Sefrizal Tanjung

Sefrizal Tanjung

Project Manager MEP
Bekasi,West Java

Summary

I am hard working, high dedicate, high motivate, until now I still work at general construction company

Overview

30
30
years of professional experience
7
7
years of post-secondary education
2
2
Certifications

Work History

Project Manager MEP

PT. ZHONGMAO ENGINEERING INDONESIA
05.2024 - Current
  • Company Overview: EPC Project Name: Apartement Asthana Kemang, Jakarta
  • Lead Planning and Implementation and budgeti plan MEP work in Site project
  • Coordination with Construction Management and Owner Team for Review, Value engineering and Variation Order (VO)
  • Make and coordination Time schedule, Progress mapping and payment
  • Project Budget calculation
  • Lead and monitoring Health Safety, Quality and working progress
  • EPC Project Name: Apartement Asthana Kemang, Jakarta

Construction Manager (CSA - MEP)

PT. INDOKOMAS BUANA PERKASA
08.2022 - 04.2024
  • Company Overview: EPC
  • Coordination with team for Engineering, Procurement, Construction and Test comm Team
  • Coordination with Construction Management and Owner Team
  • Make Action plan for each work implementation
  • Coordination with all subcontractor for manpower plan and schedule at L1, L2 and L3 step of work
  • Coordination with all LLE vendor for interface plan and schedule
  • Make daily, weekly and 2 weekly report
  • EPC

PT. DWIMITRA EKATAMA MANDIRI
06.2020 - 08.2022
  • Company Overview: EPC
  • Coordination with team for Engineering, Procurement and Construction
  • Arrange Engineer team for Shop drawing, Material Approval, Method Statement, ITP
  • EPC
  • Project Name: DC Pusintek DEPKEU RI
  • Project Name: AWS (Amazon Web Service) Data Centre AWS 064 Cikarang
  • Project Name: PURE DC (Data Centre)

Site Manager MEP (North Tower)

PT. BINTAI KINDENKO ENGNEERING INDONESIA (BINKEI)
02.2019 - 03.2020
  • Company Overview: Construction
  • Coordination, arrange and implemetation at site
  • Make sure Site location as safety standard before start to work
  • Make Material Take Off (MTO)
  • Coordination with other Section (Civil structure and architect)
  • Arrange meeting with subcontractor
  • Make Action Plan (twoweek), mapping instalation, and Site Proggress
  • Construction
  • Project Name: INA one Project

Coordinator MEP

OBAYASHI-SHIMIZU-JAYA JV
01.2017 - 01.2019
  • Company Overview: Construction
  • Coordination Design with plan consultan
  • Cordination with Structure and architec design
  • Coordinationandarrange Combine schedule and composite drawng
  • Coordination about FAT and SAT for Mechanical electrical Equipment
  • Chek for Testing Comissioning of Switchgear, LVMDB, SDB Panel
  • Check visual, Mechanic, insulation resistance for busbar
  • Check CT and VT, relay protection and metering
  • Check CB analyser, measurement contact resistance, elcrical control wiring
  • Check interlook service and isolated position and operation
  • Coordination with QA/QC about design change (FCN &DCN), check list, variation order
  • Construction
  • Project Name: Mass Rapid Trans (MRT) CP 103
  • Building Name: Station MRT Sisingamangaraja, Statio, Blok M, Station MRT Blok A, Station MRT Haji Nawi, RSS (substation Blok A)

MEP Manager (Building Section)

PT. SUMITOMO CORP.
09.2013 - 12.2016
  • Company Overview: Construction
  • Review Design MEP system
  • Make The shop Drawing
  • Coordination Mechanical/Electrical Work at Site
  • Coordination with all stakeholder, Owner, consultant, subcontractor and suplier
  • Construction
  • Project Name: Railway Electrification and DD Track Commuter Line Bekasi - Cikarang
  • Building Name: Train StationBuilding, Signal Cabin, Substation Building (5 location)

Electrical Design Engineer

PT. PRAPANCA ENGINEERING
09.2012 - 09.2013
  • Company Overview: Planning Consultant MEP
  • Arrange and Calcullation Load of Electrical Power
  • Make and arrangethe Lighting Fixture, Panel, Power Outlet Installation and Position
  • Coordination about Goverment Regulation for Power
  • Calculation for Cabel Feeder, Breaker, Lighting Lument
  • Coordination with Structure Section for Shaft Position, Raiser Cabel Rack, Busduct
  • Coordination with Architec section about arrange the installation Above Ceiling, Room Function
  • Coordination With Landscape section about Run underground Cable, Garden Lighting Position, and Other external work
  • Planning Consultant MEP
  • Building Name: Green Central City, Apartement, Glodok, Jakarta

Electrical Site Manager

PT. BALFOUR BEATTY SAKTI (BBS)
09.2011 - 09.2012
  • Company Overview: Construction
  • Coordination to connection Medium Voltage 8660 kVA from Goverment Power (PLN)
  • Coordination to installation Power Plan equiptment( MV cubicle system voltage 20kV, Transformer 6 unit x 2000 kVA, Generator 4 unit x 2000 kVA, LV Panel, Distribution Panel, Busduct)
  • Make sure and following equiptment test (high Voltage test, injection, megger, phase rotation, torque)
  • To manage and coordination with our supervisor and subcontractor the Electrical Work (Power plan & lighting) and Electronic Work (FA, PA, CCTV, BMS).
  • Construction
  • Building Name: World Trade Centre II, Office Tower

Jr. Site Engineer MEP

PT. TOTAL BANGUN PERSADA, Tbk
06.2007 - 09.2011
  • Company Overview: Construction
  • Design Special Lighting for Museum Area, Stage Area, Reharsal, Dome concert area
  • Design and Re-calculation HVAC system at Museum area, Apartment Area
  • Coordination with Govrment Power, Goverment Fire Fighting Division, Goverment water supply
  • Supervise and arrange MEP Work at site
  • Arrange the Testing Commissioning For Electrical work ( Transformer, Generator, MV Panel, LV Panel)
  • Electronic Work (FA system, Sound system, Building Automatic System)
  • Mechanical work (Heat exchanger system, Exhaust Fan, Intake Fan, Smoke Fan, Pressure Rise Fan, AC, Elevator, Escalator)
  • Plumbing Work (Sum pump system, PRV system, Booster pump, Fire Hydrant Pump)
  • Construction
  • Building Name: Graha Reformed Milennium, Central Park

Site Manager MEP

RINKAI-ADHI KARYA-MARUBENI JO
02.2006 - 04.2007
  • Company Overview: Construction
  • Coordination to Installation 6 unit Generator 2500 KVA
  • Coordination and arrange to Installation Street Lighting, Garden Lighting
  • Coordination and arrange installion of Plumbing and Fire Fighting system
  • Supervise and arrange MEP Work at site
  • Do teting commssioning
  • Construction
  • Project Name: Sea Port (Pelindo II)
  • Building Name: Power House, Portland and Jetty

Ass. Site Engineer

PT. TEKHNIK UMUM
12.2002 - 01.2006
  • Company Overview: Construction
  • Coordination and Supervise MEP work at site
  • Make and arrange daily Report, Weekly Report
  • Make the Weely Schedule
  • Construction
  • Building Name: Project Name: Minangkabau Airpot Cons. Project
  • Passenger Terminal Building, Maintenance Hangar, Substation (7 Location), Opretaion Builvding, Office Building, Fuel Tank Area, GSE Maint. Buiding, Main Substation, Control Tower

Ass. Site Engineer

PT. SANTIKA CONSULINDO
05.1997 - 04.2000
  • Company Overview: Consultant
  • Design about Mechanical and Plumbing system
  • Make design drawing for electrical system
  • Make Breakdown Cost
  • Coordination with Goverment Power, Govermwnt Water Supply
  • Consultant

Power Plan Maintenance Spv

PT. INTI INDORAYON UTAMA
01.1995 - 01.1997
  • Company Overview: Pulp and Paper Factory
  • Check and Maintenance for SteamTurbine, Boiler and Generator
  • Make Report for Running Power Distribution Machine
  • Check the Fuel, Voltage Ballancing, Voltage fluctuation
  • Pulp and Paper Factory

Education

AMd - Technich of energi

Polytechnic USU Medan
01.1990 - 04.1993

S1 - Electrical & electronic Engineer

Extension S1 USU Medan
01.1995 - 04.1998

Skills

AUTO CAD

Certification

Sertifikasi Tekhnis, PT. Total Bangun Persada, Tbk, 2009

Living Location

Perum MekarsariPermai C1/29 Tambun, Bekasi, West Java

Personal Information

  • Date of Birth: 09/15/72
  • Gender: Male
  • Marital Status: Married

Resume Summary

MEP Project Manager, more than 20 years, Electrical / Mechanical, Construction, Senior, Degree

Timeline

Project Manager MEP

PT. ZHONGMAO ENGINEERING INDONESIA
05.2024 - Current

Construction Manager (CSA - MEP)

PT. INDOKOMAS BUANA PERKASA
08.2022 - 04.2024

PT. DWIMITRA EKATAMA MANDIRI
06.2020 - 08.2022

Site Manager MEP (North Tower)

PT. BINTAI KINDENKO ENGNEERING INDONESIA (BINKEI)
02.2019 - 03.2020

Coordinator MEP

OBAYASHI-SHIMIZU-JAYA JV
01.2017 - 01.2019

MEP Manager (Building Section)

PT. SUMITOMO CORP.
09.2013 - 12.2016

Electrical Design Engineer

PT. PRAPANCA ENGINEERING
09.2012 - 09.2013

Electrical Site Manager

PT. BALFOUR BEATTY SAKTI (BBS)
09.2011 - 09.2012

Jr. Site Engineer MEP

PT. TOTAL BANGUN PERSADA, Tbk
06.2007 - 09.2011

Site Manager MEP

RINKAI-ADHI KARYA-MARUBENI JO
02.2006 - 04.2007

Ass. Site Engineer

PT. TEKHNIK UMUM
12.2002 - 01.2006

Ass. Site Engineer

PT. SANTIKA CONSULINDO
05.1997 - 04.2000

Power Plan Maintenance Spv

PT. INTI INDORAYON UTAMA
01.1995 - 01.1997

S1 - Electrical & electronic Engineer

Extension S1 USU Medan
01.1995 - 04.1998

AMd - Technich of energi

Polytechnic USU Medan
01.1990 - 04.1993
Sefrizal TanjungProject Manager MEP