Peter Dewa Hendrayana

Maintenance Planner
Pelalawan

Summary

Results-driven Maintenance Planning Engineer with APRIL, skilled in maintenance scheduling and work order management. Achieved enhanced asset reliability through root cause analysis and strategic spare parts management. Proficient in SAP and committed to continuous improvement, fostering a culture of safety and efficiency within the maintenance team.

Overview

6
6
years of professional experience
2
2
Certifications

Work History

Maintenance Planning Engineer

APRIL
01.2021 - Current
  • Developed comprehensive maintenance schedules specially in preventive maintenance to align with production goals and minimize disruptions.
  • Conducted regular risk assessments in relation to equipment failure and implemented appropriate mitigation measures.
  • Enhanced asset reliability by conducting root cause analysis for recurring issues, implementing corrective actions as needed.
  • Managing machine performance through monthly and annual shutdowns along with pre and post shut jobs with some KPIs.
  • Analyzed work order data to identify trends and areas for process improvements in the maintenance department.
  • Evaluated spare parts inventory levels, ensuring availability while optimizing costs through strategic procurement practices and continuous engineering.

Mechanical Maintenance Engineer

APRIL
11.2019 - 01.2021
  • Created weekly reports of maintenance activity to share with management for operational analysis.
  • Developed and coordinated effective predictive, preventive, and corrective maintenance approaches.
  • Conducted root cause analyses to identify recurring issues and implement long-term solutions.
  • Involved at safety activities.

Education

S.T. - Mechanical Engineering

Brawijaya University
Malang
04.2001 -

Skills

Maintenance scheduling

Accomplishments

  • Achieved 100% KPI target by completing Annual Shutdown with accuracy and efficiency.
  • Achieved 43% downtime reduction by introducing SAP PM preventive maintenance schedule for preventive maintenance tasks.
  • Developed newly hired team of 5 new staff members to be able performing their role.

Certification

Shutdown Management Training - 3 days

Timeline

Shutdown Management Training - 3 days

05-2024

Inventory Control Training - 1 week

05-2024

Maintenance Planning Engineer

APRIL
01.2021 - Current

Mechanical Maintenance Engineer

APRIL
11.2019 - 01.2021

S.T. - Mechanical Engineering

Brawijaya University
04.2001 -
Peter Dewa HendrayanaMaintenance Planner