Project Manager MEP
PT. ZHONGMAO ENGINEERING INDONESIA
05.2024 - Current
Company Overview: EPC Project Name: Apartement Asthana Kemang, Jakarta
Lead Planning and Implementation and budgeti plan MEP work in Site project
Coordination with Construction Management and Owner Team for Review, Value engineering and Variation Order (VO)
Make and coordination Time schedule, Progress mapping and payment
Project Budget calculation
Lead and monitoring Health Safety, Quality and working progress
EPC Project Name: Apartement Asthana Kemang, Jakarta
Construction Manager (CSA - MEP)
PT. INDOKOMAS BUANA PERKASA
08.2022 - 04.2024
Company Overview: EPC
Coordination with team for Engineering, Procurement, Construction and Test comm Team
Coordination with Construction Management and Owner Team
Make Action plan for each work implementation
Coordination with all subcontractor for manpower plan and schedule at L1, L2 and L3 step of work
Coordination with all LLE vendor for interface plan and schedule
Make daily, weekly and 2 weekly report
EPC
PT. DWIMITRA EKATAMA MANDIRI
06.2020 - 08.2022
Company Overview: EPC
Coordination with team for Engineering, Procurement and Construction
Arrange Engineer team for Shop drawing, Material Approval, Method Statement, ITP
EPC
Project Name: DC Pusintek DEPKEU RI
Project Name: AWS (Amazon Web Service) Data Centre AWS 064 Cikarang
Project Name: PURE DC (Data Centre)
Site Manager MEP (North Tower)
PT. BINTAI KINDENKO ENGNEERING INDONESIA (BINKEI)
02.2019 - 03.2020
Company Overview: Construction
Coordination, arrange and implemetation at site
Make sure Site location as safety standard before start to work
Make Material Take Off (MTO)
Coordination with other Section (Civil structure and architect)
Arrange meeting with subcontractor
Make Action Plan (twoweek), mapping instalation, and Site Proggress
Construction
Project Name: INA one Project
Coordinator MEP
OBAYASHI-SHIMIZU-JAYA JV
01.2017 - 01.2019
Company Overview: Construction
Coordination Design with plan consultan
Cordination with Structure and architec design
Coordinationandarrange Combine schedule and composite drawng
Coordination about FAT and SAT for Mechanical electrical Equipment
Chek for Testing Comissioning of Switchgear, LVMDB, SDB Panel
Check visual, Mechanic, insulation resistance for busbar
Check CT and VT, relay protection and metering
Check CB analyser, measurement contact resistance, elcrical control wiring
Check interlook service and isolated position and operation
Coordination with QA/QC about design change (FCN &DCN), check list, variation order
Construction
Project Name: Mass Rapid Trans (MRT) CP 103
Building Name: Station MRT Sisingamangaraja, Statio, Blok M, Station MRT Blok A, Station MRT Haji Nawi, RSS (substation Blok A)
MEP Manager (Building Section)
PT. SUMITOMO CORP.
09.2013 - 12.2016
Company Overview: Construction
Review Design MEP system
Make The shop Drawing
Coordination Mechanical/Electrical Work at Site
Coordination with all stakeholder, Owner, consultant, subcontractor and suplier
Construction
Project Name: Railway Electrification and DD Track Commuter Line Bekasi - Cikarang
Building Name: Train StationBuilding, Signal Cabin, Substation Building (5 location)
Electrical Design Engineer
PT. PRAPANCA ENGINEERING
09.2012 - 09.2013
Company Overview: Planning Consultant MEP
Arrange and Calcullation Load of Electrical Power
Make and arrangethe Lighting Fixture, Panel, Power Outlet Installation and Position
Coordination about Goverment Regulation for Power
Calculation for Cabel Feeder, Breaker, Lighting Lument
Coordination with Structure Section for Shaft Position, Raiser Cabel Rack, Busduct
Coordination with Architec section about arrange the installation Above Ceiling, Room Function
Coordination With Landscape section about Run underground Cable, Garden Lighting Position, and Other external work
Planning Consultant MEP
Building Name: Green Central City, Apartement, Glodok, Jakarta
Electrical Site Manager
PT. BALFOUR BEATTY SAKTI (BBS)
09.2011 - 09.2012
Company Overview: Construction
Coordination to connection Medium Voltage 8660 kVA from Goverment Power (PLN)
Coordination to installation Power Plan equiptment( MV cubicle system voltage 20kV, Transformer 6 unit x 2000 kVA, Generator 4 unit x 2000 kVA, LV Panel, Distribution Panel, Busduct)
Make sure and following equiptment test (high Voltage test, injection, megger, phase rotation, torque)
To manage and coordination with our supervisor and subcontractor the Electrical Work (Power plan & lighting) and Electronic Work (FA, PA, CCTV, BMS).
Construction
Building Name: World Trade Centre II, Office Tower
Jr. Site Engineer MEP
PT. TOTAL BANGUN PERSADA, Tbk
06.2007 - 09.2011
Company Overview: Construction
Design Special Lighting for Museum Area, Stage Area, Reharsal, Dome concert area
Design and Re-calculation HVAC system at Museum area, Apartment Area
Coordination with Govrment Power, Goverment Fire Fighting Division, Goverment water supply
Supervise and arrange MEP Work at site
Arrange the Testing Commissioning For Electrical work ( Transformer, Generator, MV Panel, LV Panel)
Electronic Work (FA system, Sound system, Building Automatic System)