Engineering professional with significant experience in control system design and implementation. Known for developing innovative solutions that enhance system performance and reliability. Excellent team player with focus on collaboration and adaptability to meet dynamic project needs. Proficient in PLC programming, HMI design, and system integration.
A. OPP Project (TOTAL EP Borneo)
B. Badamyar Project (TOTAL EP Myanmar)
C. Condensate Fraction Plant Project (SGFL Bangladesh)
D. SSS Upgrade (VICO Indonesia)
A. Turbine Compressor Surge Prevention Control Application (CHEVRON Balikpapan)
A. Kharyaga Project (TOTAL EP Russie)
B. FWP Project (TOTAL EP Myanmar)
C. MLJ3 Project (TOTAL EP Borneo)
Implement PID controller to control the frequency of the electricity grid (50 Hz) with power meter as the sensor and battery power output as the actuator.
Microsoft Office
undefinedPT200 SILworX-HIMax Engineer part 1
Zenon Supervisor Standard
PT250 SILworX-HIMax Engineer part 2 plus Communication
Advanced Signalling 1 (CBTC & ETCS)
PT200 SILworX-HIMax Engineer part 1
Rockwell Trusted Safety System T8000