Summary
Overview
Work History
Education
Skills
Mobile Contact
Industry Training And Qualifications
Timeline
Generic
Riki Rizki Maulana

Riki Rizki Maulana

Field Service Technician
Bandung,West Java

Summary

Experienced Wellhead Field Service Technician with 12+ years of maintenance and repair expertise. Committed to optimizing equipment functionality through efficient management of routine and complex equipment and facility matters. Strong understanding of hand and power tool operation, with strict adherence to safety measures. Skilled in performing diverse maintenance tasks, consistently delivering high-quality results.

Overview

13
13
years of professional experience
3
3
years of post-secondary education
2
2
Languages

Work History

Field Service Technician

FMC Technologies
01.2012 - Current
  • Wellhead and X-Mas tree installation / removing, including: casing hanger, single and dual tubing hanger, external cold cut casing by cold cutter machine and install Conventional and Unihead wellhead
  • Well maintenance: repair, replace, flushing, greasing and pressure test gate valve completed with well record on site
  • Support and prepare equipments in workshop prior shipment to rig site/offshore
  • Maintain tools on site or shore base
  • Update inventory of tools and equipments on site
  • Proactive in safety program
  • Attended meeting with Customer
  • Individual Job Experience:
  • SANTOS: Well Completion: Install Tubing Hanger 4 1/16", Set BPV IS-A type by using IS-A Lubricator, Install X-mas tree 4 1/16"-10K complete with pressure test
  • Well Head Preventive Maintenance: Fit and function test manual and hydraulic gate valve, repair and replace seat manual gate valve M120+ 4 1/16"-10K, replace Hydraulic Actuator Haliburton type with Hydraulic Actuator FMC size 4 1/16"-10K
  • Replace annulus valve M120 2 1/16"-5K and used VR Lubricator Telescopic to set VR plug
  • BP (British Petroleum) TANGGUH project: Wellhead Installations: Install 30" Conductor, Casing Head 18 5/8"-5k, Lower Unihead 18 5/8"-5K clamp hub BTM x 10 3/4"-10K clamp hub TOP, Upper Unihead 10 3/8"-10K BTM x 9 5/8"-10K TOP
  • Well Completions: Install Tubing Hanger 7" and Solid Block X-mast tree c/w pressure test
  • Well Head Preventive Maintenance: Type 1 (Fit and function test Manual valve and Actuator), Type 2 (Integrity Test Valve and Actuator X-mas tree and SCSSV), Type 3 (Greasing cavity manual valve and actuator), Type 4 (Thorough Unihead and X-Tree Inspection)
  • FAT (Factory Acceptance Test): Install stack up wellhead from casing head until X-mastree with all accessories
  • PETRONAS CARIGALI: Wellhead Installations: Install stack up wellhead from casing head until X-mast tree
  • Well Completion: Install Tubing Hanger TC-1A-ENS-LR, Install Composite Block Valve
  • Install X-mas tree 4 1/16"-10K complete with pressure test
  • Well Head Preventive Maintenance: Flushing and greasing job at annulus valve 2 1/16"-5k, Greasing job at X-mas tree valve 4 1/16"-10K and pressure test, repair and replace seat manual gate valve M120+ 4 1/16"-10K
  • PHE ONWJ: Well Head Preventive Maintenance: Repair and replace Manual gate valve M120 2 1/16"-5K
  • Perform Greasing Job, Hot bolting and preliminary work over
  • MEDCO LAGAN: Installations: Install Casing Slip type C-21 18 ¾"-3K x 13 3/8"-5K, Install Tubing Head adapter 13 3/8"-5K x 9 5/8"-5K
  • TOTAL EP: Wellhead Installation: Installation surface s x s (Side by Side) wellhead / 2 in 1 wellhead system at Total Peciko Indonesia
  • Install Upper male and Lower male connection, Install Downhole Guide
  • Installation Mandrel Hanger 13 3/8, Installation unihead Assy
  • Installation Mandrel Hanger 9 5/8 and Packoff 9 5/8
  • Completion Job, installation Tubing hanger and Installation Christmas Tree Assy
  • CHEVRON: Well Completions and work over program: Install tubing hanger Assy and Install Assy section single stack x-mas tree 4 1/16 5K
  • Install and retrieve BPV type CIW with used PBMO Lubricator
  • GENTING OIL: Installation: Install Casing Head assy C-29 20" SOL, Install Casing Head SOW BTM x 13 5/8-5K, Install mandrel casing hanger 13 3/8, Installation packoff 13 3/8, Installation Unihead Assy 13 5/8 10K, Install Abandonment Cap 9 5/8"-5K x 4 1/16"-10K
  • VICO INDONESIA: Install Tubing Hanger packoff 9 5/8"-10K, Install Dual Solid block X-mas tree 4 1/16"-10K
  • ENI (Jangkrik and Merakes) Project Indonesia (Subsea): Prepare and arrange equipment from shore base to be sent to offshore
  • Perform SIT for Jangkrik XT11
  • Function test and pressure test various ROV tools
  • Perform PSM (Preservations Service and Maintenance) for various Subsea service tools
  • Perform SIT for Merakes XT
  • Function test Umbilical Disconnecting System at Semi Submersible rig Catarina

Education

Diploma Degree (D3) - Mechanical Engineering

Bandung Polytechnic
Bandung
01.2009 - 04.2012

Skills

Wellhead Installations

Mobile Contact

+62 812 1080 0132

Industry Training And Qualifications

  • H2S Training, Rutledge
  • Supporting Service tools training, FMCTU
  • Advanced Pressure Tools, FMC Technologies University
  • Foundation Service Skill, FMC Technologies University
  • Gate Valves & Actuator, FMC Technologies University
  • Hydratight (Hydraulic power torque tool) training, Singapore
  • FOET & Travel Safety By Boat-Code 5808 (OPITO)
  • T-Huet with EBS-Code 5996 (OPITO), Samson Tiara
  • Crescent Pressure Testing Level 1, 2, & 3, FMC Santana PEI, 2013
  • Service Skills Training, FMC Santana PEI, 2013

Timeline

Field Service Technician

FMC Technologies
01.2012 - Current

Diploma Degree (D3) - Mechanical Engineering

Bandung Polytechnic
01.2009 - 04.2012
Riki Rizki MaulanaField Service Technician