Summary
Overview
Work History
Education
Skills
Work Availability
Languages
Timeline
Hi, I’m

Parwoto

Assistant Section Manager
Cikarang barat
Parwoto

Summary

Dynamic professional with over 5 years of experience in the automotive industry, specializing in leadership and project management to drive operational excellence at PT Denso Indonesia. Proven expertise in team leadership and operations management, adept at coordinating efforts, optimizing workflows, and delivering successful projects. Recognized for a strong focus on collaboration, adaptability, and impactful results, complemented by a reputation for reliability, effective communication, and strategic problem-solving. Committed to motivating teams and enhancing processes to optimize operational efficiency and achieve organizational objectives.

Overview

9
years of professional experience
2
Languages

Work History

PT Denso Indonesia

Assistant Section Manager
01.2024 - Current

Job overview

  • Led and managed projects related to improving or creating Special Purpose Machines (SPMs) within the machinery department.
  • Developed project plans, timelines, and budgets.
  • Managed project resources, including personnel, equipment, and materials.
  • Scheduled and prioritized constrained resources and adjusted staffing to meet flow and customer requirements.
  • Developed strong relationships with suppliers, negotiating contracts for better pricing and delivery terms.
  • Collaborated with other section managers to identify areas of improvement across departments, leading to increased overall efficiency.
  • Oversaw project timelines, ensuring deadlines were met consistently without compromising quality or customer satisfaction levels.

PT Denso Indonesia

Machinery Production Control Supervisor
07.2021 - 12.2023

Job overview

  • Planned, scheduled, and controlled machinery production processes, coordinating materials, inventory, and resources to ensure on-time, on-budget output and achievement of production targets.
  • Monitored production workflows and performance, analyzing progress, identifying inefficiencies, and implementing improvements to enhance productivity and quality control.
  • Maintained organized, safe, and efficient work environments, supporting smooth manufacturing flow, accurate reporting, and strong cross-team coordination.

PT Denso Indonesia

Machine Design Supervisor
06.2019 - 07.2021

Job overview

  • Led and supervised design engineers and technicians, assigning tasks, reviewing designs, and coordinating with production and quality teams to meet project deadlines.
  • Managed machine design projects for automated and semi-automated systems, improving efficiency, reducing production costs, and supporting continuous improvement initiatives.
  • Oversaw all machine design activities, ensuring design accuracy, project timelines, and production readiness.

PT Inkoasku - Pako Group

Engineering Supervisor
01.2019 - 05.2019

Job overview

  • Facilitated strong teamwork among department members by fostering an inclusive culture that promoted open dialogue, feedback sharing, and mutual respect among colleagues.
  • Conducted regular performance reviews for team members, identifying strengths and areas for improvement to guide their ongoing professional development.
  • Coordinated activities with other units of organizations to develop cross-functional strategic plans to enhance company performance.
  • Balanced project priority and business demand and aligned resources to accomplish assignments, projects and continuous improvements.
  • Implemented continuous improvement initiatives, identifying areas of inefficiency and developing solutions to address them.

PT Astra Visteon Indonesia

Staff Process Engineer
08.2016 - 08.2018

Job overview

  • Conducted root cause analysis to identify, prioritize and eliminate process losses.
  • Collaborated with cross-functional teams to improve product quality, resulting in increased customer satisfaction.
  • Reduced production downtime by conducting thorough root cause analyses and implementing corrective actions.
  • Developed documentation, diagrams, and specifications to meet project requirements and regulatory standards.
  • Provided technical support for troubleshooting equipment issues, maintaining plant reliability and minimizing operational disruptions.
  • Provided technical assistance to production team when issues arose.
  • Developed process control strategies for optimizing equipment performance and reducing variability in production output.
  • Reviewed processes, identifying areas requiring improvement.
  • Identified bottlenecks in the production line through capacity analysis studies, increasing overall throughput rates as a result.

Education

Mercubuana University
Jakarta

Bachelor's degree from Industrial Engineering
08.2018

Astra Polytechnic
Jakarta

Associate's degree from Mechatronics engineering
06.2016

Skills

Workplace safety

Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Languages

English
Professional Working
Indonesian
Native or Bilingual

Timeline

Assistant Section Manager

PT Denso Indonesia
01.2024 - Current

Machinery Production Control Supervisor

PT Denso Indonesia
07.2021 - 12.2023

Machine Design Supervisor

PT Denso Indonesia
06.2019 - 07.2021

Engineering Supervisor

PT Inkoasku - Pako Group
01.2019 - 05.2019

Staff Process Engineer

PT Astra Visteon Indonesia
08.2016 - 08.2018

Astra Polytechnic

Associate's degree from Mechatronics engineering

Mercubuana University

Bachelor's degree from Industrial Engineering
Parwoto Assistant Section Manager