects.
  • Perform coordination with all regions engineering for any problems that every project faces. This coordination is in the form of discussion.
  • Perform coordination with other engineering departments and fabricators.

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
02.2008 - 12.2008

Calang Harbor Construction Work

  • Prepare the presentation for the pre-construction meeting, which consists of the work construction method, project work plan, safety management, general work schedule (including the S-curve), and equipment plan and schedule.
  • Preparing shop drawings for Consultant Supervision approval.
  • Preparing construction methods, calculating work volume, and reviewing shop drawings.
  • Preparing the job mix design dan job mix formula for soil, concrete materials that related with work items.
  • Carry out quality testing of the final results of each stage of work to ensure quality is achieved according to technical specifications.

Staff Engineer

PT Wijaya Karya (Persero) Tbk
06.2007 - 01.2008

USAID Additional 32km Section 1B-2B-3-4 Banda Aceh - Meulaboh Road

  • Preparing bridge structure shop drawing, including bar banding schedule analysis and detailed steel bridge assembly.
  • Coordinate with the steel truss bridge fabricator for its detail shop drawing and submit it to consultant supervision for approval to start fabrication.
  • Prepare monitoring of shop drawings that explains the status, such as the drafter process, date of submission to consultant supervision, date of return for revision, and date of approval.

Quantity Surveyor Engineer

PT Wijaya Karya (Persero) Tbk
01.2006 - 06.2006
  • Preparing bid documents which included traffic management, construction method and construction master schedule.
  • Calculate work volume based on bid documents drawing.

Staff Engineer

PT Wijaya Karya (Persero) Tbk
08.2005 - 12.2005

Martadinata Flyover Phase 1 Project, Ancol – Jakarta

  • Calculate bridge fly over structure design and consulted it with bridge consultant expert.
  • Prepare the detour bridge design (cast-in-place beam bridge, deck slab bridge, extended slab bridge, and rigid pavement). The design report was reviewed by an independent consultant and then approved by the Jakarta Public Works Department.
  • Prepare the fly-over substructure design (footing, pile cap, and pier) and rigid for the detour road, including detailing the reinforcement bar list.
  • Checking the shop drawings and submitting them to Consultant Supervision (Kanta Karya) for approval before they are ready for construction.

Staff Engineer

PT Wijaya Karya (Persero) Tbk
01.2003 - 06.2005

Pasteur - Cikapayang - Surapati Elevated Road and Bridge

  • As casting yard engineering was responsible for performing pre-production of precast segmental, such as the design and calculation of an additional precast segmental production line building with a 60-cm precast concrete pile column and steel frame roof, The concrete pile column functions as the column of the 2x10-ton Gantry Railway.
  • Preparing all shop drawings for precast segmental elements such as
    reinforcement bars, tendon layouts, concrete dimensions, blisters, and other block-outs for lock-up devices and drainage.
  • Monitoring and making adjustments for precast segmental mold according to the precast segmental that had been cast previously. These adjustments need to be made according to the elevated road design alignment. The precast segmental mold adjustment is based on a running calculation with Formset-C computer software. Even so, manual checking with AutoCAD software drawings also needs to be performed with precast segmental survey data.
  • Monitoring and alignment control for the erection of precast segmental. Based on the as-erected precast segmental survey data, the single pier cantilever can be adjusted to meet the adjacent pier cantilever. If the adjustment is beyond tolerance, in-situ segmentation will be required.
  • Preparation and monitoring of precast segmental stressing by the
    subcontractor.
  • Coordinate with the independent consultant team in designing a 10-meter-high reinforced earth retaining wall.
  • Preparation of a precast segmental erection method with a 300-ton launching gantry.

Education

Bachelor of Science - Civil Engineering

Diponegoro University
Semarang, Indonesia
01.2001 - 04.2001

Skills

  • Budget Development

  • Regulatory Compliance

  • Safety Protocols

  • Resource Allocation Optimization

  • Project Management

  • Project Scheduling

  • CAD Software

  • Engineering Design

  • Quality Assurance

  • Design review

  • Teamwork and Collaboration

Software

Primavera

AutoCAD 2D

Autodesk Infraworks

Autodesk Navisworks

Sketchup3D

Microsoft Project

AutoCAD Civil3D

Tekla Structure

Certification

Associate Expert in Water Resources Engineering License - Apr 2029

Timeline

Associate Expert in Water Resources Engineering License - Apr 2029

04-2024

Senior Expert in Road Engineering License - Feb 2027

02-2022

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
12.2021 - 07.2023

Head of Construction

PT Wijaya Karya (Persero) Tbk
07.2019 - 09.2021

Coordinator of Quantity Survey

PT Wijaya Karya (Persero) Tbk
05.2018 - 05.2019

Construction Manager

PT Wijaya Karya (Persero) Tbk
02.2018 - 03.2018

Engineering Manager

PT Wijaya Karya (Persero) Tbk
11.2016 - 02.2018

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
06.2015 - 03.2017

Supervisor

PT Wijaya Karya (Persero) Tbk
01.2015 - 04.2015

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
06.2011 - 05.2014

Supervisor

PT Wijaya Karya (Persero) Tbk
02.2010 - 05.2011

Staff Engineer

PT Wijaya Karya (Persero) Tbk
01.2009 - 02.2010

Head of Engineering and Quality Control

PT Wijaya Karya (Persero) Tbk
02.2008 - 12.2008

Staff Engineer

PT Wijaya Karya (Persero) Tbk
06.2007 - 01.2008

Quantity Surveyor Engineer

PT Wijaya Karya (Persero) Tbk
01.2006 - 06.2006

Staff Engineer

PT Wijaya Karya (Persero) Tbk
08.2005 - 12.2005

Staff Engineer

PT Wijaya Karya (Persero) Tbk
01.2003 - 06.2005

Bachelor of Science - Civil Engineering

Diponegoro University
01.2001 - 04.2001
Nicolaus Putrandaru