Summary
Overview
Work History
Education
Skills
Personal Information
Training
Timeline
91
Puja  Ardiles ST

Puja Ardiles ST

Batam,Kepulauan Riau

Summary

Experienced Construction Project professional with 4 years of experience in the Engineering, Procurement and Construction (EPC) industry, with a specialization in offshore construction. Have a good skill, highly motivated, focused on quality and safety, initiative person and eager to working on high standard.

Overview

9
9
years of professional experience

Work History

Mechanical Engineer (Construction)

PT. Seatrium (SMOE Indonesia)
09.2023 - Current

Project : Sofia Offshore Wind Farm - HVDC Offshore Converter Platform

Client : RWE - UK

Total Weight Topside 13400MT


  • Review construction execution plan (scope of work, health and environment safety (HES), equipment and manpower resource, schedule and timeline shipment plan, etc.).
  • Prepare scope of work and task listing.
  • Implement schedule, execute projects and ensure schedule are adhered.
  • Performed thorough risk assessments before executing projects, minimizing potential hazards or delays during implementation phases.
  • Review and coordinated with vendor on specification, quality procedure, work methods and dossiers prior to installation.
  • Ensure all work is carried out in a safe and productive manner in accordance with company HSE policies and procedures.
  • Review lifting plan for field execution phase of project and assist engineering team in producing lifting plan.
  • Review drawing for constructability issues, identifies any special items and provide inputs where it's necessary for optimal performance outcomes.
  • Prepare and monitor tools and consumables requirement for mechanical activities.
  • Interface with all internal and external parties involved in the project to streamline inter-departmental communication and collaboration efforts effectively.
  • Collaborated with cross-functional teams to identify for job sequence, achieving significant savings without compromising on quality and to ensure timely delivery of high-quality construction projects.
  • Implemented quality control measures at every stage of construction, ensuring high levels of workmanship were maintained consistently across all projects.
  • Established strong relationships with vendors to ensure timely delivery of equipment and material.
  • Conducted thorough inspections to identify potential issues and recommend effective solutions.
  • Developed comprehensive documentation outlining project progress, results, and recommendations for future improvements.
  • Monitor management of change and coordinate with planner for additional cost and impact to complete the job.
  • Lead development and execution of mechanical construction plans, resulting in successful project completion.
  • Monitored daily progress and work quality to provide guidance and direction to mechanical teams.
  • Prepare and submit weekly progress report to management.
  • Prepare workpack for offshore carry over and hook up activities.

Mechanical Completion (Mechanical)

PT. Seatrium (SMOE Indonesia)
01.2024 - 06.2024

Project : Sofia Offshore Wind Farm - HVDC Offshore Converter Platform

Client : RWE - UK

Total Weight Topside 13400MT


  • Site work control refers to project documents, drawing and specification, according to mechanical completion purpose.
  • Conducted thorough all inspection request during installation, load test and mechanical completion activities.
  • Assisting vendor as required for particular test requirement.
  • Line check mechanical equipment & skid according to drawing, P&ID.
  • Line check Monorail & Pad eye according to drawing.
  • Mechanical Completion (MC) inspection with Client.
  • Manage and execute all mechanical / safety punchlist.
  • Ready for Commissioning Certificated (RFCC) Inspection hand over to Commissioning.

Mechanical Supervisor (Construction)

PT. SMOE Indonesia
10.2022 - 08.2023

Project : Sofia Offshore Wind Farm - HVDC Offshore Converter Platform

Client : RWE - UK

Total Weight Topside 13400MT


  • Delegated team assignments, reviewed work and set schedules to maintain optimal coverage of all mechanical needs.
  • Contributed to process improvement initiatives by offering valuable insights based on extensive field experience.
  • Reported on work progress to manager and incorporated feedback to maintain tight schedules.
  • Interface with all internal and external parties involved in the project to streamline inter-departmental communication and collaboration efforts effectively
  • Developed strong relationships with clients, vendors, and subcontractors to smooth project execution.
  • Worked effectively with other departments, vendors and regulators to achieve operational objectives.
  • Supervised installation of different types of mechanical equipment, keeping work in line with drawings and specifications.
  • Ensured quality control with meticulous inspection of completed work, addressing any discrepancies promptly.
  • Ensured erection and installation of mechanical equipment follows sequence and schedule.
  • Supervised and ensure shaft alignment of the coupling pump using a laser shaft alignment tool.
  • Coordinated with cross-functional such as rigging, surveyor, quality and vendor prior heavy and critical lifting.
  • Monitored and motivated employees, tracking and documenting activities, correcting problems and implementing improvement plans to boost quality of mechanical work.
  • Prepared regular departmental reports detailing mechanical installation and inspection activities.
  • Prepared and monitor tools and consumables requirement for mechanical activities.
  • Monitored daily progress and quality of work to provide guidance and direction to the teams.
  • Managed efficient teams of up to 30 employees.

Mechanical Supervisor (Offshore)

PT. Sembcorp Marine Offshore Platform
01.2022 - 08.2022

Project : Gallaf Al Shaheen Project Batch 2 EPCIC4 New Wellhead Platform Hook Up and Integration

Client : North Oil Company (NOC) - Qatar


  • Plan Tools & Equipment for Offshore Installation
  • Planning and progress of project
  • Coordination of Mechanical discipline for COW and Hook-up Offshore Installation
  • Prepare fabrication for installation sequence
  • Ensure quality and safety while maintaining schedule
  • Prepare and submit daily progress report to Lead Mechanical
  • Manage and execute all Mechanical/ HVAC Punchlist (FAT, PCGen) ICAPS System
  • Execute COW & Offshore Hook Up
  • Assist Precommissioning & Commissioning Task
  • Assist Vendor's Representative and Site Operations in Commissioning and Star-up activities
  • Assist for testing and set-up of all Mechanical Field Equipment, inclusive of Open Drain Pump, Closed Drain Pump, Air Compressor, Fire Water Pump, Deluge Valve Skid, Piping System, Chemical Injection and Pedestal Crane
  • Assist (SAT) and recording data vibration, temperature, sound, speed, and voltage of motor
  • Complete mechanical equipment checks sheet and handover to Start-Up Engineer's Plant Operations
  • Managed efficient teams of up to 10 employees.

Mechanical Foreman

PT. SMOE Indonesia
04.2021 - 10.2021

Project : Gallaf Al Shaheen Project Batch 2 EPCIC4 CE & EH New Wellhead Platform

Client : North Oil Company (NOC) - Qatar

Total Weight CE Topside+ CE Jacket+ CE Bridge 6380T

Total Weight EH Topside+ EH Jacket+ EH Bridge 5680T


  • Check incoming new equipment machine before install to module
  • Measure & leveling foundation equipment machine before installation
  • Planning method installation equipment machine before stay on position
  • Preparation equipment tools and part before installation
  • Perform installation equipment machine to foundation at module
  • Responsible for controlling equipment machine after installation
  • Responsible for controlling equipment tools and part consumption
  • Prepare and control certificate equipment tools
  • Responsible for controlling inspection and calibration equipment tools
  • Responsible for preparation and control document & release note for mechanical equipment
  • Witness & inspection with client before release equipment
  • Responsible for closing punch list
  • Prepare and submit daily progress report to Lead Mechanical

Mechanical Technician

PT. SMOE Indonesia
12.2020 - 03.2021

Project : Gallaf Al Shaheen Project Batch 2 EPCIC4 CE & EH New Wellhead Platform

Client : North Oil Company (NOC) - Qatar

Total Weight CE Topside+ CE Jacket+ CE Bridge 6380T

Total Weight EH Topside+ EH Jacket+ EH Bridge 5680T


  • Check incoming new equipment machine before install to module
  • Measure & leveling foundation equipment machine before install
  • Planning method install equipment machine before stay on position at module
  • Preparation equipment tools and part before install
  • Perform install equipment machine to foundation at module
  • Check and monitoring equipment machine after install
  • Control equipment tools and part consumption
  • Prepare and control certificate equipment tools
  • Control inspection and calibration equipment tools

Engineering Technician 04

PT. Flextronics Technology Indonesia
01.2020 - 11.2020
  • Troubleshoot KohYoung machine Solder Paste Inspection (SPI)
  • Troubleshoot Vitrox machine Automatic Optical Inspection (AOI)
  • Programming KohYoung machine Solder Paste Inspection (SPI)
  • Programming Vitrox machine Automatic Optical Inspection (AOI) perform new product introduction (NPI)
  • Improvement process production for increase output
  • Control & monitoring defect
  • Check & monitor Statistical Process Control (SPC)
  • Shifting machine

Production Assistant III

PT. Panasonic Industrial Devices Batam
02.2016 - 03.2019
  • Perform daily, monthly, and yearly schedule periodic maintenance Auto Stacking & Welding Machines
  • Carried out cooling Water Circulation include Chiller Machines (EYELA CAP-1000 & CTP-1000)
  • Carried out overhaul element supply chuck
  • Machine spare part replacement, spare par consumption record and control
  • Carried out Continuous Improvement (KAIZEN KIAN) activity to meet Quality, Safety, and Productivity (Auto Stacking Machine and Auto Welding Machine)
  • Make report progress to JAPAN Team
  • Monitoring defect after improvement
  • Collect data after improvement
  • Perform document control
  • Trainer new member

Quality Control Inspector (Internship)

PT. Aker Solutions
02.2015 - 06.2015
  • Daily inspection product
  • Prepare document control report
  • Entry inspection data using SAP system
  • Material handling
  • Preparing document and goods logistic shipment
  • Tooling maintenance
  • Tooling preventive maintenance

Education

Bachelor of Engineering - Mechanical Engineering

Batam University
Batam, Indonesia
12.2022

Associate in Engineering Technology - Mechanical Engineering

Batam State Polytechnic
Batam, Indonesia
07.2015

Skills

  • Construction
  • Offshore Construction
  • Leadership
  • Permit Applications
  • Heavy Lifting
  • Project Planning & Management
  • Site Management
  • P&ID
  • Communication
  • Problem Solving
  • Continuous Improvements
  • Team Works
  • Fabrication
  • Ms Office

Personal Information

  • Place of Birth: Surabayo (Padang), Indonesia
  • Date of Birth: 04/12/94

Training

  • KSB Indonesia, Laser Shaft Alignment, 2024
  • Wood Group Training, Confined Space Entry, 2022
  • SAMSON TIARA, OPITO approve Basic Hydrogen Sulphide Training (H2S), 2021
  • BSTC Batam, OPITO approve T-BOSIET training, 2021
  • Offshore Technology Institute (OTI), AutoCAD 2D & 3D, 2020
  • Offshore Technology Institute (OTI), Drafter, 2020
  • Rewata Consultant, Kesehatan dan Keselamatan Kerja (K3) Basic Factory, 2020
  • Skill Academy by Ruang Guru, Kelola Project dengan Microsoft Project, 2020
  • Step Ahead, English Conversation Lv.1, 2017

Timeline

Mechanical Completion (Mechanical)

PT. Seatrium (SMOE Indonesia)
01.2024 - 06.2024

Mechanical Engineer (Construction)

PT. Seatrium (SMOE Indonesia)
09.2023 - Current

Mechanical Supervisor (Construction)

PT. SMOE Indonesia
10.2022 - 08.2023

Mechanical Supervisor (Offshore)

PT. Sembcorp Marine Offshore Platform
01.2022 - 08.2022

Mechanical Foreman

PT. SMOE Indonesia
04.2021 - 10.2021

Mechanical Technician

PT. SMOE Indonesia
12.2020 - 03.2021

Engineering Technician 04

PT. Flextronics Technology Indonesia
01.2020 - 11.2020

Production Assistant III

PT. Panasonic Industrial Devices Batam
02.2016 - 03.2019

Quality Control Inspector (Internship)

PT. Aker Solutions
02.2015 - 06.2015

Bachelor of Engineering - Mechanical Engineering

Batam University

Associate in Engineering Technology - Mechanical Engineering

Batam State Polytechnic
Puja Ardiles ST