Maintained clean, safe working environment by removing debris from job site prior to shift completion.
Used picks and shovels to dig, spread and level dirt and gravel.
Installed structures or fixtures using hand or power tools per plan drawings.
Used wheelbarrow to move debris and material to designated areas on jobsite.
Used trowels and floats to smooth and finish freshly poured cement or concrete.
Volunteer Builder
Brahma kesa
Battambang
01.2022 - 02.2022
With a team of builders we removed the old steel tray roof of a school in a small village called Prey Svey near the city of Battambang to make a new roof still in steel tray, for the Brahma Kesa association recognized as being of general interest since 2007