Summary
Overview
Work History
Education
Skills
TRAINING
Disclaimer
Timeline
Generic
Subagyo Sabiun

Subagyo Sabiun

Engineer Telecomunication
Depok

Summary

More than 10 years experiance on optical network, specially SDH, DWDM and GPON.

Mastering on network planning, installation, commisioning and trouble shooting.

Familiar with NMS, like T2000, U2000, MN3100

Overview

29
29
years of professional experience

Work History

Lead Landline Asianet Bandung Region

PT. ZTE
09.2025 - Current
  • Corrective Maintenance (CM) and Preventive Maintenance (PM)
  • Monitoring TTMS application, suppoted teams and resolved the ticket
  • Supported Patrol and Rectification teams
  • Supported network relocation work

Site Supervisor

PT. YOFC
01.2023 - Current
  • FTTH EMR PROJECT JABOTABEK
  • FTTH 1700 HP West Jakarta area :
  • - Pegadungan RW. 04
  • - Pegadungan RW. 05
  • - Pegadungan RW. 08
  • - Pegadungan RW. 11
  • FTTH 3000 HP Central Jakarta area :
  • - Kebon Melati RW. 7
  • - Kebon Melati RW. 8
  • - Kebon Melati RW. 9
  • - Kebon Kosong RW. 7
  • - Kebon Kosong RW. 8
  • - Kebon kosong RW. 9
  • - Kebon Kosong RW. 10
  • FTTH 6000 HP Bekasi area :
  • - Taman Cikarang Indah 1
  • - Griya Persada Indah
  • - Telaga Harmony
  • - Telaga Pasir Raya
  • - Sukaraya Regency
  • - Sukaraya Asri
  • - Grand Permata Cikarang
  • Department: Project

Site Engineer

PT. Fiberhome Technologies Indonesia
07.2022 - 12.2022
  • STTF PT3/ PT2 PROJECT WITEL AMBON
  • Overseeing project STTF PT2/PT3 Witel Maluku Seram island, there are :
  • - LOP Kampus Said Perintah Masohi
  • - LOP Kantor Pengadilan Masohi
  • - LOP Kairatu
  • - LOP Desa Rutah Masohi
  • - LOP Kilo 1 Masohi
  • Controling subcont & support on site
  • Cooperation with Telkom Akses (TA) for materials and technies
  • Collecting data from site
  • Solving any problem on site
  • Daily & weekly reporting to Project Manager (PM) Regional 7
  • CT/ UT with TA & WITEL Ambon team
  • Department: Project

Coordinator Area

PT. SUG Networks
09.2021 - 12.2021
  • SURVEY OSP SURGE LINK AREA DAOP 7 MADIUN
  • Created RAB & Timeplan for support project
  • Controling team & support on site
  • Cooperation with KAI Daop 7 team for mapping area
  • Leading field engineer and reporting from site
  • Solving any problem on site
  • Daily & weekly reporting to Project Manager (PM)
  • Department: Project

Project Manager

PT. Bangun Utility Ekakarya
09.2020 - 12.2020
  • FTTH TAMAN BUAH KUTABUMI LINK NET MIGRATION
  • Created RAB & Timeplan for support project
  • Controling team & support on site
  • Cooperation with Link Net team for technical spec
  • Leading field engineer and reporting from site
  • Creating work plan and prepare team for FO cut
  • Rectifikasi core and t-shoot core bending
  • Weekly meeting with customer (LINK NET)
  • Solving any problem on site
  • RECOVERY FO CUT TELKOM JAKTIM
  • Cooperation Telkom coodinator
  • Scheduled PIC team for Telkom order
  • Operational supported for working
  • Invoiced to Telkom
  • Reporting to management PT. BUE
  • Department: Project

Site Manager

PT. Ketrosden Triasmitra
09.2019 - 08.2020
  • OSP Inland segment Alor-1 to Alor-3 Maritaing NTT Project
  • Controling subcontractor on site
  • Cooperation with Moratelindo team for technical spec
  • Leading field engineer and reporting from site
  • Leading and reporting patroly team
  • Creating work plan and prepare team for FO cut
  • Rectifikasi core and t-shoot core bending
  • Weekly meeting with customer (MTI)
  • Solving any problem on site
  • Daily & weekly reporting to Project Manager (PM)
  • Department: Project

Document Control

Koperasi Karyawan Moratelindo (KKM)
05.2019 - 08.2019
  • Create BAST FTTH, FTTB, FTTO project :
  • Collected data from field engineer
  • Completed foto, grafik and summary data
  • Print out document as template from Moratelindo
  • Approval request to PM Project, Operation and QA Moratelindo
  • Department: Project

Specialist Engineer

PT. Satunol Mikro Sistem
05.2018 - 08.2018
  • Telecommunication Panel For GIS Grati 150 KV (Pasuruhan) & GIS 150 KV Bekasi II/ Sumarecon) Project
  • SITE SURVEY
  • PROJECT IMPLEMENTATION
  • ENERGIZE & REPORT
  • Factory Acceptance Test (FAT) in Siemens Workshop Pulogadung
  • Multiplexer (MUX) Connection Master (CM)
  • TeleProtection (TP) SWT3000
  • Department: Technical

Testing DWDM Engineer

PT. NEC
12.2016 - 05.2018
  • INDONESIA GLOBAL GATEWAY (IGG) SS# MAKASAR – MANADO TELKOM PROJECT
  • TPND In Station & Segment Test
  • WME In Station & Segment Test
  • ILA In Station & Segment Test
  • Reporting
  • UPGRADE LINK JAKABARING INDOSAT RING ON GLOBAL SWITCH SINGAPORE BUILDING
  • Rack 19 & power intallation
  • Inserting card TPND, WME
  • Power on & commissioning equipments
  • Testing link SGP - TJ PAKIS
  • UPGRADE LINK JASUKA TELKOM RING ON STO PONTIANAK
  • Rack 19 & power intallation
  • Inserting card TPND, WME
  • Power on & commissioning equipments
  • Testing link BTM - PTK - BB
  • UPGRADE LINK PAMASUKA RING TELKOM ON STO MAKASAR
  • Rack 19 & power intallation
  • Inserting card TPND, WME
  • Power on & commissioning equipments
  • Testing link MKSR - SBY, MKSR - BANJARMASIN
  • UPGRADE LINK PAMASUKA RING TELKOM ON STO SORONG BUILDING
  • Rack 19 & power intallation
  • Inserting card TPND, WME
  • Power on & commissioning equipments
  • Testing link JAYAPURA - SORONG, SORONG - PAK PAK
  • Department: Technical

Specialist Transmission

PT. Bakrietelecom tbk.
04.2012 - 12.2015
  • Mux Cross Connection Configuration PDH or SDH level
  • Configure link from BSC Port to BTS port
  • Configure link from MSC Port to another Port MSC
  • Configure compression link VMux & Veraz
  • Configure Interconnection link from MSC Port BTEL to MSC Port another Operator
  • Configure link from MSC Port to VAS equipment ( RBT, IVR, etc)
  • Configure link for Intercity
  • Upgrade Bandwith MPLS link
  • Coorperate with LL Provider
  • Insert NE & Board
  • Integrate new NE to NMS
  • Access/ login via NMS or console NE
  • Add & active new board in NE existing
  • Connected board to another board with patchcord SDH level
  • Create SDH Ring protection on NMS
  • Create/ Delete trail at OSN
  • Rename trail & reporting
  • Troubleshooting
  • Standby 24 our, ready called by surveilant team
  • Analize link problem & fix solved
  • Reroute link via NMS
  • Coorperate with field engineer BTEL & another operator
  • Supported Local Loopback
  • Upload/ download data from NE to server
  • Maintenance LL for intercity link
  • Reporting result activity to manager
  • Department: NOC Telco

NOC Access engineer

PT. Bakrietelecom tbk.
09.2008 - 03.2012
  • Mux Cross Connection Configuration PDH or SDH level
  • Configure link from BSC Port to BTS port
  • Configure link from MSC Port to another Port MSC
  • Configure compression link VMux & Veraz
  • Configure Interconnection link from MSC Port BTEL to MSC Port another operator
  • Configure link from MSC Port to VAS equipment ( RBT, IVR, etc)
  • Configure link for Intercity
  • Insert NE & Board
  • Integrate new NE to NMS
  • Add & active new board in NE existing
  • Connected board to another board with patchcord SDH level
  • Create SDH Ring protection on NMS
  • Create/ Delete trail at OSN
  • Rename trail & reporting
  • Department: NOC Telco

Telco NOC Fault, Network Monitoring Center

PT. Bakrie Telecom
08.2006 - 08.2008
  • BSS Monitoring
  • Routine monitoring BTS & BSC alarms (Huawei & Nortel subscriber)
  • Cleared alarms by warm reset board on NMS tools
  • Called to field network engineer & created ticket.
  • Support field engineer to solved faulty
  • Closed ticket & reported.
  • TransmissionMonitoring
  • Routine monitoring link alarms from Radio Microwave & Fiber optic equipments ( Ceragon, Ericsson, NEC, Nortel & Huawei)
  • Check the board performance of equipment.
  • Loopback action by NMS to find problem
  • Department: NOC Telco

Channel Management & POP Material Support

PT. Bakrie Telecom
01.2004 - 07.2006
  • Outlet management
  • Manage outlets or seluler shop with product BTEL
  • Delivery POP Material to outlet or seluler shop
  • Record to database & reporting
  • Exhibition & Market event
  • Booth even in Mall or PRJ Kemayoran
  • Cooperate with Event organization
  • Department: Retail Sales

Installation and Maintenance Leader Jakarta area

PT. Ratelindo
01.2002 - 12.2003
  • Coordinate field technician
  • Prepare & record WO for field tech
  • Supported material was needed field tech
  • Reporting
  • Closing & reporting WO
  • Meeting with supervisor & another team
  • Department: Network Services Maintenance

Field Installation and Maintenance Engineer

PT. Ratelindo
07.1996 - 12.1999
  • Surveillance Preparation for Multi/ Single Subscribers Unit Installation in Office, Public Telephone and Rural Area
  • Signal strength survey
  • Yagi antenna placement survey
  • Coaxial cable path survey
  • Power and CME requirement survey
  • Telephone line distribution survey
  • Install outdoor and indoor unit
  • Register the subscriber unit in order to connect with the MSC and ready to use
  • Maintenance and Troubleshoot Multi/ single Subscribers Unit
  • Routine cleaning the indoor unit
  • Check Receive Signal Level quality
  • Troubleshoot outdoor and indoor unit
  • Reporting
  • Report Surveillance result to Supervisor
  • Report Installation result to Supervisor
  • Report Maintenance and Troubleshoot result to Supervisor
  • Department: Network Services Maintenance

Education

Bachelor Degree - Teknik Informatika

STMIK Jayakarta

Senior High School Degree - Telecommunication

STM Negeri Pembangunan Yogyakarta
01.1996

Junior High School Degree - undefined

SMP Negeri IV Yogyakarta
01.1992

Elementary School Degree - undefined

SD Negeri Jeblog Bantul
01.1989

Skills

Familiar Windows application

TRAINING

  • April 1997 RTI System
  • As Participant
  • Organized by PT. Ratelindo
  • Jakarta
  • April 1999 Standar Instalasi bagi Teknisi
  • September 2007 CDMA BSS Product (EVDO)
  • Organized by PT. Bakrietelecom and Huawei
  • February 2010 Optix iManager T2000 Veritas Standby
  • May 2010 Optix Metro 1000 & OSN 3500
  • Makasar
  • Desember 2010 Optix MSTP+ 1500/3500/ 7500 Product Planning & Second Line Operation
  • Shenzhen
  • January 2018 Indonesian Global Gateway (IGG) TELKOM
  • As Supporter
  • Organized by PT. TELKOM and NEC

Disclaimer

I declare the details stated to be true, honest, and complete. Depok, January 01 2022 Subagyo

Timeline

Lead Landline Asianet Bandung Region

PT. ZTE
09.2025 - Current

Site Supervisor

PT. YOFC
01.2023 - Current

Site Engineer

PT. Fiberhome Technologies Indonesia
07.2022 - 12.2022

Coordinator Area

PT. SUG Networks
09.2021 - 12.2021

Project Manager

PT. Bangun Utility Ekakarya
09.2020 - 12.2020

Site Manager

PT. Ketrosden Triasmitra
09.2019 - 08.2020

Document Control

Koperasi Karyawan Moratelindo (KKM)
05.2019 - 08.2019

Specialist Engineer

PT. Satunol Mikro Sistem
05.2018 - 08.2018

Testing DWDM Engineer

PT. NEC
12.2016 - 05.2018

Specialist Transmission

PT. Bakrietelecom tbk.
04.2012 - 12.2015

NOC Access engineer

PT. Bakrietelecom tbk.
09.2008 - 03.2012

Telco NOC Fault, Network Monitoring Center

PT. Bakrie Telecom
08.2006 - 08.2008

Channel Management & POP Material Support

PT. Bakrie Telecom
01.2004 - 07.2006

Installation and Maintenance Leader Jakarta area

PT. Ratelindo
01.2002 - 12.2003

Field Installation and Maintenance Engineer

PT. Ratelindo
07.1996 - 12.1999

Senior High School Degree - Telecommunication

STM Negeri Pembangunan Yogyakarta

Junior High School Degree - undefined

SMP Negeri IV Yogyakarta

Elementary School Degree - undefined

SD Negeri Jeblog Bantul

Bachelor Degree - Teknik Informatika

STMIK Jayakarta
Subagyo SabiunEngineer Telecomunication