Summary
Overview
Work History
Education
Skills
Certification
Timeline
Hi, I’m

ROMMY ROMANZA

Sr. Mechanical Engineering Construction
Griya Serdang Indah Blok K1 No.9 RT. 01 RW. 09 Kel. Margatani Kec. Kramatwatu Kab. Serang Banten
ROMMY ROMANZA

Summary

Competent Mechanical proficient in overseeing contractors installing mechanical equipment and keeping all work in strict compliance with applicable codes and standards. Organized and dependable successful at managing multiple priorities. Experienced Mechanical Engineering Construction with over 10 years of experience in Oil and Gas industry.

Overview

14
years of professional experience
1
Certification
1
Language

Work History

PT. TIMAS SUPLINDO Offshore Division
Belida Extension Project – Medco Energy

Mechanical Superintendent
02.2022 - Current

Job overview

  • Prepare Readiness Mechanical Equipment Installation at Platform
  • Installation Mechanical Equipment at Platform
  • Prepare Mechanical Completion, Pre-Commissioning and Commissioning check list for Mechanical Equipment
  • Prepare Mechanical Equipment Installation Report Progress
  • Performing SAT Chemical Injection Package
  • Prepare Operation Test Procedure (OTP) Pedestal Crane, Diesel System, Closed Drain System, Chemical Injection System
  • Performing Pre-Commissioning for Mechanical Equipment
  • Performing Commissioning (Operation Test) of Pedestal Crane
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Prepare List Material Ship Loose for Carry Over work and Hook Up.
  • Reported on work progress to manager and incorporated feedback to maintain tight schedules.

PT. GUNANUSA UTAMA FABRICATORS
Yadana Warranty Claim (Modification Sewage Treatment Package) - Total E&P Myanmar

Sr. Mechanical Engineer
04.2021 - 10.2021

Job overview

  • Update P&ID as per Site survey and recommendation from Vendor's package
  • Update Isometric for modification existing GRE Pipes
  • Prepare Isometric for new spool pipe as per modification concept
  • Update Equipment Layout and Equipment Support Drawing
  • Prepare for GA Drawing Filter Package
  • Prepare MTO for modification Sewage Treatment Package
  • Prepare Task Sheet for modification jobs at site (offshore)
  • Prepare Schedule Plan for modification jobs
  • Technical Clarification Meeting with CPY (TEPM)
  • Prepare List Material Ship Loose and monitoring the readiness of material

PT. GUNANUSA UTAMA FABRICATORS
Saka Sidayu - Saka Energi Indonesia

Sr. Mechanical Engineer
01.2020 - 03.2021

Job overview

  • Review Mechanical Equipment documents from Detail Engineering (Datasheets, Specification, PID, Equipment Layout, Request for Quotation, TBE and Handling Study)
  • Review Vendor's Quotation from for Mechanical Equipment
    (Drain Pump, Caisson Pump, Vent Tip, Nitrogen Bottle Rack, Material Handling)
  • Technical Meeting with CPY for clarification vendor's queries (selection vendor)
  • Review Vendor Document for Mechanical Equipment
  • Review progress report from Vendor Mechanical Equipment
  • Witness Factory Acceptance Test for Drain Pump, Caisson Pump and Nitrogen Bottle Rack
  • Inspection Mechanical Equipment at Warehouse (Yard)
  • Cross Check for Equipment Layout & Equipment Support with actual Mechanical Equipment Size
  • Installation for Mechanical Equipments (Telescopic Crane, Chemical Injection Package, Drain Pump, Caisson Pump, Vent Tip, Nitrogen Bottle Rack, Material Handling, Pressure Vessel)

PT. GUNANUSA UTAMA FABRICATORS
Yadana Warranty Claim - Total E&P Myanmar

Mechanical Engineer
01.2019 - 12.2019

Job overview

Modification Hydrophore Bladder and Sewage Treatment Package)

  • Prepare procedure for replacement rubber of Hydrophore Bladder
  • Prepare Task sheet for offshore jobs (Replacement rubber of Hydrophore Bladder)
  • Technical Clarification Meeting with CPY
  • Replacement rubber of Hydrophore Bladder at Yadana Offshore (Myanmar)
  • Site Survey for modification Sewage Treatment Package
  • Technical Meeting with CPY for modification concept of Sewage Treatment Package
  • Prepare MTO and Technical document/drawing for modification Sewage Treatment Package
  • Fabrication additional equipment (Water Filter Skid)
  • Fabrication GRE Pipes Spool and Stainless Steel Pipes Spool

PT. GUNANUSA UTAMA FABRICATORS
Tender (Bidding)

Mechanical Engineer
07.2017 - 12.2018

Job overview

  • Prepare RFQ for Mechanical & Safety Equipment for Project ONGC- Cluster 7 & HEERA
  • Prepare RFQ for Mechanical & Safety Equipment for Saipem MERAKES (Slug Catcher & Pig Trap)
  • Prepare RFQ for Mechanical & Safety Equipment for Chandra Asri (PA Reservoir & Separator)
  • Prepare RFQ for Mechanical & Safety Equipment for Project Petronas (Condensate Storage)

PT. GUNANUSA UTAMA FABRICATORS
Zawtika 1C - PTT Exploration and Production Thailand

Mechanical Engineer
11.2016 - 06.2017

Job overview

  • Review Mechanical document produced by Detail Engineering
    (Datasheets, Specification, PID, Equipment Layout and Handling Study)
  • Inspection Mechanical Equipment, when it arrives at Warehouse (Yard)
  • Cross Check for Equipment Layout & Support with actual Equipment Size (GA Drawing) before Installation on
    platform (Yard)
  • Installation for Mechanical Equipments (Pedestal Crane, Chemical Injection Package, Drain Pump, Diesel Transfer Pump, Material Handling, and Pressure Vessel)
  • Closing Punchlists of Mechanical and Safety Equipment
    (Punchlists during fabrication at Manufacturer and Installation on Yard)

PT. GUNANUSA UTAMA FABRICATORS
PHE West Madura Offshore - Pertamina Hulu Energi

Mechanical Engineer
09.2015 - 10.2016

Job overview

  • Review Mechanical document produced by Detail Engineering
    (Datasheet, Specification, PID, Equipment Layout, Request for Quotation, TBE and Handling Study)
  • Review Vendor's Quotation from for Mechanical Equipment
    (Nitrogen Bottle Rack,CO2 Snuffing Package, Vent Tip, and Material Handling)
  • Review Vendor Document for Mechanical Equipment
  • Review progress report from Vendor Mechanical Equipment
  • Fabrication Disposal Caisson, Sump Box Tank and Diesel Storage Tank
  • Witness Factory/Site Acceptance Test for Drain Pump.
  • Inspection Mechanical Equipment, when it arrives at Warehouse (Yard)
  • Cross Check for Equipment Layout & Support with actual Mechanical Equipment Size (GA Drawing)
  • Installation for Mechanical Equipments (Pedestal Crane, Chemical Injection Package, Drain Pump, Caisson Pump, Vent Tip, Nitrogen Bottle Rack, CO2 Snuffing Package, Pressure Vessel)

PT. GUNANUSA UTAMA FABRICATORS
Tender (Bidding)

Mechanical Engineer
05.2014 - 08.2015

Job overview

  • Prepare RFQ for Mechanical & Safety Equipment for Project PHE WMO
  • Prepare RFQ for Mechanical & Safety Equipment for Yadana Badamyar
  • Prepare RFQ for Mechanical & Safety Equipment for Husky CNOOC Madura Limited

PT. GUNANUSA UTAMA FABRICATORS
Sisinubi 2B & Peciko 7B - Total E&P Indonesie

Mechanical Precommissioning Engineer
09.2013 - 04.2014

Job overview

  • Perform Check List for Mechanical Equipment
    (Pressure Vessel, HVAC, Chemical Injection Package, and Vent Flare Package, Open Drain Pump, Closed Drain Pump, Offloading Pump, Diesel Oil Transfer Pump and Pedestal Crane)
  • Alignment for Offloading Pump, Disposal Tube Pump and Diesel Oil Transfer Pump
  • Load Test for Mechanical Handling Equipment ( Monorail Trolley Hoist, Davit Crane and Pad Eyes
  • Closing Punchlists of Mechanical and Safety Equipments
    (Punchlists during fabrication at Manufacturer and Installation on Yard)

PT. GUNANUSA UTAMA FABRICATORS
Sisinubi 2B & Peciko 7B - Total E&P Indonesie

Mechanical Engineer
01.2012 - 08.2013

Job overview

  • Review Mechanical document produced by Detail Engineering
    (Datasheets, Specification, PID, Equipment Layout, Request for Quotation, TBE and Handling Study)
  • Review Vendor's Quotation from for Mechanical Equipment
    (HVAC,Chemical Injection Package and Vent-Flare Package)
  • Review Vendor Document for Mechanical Equipment
  • Review progress report from Vendor Mechanical Equipment
  • Factory Acceptance Test for Chemical Injection Package and Vent-Flare Tip)
  • Installation Chemical Injection Package, HVAC Equipment and Vent-Flare Tip on Platform (Yard)
  • Hook-up and Carry Over works Mechanical and Safety at offshore Sisinubi
  • Installation Disposal Tube Pump (Offshore)
  • Replacement Vent Tip at offshore Sisinubi

PT. GUNANUSA UTAMA FABRICATORS

Management Trainee
11.2010 - 12.2011

Job overview

  • Monthly Report and presentations
  • Assist Final Document Dossier (Mechanical Document) Project HESS Ujung Pangkah Limited.
  • Acted with integrity, honesty and knowledge to promote culture of company.
  • Sat in on disciplinary hearings to learn about conflict resolution in workplace.

Education

Universitas Sultan Ageng Tirtayasa

Bachelor of Engineering from Mechanical Engineering

Skills

Planning and Coordination

undefined

Certification

TROPICAL BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING WITH EMERGENCY BREATHING SYSTEM AND TRAVEL SAFELY BY BOAT, SMTC GLOBAL (OPITO) Expired Date : 21 March 2023

Timeline

Mechanical Superintendent

PT. TIMAS SUPLINDO Offshore Division
02.2022 - Current

Sr. Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
04.2021 - 10.2021

Sr. Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
01.2020 - 03.2021

Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
01.2019 - 12.2019

Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
07.2017 - 12.2018

Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
11.2016 - 06.2017

Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
09.2015 - 10.2016

Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
05.2014 - 08.2015

Mechanical Precommissioning Engineer

PT. GUNANUSA UTAMA FABRICATORS
09.2013 - 04.2014

Mechanical Engineer

PT. GUNANUSA UTAMA FABRICATORS
01.2012 - 08.2013

Management Trainee

PT. GUNANUSA UTAMA FABRICATORS
11.2010 - 12.2011

Universitas Sultan Ageng Tirtayasa

Bachelor of Engineering from Mechanical Engineering
ROMMY ROMANZASr. Mechanical Engineering Construction