Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic
Novi Yani

Novi Yani

Engineer And Inspector Electrical Instrument
Indramayu

Summary

I am Noviyani

More than eight (9) years of experience in energy projects with extensive experience in developing conceptual studies, power & control systems, equipment selection, operation, optimization of existing equipment, extended technical matter during construction and commissioning. In charge as proposal team and project execution team. Also experienced working in a multicultural and national working environment which gives great value to my career advancement.

Overview

2025
2025
years of professional experience

Work History

Electrical Field Engineer

PT SEPCO II ( PT Aditara Jaya Perkasa )
Karawang , West Java, West Java
09.2024 - Current
  • Make Bill of Quantity (BOQ) and Bill of Material (BOM).
  • Review the work methods & Make the RFW & JSA document.
  • Review the drawing before submitting it to the owner for approval.
  • Cross-checking of drawing based on actual conditions in the field.
  • Calculate material requirements.
  • Create work schedules with the project control team.
  • Make a dispatch clearance letter for material arrival.
  • Assist and coordinate with supervision for installation in the field.
  • To coordinate and inspection activities including the verification of related materials and equipment/accessories.
  • Responsible handle technical issues, specification, drawing, materials, reports, procedures and any relevant documents.
  • Coordinate with Supervisor construction for killing punch list
  • Assisting Commissioning activities.
  • Monitoring for Calibration Field Instrument.
  • Collaborated with interdisciplinary teams to complete complex projects on time and within budget.

QC Instrument Inspector

PT MINSUNG EPC
06.2024 - 09.2024

• Make sure testing cable end to end continuity drum cable before pulling

• Continuity and insulation resistance for LV & MV cable , make sure the cable installation Is according to the cable specification

• Identify all items that do not comply with applicable standards and specification To develop a punch list

• Check the cable ensure no damage , continuity test cable to ensure cable destination Is correct as per required, insulation resistance test to make sure the cable include In value acceptance criteria as per required for equipment

• Perform detailed inspections all equipment of Electrical device

• Manage report and daily report to reflect daily inspection progress

• Coordinate and inform the contruction team if during the inspection there is installation Of electrical equipment that does not comply with standards and if there is damage

To equipment and cable

QC Electrical Instrument Inspector

PT. Jurong Engineering Lestari
7 2023 - 06.2024

• Make sure testing cable end to end continuity drum cable before pulling

• Continuity and insulation resistance for LV & MV cable , make sure the cable installation Is according to the cable specification

• Identify all items that do not comply with applicable standards and specification To develop a punch list

• Check the cable ensure no damage , continuity test cable to ensure cable destination Is correct as per required, insulation resistance test to make sure the cable include In value acceptance criteria as per required for equipment

• Perform detailed inspections all equipment of Electrical device

• Manage report and daily report to reflect daily inspection progress

• Coordinate and inform the contruction team if during the inspection there is installation Of electrical equipment that does not comply with standards and if there is damage

To equipment and cable

QC Electical Inspector & Testing

PT. Wijaya Engindo Nusa
07.2021 - 03.2023

• Make sure testing cable end to end continuity drum cable before pulling

• Continuity and insulation resistance for LV & MV cable , make sure the cable installation Is according to the cable specification

• Identify all items that do not comply with applicable standards and specification To develop a punch list

• Check the cable ensure no damage , continuity test cable to ensure cable destination Is correct as per required, insulation resistance test to make sure the cable include In value acceptance criteria as per required for equipment

• Perform detailed inspections all equipment of Electrical device

• Manage report and daily report to reflect daily inspection progress

• Coordinate and inform the contruction team if during the inspection there is installation Of electrical equipment that does not comply with standards and if there is damage

To equipment and cable

QC Instrument Maintenance

PT. Mega Energy Indonesia
05.2021 - 07.2021
  • Managed inventory of spare parts and consumables required for instrument maintenance tasks, maintaining optimal stock levels to avoid operational delays due to part shortages.
  • Conducted preventive maintenance and troubleshooting of metering instruments.
  • Performed repair procedures on damaged instruments and sourced replacements from approved vendors.
  • Calibrated combustion controls to meet appropriate safety standards.

QC Electrical Inspector & Testing

PT. Wijaya Engindo Nusa
04.2020 - 12.2020

• Make sure testing cable end to end continuity drum cable before pulling

• Continuity and insulation resistance for LV & MV cable , make sure the cable installation Is according to the cable specification

• Identify all items that do not comply with applicable standards and specification To develop a punch list

• Check the cable ensure no damage , continuity test cable to ensure cable destination Is correct as per required, insulation resistance test to make sure the cable include In value acceptance criteria as per required for equipment

• Perform detailed inspections all equipment of Electrical device

• Manage report and daily report to reflect daily inspection progress

• Coordinate and inform the contruction team if during the inspection there is installation Of electrical equipment that does not comply with standards and if there is damage

To equipment and cable

Foreman Document QC Instrument

PT. Kontrol Power Utama
10.2019 - 02.2020
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.

Electrical Instrument Foreman

PT. Wijaya Karya Rekotruksi
06.2019 - 10.2019

QC Electrical Instrument Foreman

PT. Baharu Penta Kencana
08.2018 - 04.2019
  • Project/Location: Temporary Facility Camp, LNG Tangguh - Papua Barat

Instrument Supervisor Termination

PT. Kontrol Power Utama
03.2018 - 06.2018
  • Project/Location: Tissue Machine Oki Pulp and Paper, Palembang - Sumatera Selatan

Foreman Electrical - Instrument

PT. Graha Usaha Teknik
10.2017 - 02.2018
  • Project/Location: PLTU Tabalong 2X100MW, Kalimantan Selatan

Electrical Construction

PT. Wijaya Engindon Nusa
02.2017 - 09.2017
  • Project/Location: Project SRI U3, Cilegon-Banten

Electrical Construction 1

PT. Surya Tarra Mandiri
01.2015 - 07.2016
  • Project/Location: Duckting and Catwork
  • Yamaha KIIC Karawang

QC Instrument - Pre Comm Assist Vendor

Wen International SDN. BHD
05.2015 - 01.2016
  • Project/Location: Petronas LNG Train 9
  • Bintulu 97000, Sarawak Malaysia.

QC Electrical - Instrument 2

PT. Wijaya Engindo Nusa
01.2013 - 06.2014
  • Project/Location: Mechanical & Electrical Work Service
  • LNG Tangguh - Papua Barat

Electrical - Instrument 2

PT. Wijaya Engindo Nusa
09.2012 - 12.2012
  • Project/Location: PLN Power Interconecting Project
  • LNG Tangguh - Papua Barat

Instrument 2

PT. Koneksindo Karya Mandiri
03.2012 - 06.2012
  • Project/Location: UPGRADE DCS UP VI BALONGAN
  • PT PERTAMINA UP VI BALONGAN

Electrical - Instrument 3

PT. Wijaya Engindo Nusa
09.2011 - 12.2011
  • Project/Location: M&E Work Service
  • PT
  • Indonesia Bulk Terminal - Oil Berth - Kalimantan

Education

Sekolah Menengah Atas - IPA

MAN Indramayu
Indramayu

Sekolah Menengah Pertama -

SMPN 2 Balongan
Balongan

Sekolah Dasar - undefined

SDN Majakerta 1

Teknik Electro - Semester 4

Universitas Subang

Skills

Operate Computer

Personal Information

Date of Birth: 11/06/92

Timeline

Electrical Field Engineer

PT SEPCO II ( PT Aditara Jaya Perkasa )
09.2024 - Current

QC Instrument Inspector

PT MINSUNG EPC
06.2024 - 09.2024

QC Electical Inspector & Testing

PT. Wijaya Engindo Nusa
07.2021 - 03.2023

QC Instrument Maintenance

PT. Mega Energy Indonesia
05.2021 - 07.2021

QC Electrical Inspector & Testing

PT. Wijaya Engindo Nusa
04.2020 - 12.2020

Foreman Document QC Instrument

PT. Kontrol Power Utama
10.2019 - 02.2020

Electrical Instrument Foreman

PT. Wijaya Karya Rekotruksi
06.2019 - 10.2019

QC Electrical Instrument Foreman

PT. Baharu Penta Kencana
08.2018 - 04.2019

Instrument Supervisor Termination

PT. Kontrol Power Utama
03.2018 - 06.2018

Foreman Electrical - Instrument

PT. Graha Usaha Teknik
10.2017 - 02.2018

Electrical Construction

PT. Wijaya Engindon Nusa
02.2017 - 09.2017

QC Instrument - Pre Comm Assist Vendor

Wen International SDN. BHD
05.2015 - 01.2016

Electrical Construction 1

PT. Surya Tarra Mandiri
01.2015 - 07.2016

QC Electrical - Instrument 2

PT. Wijaya Engindo Nusa
01.2013 - 06.2014

Electrical - Instrument 2

PT. Wijaya Engindo Nusa
09.2012 - 12.2012

Instrument 2

PT. Koneksindo Karya Mandiri
03.2012 - 06.2012

Electrical - Instrument 3

PT. Wijaya Engindo Nusa
09.2011 - 12.2011

Sekolah Dasar - undefined

SDN Majakerta 1

Teknik Electro - Semester 4

Universitas Subang

QC Electrical Instrument Inspector

PT. Jurong Engineering Lestari
7 2023 - 06.2024

Sekolah Menengah Atas - IPA

MAN Indramayu

Sekolah Menengah Pertama -

SMPN 2 Balongan
Novi YaniEngineer And Inspector Electrical Instrument