Summary
Overview
Work History
Education
Skills
Certification
Bosiet Vantage No
H2s Certificate No
Personal Information
Timeline
Generic
Sunaryo Vardamean Manalu

Sunaryo Vardamean Manalu

Batam,KR

Summary

More than 10 years working experience in technical division, Including in Oil & Gas jobs (Oilfield service, Construction), and Powerplant; abilities in. Computer Ms. Office. Skill in Auto or Manual Transfer modification wiring and troubleshooting. Instrumentation Installation and Testing. Electrical and Instrument Inspection methods based on project specification. Pre-Comm and Commissioning in Instrumentation activities. Punch List Management system. As-built drawing documentation. Using Instrument tools (Hart Communicator, Loop Calibrator, RTD tester, TC tester, Pneumatic and Hydraulic Hand pump) Atex Ex01-04 Certified. Experience using PIMS and ICAPS for Project Management systems.

Instrumentation professional with comprehensive background in commissioning, calibration, and maintenance. Known for strong attention to detail and ability to ensure equipment meets operational standards. Collaborative team player with focus on achieving high-quality results and adapting to dynamic project requirements.

Knowledgeable [Desired Position] with extensive experience in commissioning of instrumentation systems. Proven track record of ensuring precise calibration and functionality of equipment in various industrial settings. Demonstrated ability to troubleshoot complex issues and effectively utilize technical skills and teamwork.

Overview

18
18
years of professional experience
2007
2007
years of post-secondary education
8
8
Certifications
3
3
Languages

Work History

QC E&I Inspector (EEHA & Compex)

PT. McDermott Indonesia
09.2024 - 02.2025
  • Company Overview: Inpex Ichthys – Batam, Indonesia
  • Monitoring Construction progress for Lighting and small power Systems, Valve Installation and Instrument Cable testing.
  • Perform and witness Continuity and IR test for Lighting and small power Cables as per circuit and Instrument Cables.
  • Make sure all internal component and termination are correct and tight as per Termination drawing.
  • Report daily activities to E&I Quality Lead.
  • Inpex Ichthys – Batam, Indonesia

E&I QC Inspector (Compex)

Saipem ( Agency: AARVI Encon Service)
04.2024 - 09.2024
  • Company Overview: Qatar Gas NFPS Project – Saipem Karimun Yard
  • Attend Inspection based on Invitation from Sub-Contractor.
  • Doing Inspection (Installation, Cable testing and Ex Inspection) refer to Project specification, method statements, and ITP (Inspection Test Procedure).
  • Communication and discussion with Client about daily Inspection Plan.
  • Maintain Inspection timing with quantity RFI per day.
  • Raise Punch List with clearly Punch list Category.
  • Fill up, review and Sign ITR for one day inspection.
  • Monitoring Inspection Progress and Remaining ITR per Subsystem in each platform.
  • Material Inspection as per Invitation and Request from Saipem Project Store Officer.
  • Create VIR (Visual Inspection Report) after completed Inspection.
  • Submitted VIR and document attachment to Client (Qatar Gas Inspector).
  • Witness for Tubing Leak Test as per Invitation and Progress needed.
  • Prepare and maintain tubing leak test documents as per Instrument data sheet and PID for references.
  • Make sure cleaning after tubing leak test and connecting with properly and tightened.
  • Witness and Validation for Calibration Instrument devices (Level Gauge with Magnetic type, Level Transmitter with direct Mounted and Capillary type).
  • Report final result of inspection to QC Supervisor.
  • Discussion to Supervisor if any obstacle during Inspection to get solution.
  • Qatar Gas NFPS Project – Saipem Karimun Yard

E&I QC Inspector (Compex)

Saipem ( Agency: Ceria Utama Abadi)
10.2023 - 04.2024
  • Company Overview: Qatar Gas NFPS Project – Saipem Karimun Yard
  • Attend Inspection based on Invitation from Sub-Contractor.
  • Doing Inspection (Installation, Cable testing and Ex Inspection) refer to Project specification, method statements, and ITP (Inspection Test Procedure).
  • Communication and discussion with Client about daily Inspection Plan.
  • Maintain Inspection timing with quantity RFI per day.
  • Raise Punch List with clearly Punch list Category.
  • Fill up, review and Sign ITR for one day inspection.
  • Monitoring Inspection Progress and Remaining ITR per Subsystem in each platform.
  • Material Inspection as per Invitation and Request from Saipem Project Store Officer.
  • Create VIR (Visual Inspection Report) after completed Inspection.
  • Submitted VIR and document attachment to Client (Qatar Gas Inspector).
  • Witness for Tubing Leak Test as per Invitation and Progress needed.
  • Prepare and maintain tubing leak test documents as per Instrument data sheet and PID for references.
  • Make sure cleaning after tubing leak test and connecting with properly and tightened.
  • Witness and Validation for Calibration Instrument devices (Level Gauge with Magnetic type, Level Transmitter with direct Mounted and Capillary type).
  • Report final result of inspection to QC Supervisor.
  • Discussion to Supervisor if any obstacle during Inspection to get solution.
  • Qatar Gas NFPS Project – Saipem Karimun Yard

Instrument Technician

ASOM (Asian Sealand Offshore & Marine) Pte, Ltd.
04.2023 - 08.2023
  • Company Overview: Carry overwork FPSO Prosperity – Guyana Offshore (South America)
  • Prepare task as per subsystems and Client Request based on COW activities.
  • Assist Instrument Commissioning teams for stroke test and modified SDV solenoid timer including Tubing modification.
  • Assist Instrument Commissioning for Function test and Stroke test SOV Cargo and Ballast tank.
  • Partially hand over Instrument progress to Operation teams.
  • Assist Telecom Teams for Function test Wave and Resistance Device.
  • Report all Progress to Engineer and Lead for daily updated.
  • Carry overwork FPSO Prosperity – Guyana Offshore (South America)

E&I Technician

PT. WASCO Engineering Indonesia
03.2023 - 04.2023
  • Company Overview: TOTAL Dunga – PT. WASCO Engineering Indonesia
  • Prepare daily task as per Foreman and Supervisor.
  • Confirm drawing and tools before working that getting from Foreman.
  • Install support cable tray, cable ladder, and maintain working time with quality.
  • Housekeeping before and after working.
  • TOTAL Dunga – PT. WASCO Engineering Indonesia

Hook up & Commissioning Technician (DCC Teams)

Mcdermott Indonesia (Agency: NES Fircroft)
08.2022 - 10.2022
  • Company Overview: Qatar Gas I1P1 – PT. Mcdermott Indonesia
  • Prepare task as per subsystems and Client Request based on PIMS Database.
  • Review Construction Progress per Subsystem before hand over to Commissioning.
  • Prepare and maintain Construction progress before walkdown with client.
  • Make sure Punch List that block system are closed before walkdown.
  • Support Construction team for hand over to commissioning as per subsystem completed.
  • Support PRC (Prepare Ready for Commissioning) activities with Client.
  • Report all Progress to Engineer and Lead for updated.
  • Qatar Gas I1P1 – PT. Mcdermott Indonesia

ICSS & Instrument Commissioning SPV

SMOP ( Agency: PT. Angkasa Engineering Indonesia)
12.2021 - 05.2022
  • Company Overview: Gallaf Batch 2 (Wellhead Platform) – Qatar Offshore
  • Prepare task as per subsystems and Client Request.
  • Monitoring ICAPS for make sure Punch List and daily Progress.
  • Loop Check Interface with Electrical team for UPS systems.
  • Prepare Loop check, Loop test FGS and Process line.
  • Troubleshooting FGS Equipment: MSA General Monitor S5000, MSA General Monitor X5000, Beacon and Detronic Smoke Detector Ex d type.
  • Troubleshooting Process line Equipment: Air duct heater Temperature transmitter, HVAC PDT, HVAC Humidity Transmitter, and KO drum Pressure Transmitter.
  • Function Test PT and LT as per specification pressure.
  • Support OTP Fire and Gas systems with Field Operation members.
  • Support PRC (Prepare Ready for Commissioning) with Field Operation Personnel.
  • Make sure ILD is correct with actual termination after completed Loop test.
  • Report all Progress in FTS at the end of day to Client (NOC Inst. SPV).
  • Gallaf Batch 2 (Wellhead Platform) – Qatar Offshore

Instrument Commissioning Technician

PT. Angkasa Engineering Indonesia
06.2021 - 11.2021
  • Company Overview: Gallaf Batch 2 (Wellhead Platform) – PT. SMOE Fabrication Yard Indonesia (Onshore)
  • Prepare task as per subsystems and Client Request.
  • Monitoring ICAPS for make sure Punch List and daily Progress.
  • Monitoring and support pre-comm activities if needed.
  • Prepare Inergen skid for optional test with vendor.
  • Pipeline checking Inergen system from and to until end line and make sure no blocking line.
  • Troubleshooting Local Pilot inergen skid before actual testing with NOC.
  • Actual testing Inergen system to confirm Pilot and system are match before offshore Installation.
  • Support vendor to replace Inergen bottle and make sure all Inergen pilot are safe and secure.
  • Monitoring All Instrument drawings and Interface drawing are match with latest revision.
  • Report all Progress in FTS at the end of day to Client (NOC Inst. SPV).
  • Gallaf Batch 2 (Wellhead Platform) – PT. SMOE Fabrication Yard Indonesia (Onshore)

Hook-up & Commissioning Technician

PT. Mcdermott Indonesia
02.2021 - 05.2021
  • Company Overview: Tyra Re-development (CPP-TEG Platform) – Batam, Indonesia
  • Prepare Internal Inspection Test for UPS system before actual Inspection with Client.
  • Doing Inspection for UPS systems with TOTAL Client.
  • Input daily progress into PIMS including Punch List.
  • Prepare document supporting for daily Inspection activities.
  • Monitoring Punch list and separate based on Punch List Category.
  • Prepare document for DAC (Dossier Acceptance Certificate) before hand over to Commissioning.
  • Calculate and Monitoring Remaining ITR based on cumulative totals ITR.
  • Report and submit daily activities to SPV.
  • Tyra Re-development (CPP-TEG Platform) – Batam, Indonesia

I&C Commissioning Technician

Samsung Commissioning & Testing-Destin Mandiri Int
09.2020 - 02.2021
  • Company Overview: JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW) – Cilamaya of West Java
  • Monitoring Instrument Installation are match with Equipment layout.
  • Monitoring PID and Line checking each system of BOP.
  • Join Inspection for Pre-comm activities with Client (Jawa-1 Power).
  • Cable Line Checking for Electro chlorine system, Sea water Intake System, Water Treatment System, and Wastewater Treatment.
  • Join field Calibration for Level Transmitter and Pressure Transmitter for Water Treatment and Wastewater Treatment Basin with Sub-contractor and Client (Jawa-1 Power).
  • Report and submit daily activities to I&C Engineer and I&C Manager.
  • JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW) – Cilamaya of West Java

I&C Commissioning Technician

Black and Veatch (PT. Haman Energy Indonesia)
02.2020 - 06.2020
  • Company Overview: Lontar Extension (unit 4) Coal Fired Steam Power Plant – Tangerang district of Banten Province
  • Monitoring Instrument Installation are match with Equipment layout.
  • Monitoring PID and Line checking each system of BOP.
  • Join Inspection for Pre-comm activities with Client (Jawa-1 Power).
  • Cable Line Checking for Electro chlorine system, Sea water Intake System, Water Treatment System, and Wastewater Treatment.
  • Join field Calibration for Level Transmitter and Pressure Transmitter for Water Treatment and Wastewater Treatment Basin with Sub-contractor and Client (Jawa-1 Power).
  • Performed activities for Loop test and function test in Coal Handling in Boiler site.
  • Loop check and Loop test FGS, PAGA, and ESD system in Port site.
  • Report and submit daily activities to I&C Engineer and I&C Manager.
  • Lontar Extension (unit 4) Coal Fired Steam Power Plant – Tangerang district of Banten Province

Hook-up & Commissioning Technician

PT. Mcdermott Indonesia
06.2019 - 09.2019
  • Company Overview: Qatar Petroleum Re-development Bulhanine Project – Batam, Indonesia
  • Prepare task as per subsystems and Client Request.
  • Monitoring and support pre-comm activities if needed.
  • Loop Check F&G systems in ach deck and make sure cable termination are match with Interconnection drawing.
  • Troubleshooting earthing cables as per systems inside all instruments systems.
  • Perform Loop test for F&G systems as per Client and MC progress.
  • Monitoring All Instrument drawings and Interface drawing are match with latest revision.
  • Report all Progress in FTS at the end of day to SPV/ Commissioning Lead.
  • Qatar Petroleum Re-development Bulhanine Project – Batam, Indonesia

QC Superintendent

PT. TOMOE Valve Batam
05.2018 - 06.2019
  • Company Overview: Japanese Valve Manufacturing – Latrade Industrial-Batam
  • Attend Inspection based on Invitation from Production.
  • Doing Inspection (Installation, Cable testing and Actuator Perform) refer to Project specification, method statements, and ITP (Inspection Test Procedure).
  • Communication and discussion with QA Manager about daily Inspection Plan.
  • Maintain Inspection timing with quantity Product per day.
  • Raise Punch List with clearly Punch list Category.
  • Monitoring and Review VIR (Visual Inspection Report) after completed Inspection.
  • Witness Completed Product for functional test and recorded.
  • Report results of inspection to QA Manager.
  • Japanese Valve Manufacturing – Latrade Industrial-Batam

Freelance E&I Inspection and Testing

PT. Bina Mandiri
07.2017 - 04.2018
  • Company Overview: Shipyard – PT. DRU Lampung
  • Prepare task as per subsystems and Client Request.
  • Loop Check Interface with Electrical team for UPS systems.
  • Prepare Loop check, Loop test FGS and Process line.
  • Make sure all Inspection as per Invitation and Per Sub-systems.
  • Perform Continuity and IR test for E&I Cables and Raised PL as per PL category.
  • Shipyard – PT. DRU Lampung

QCF Inspector-E&I

SIEMENS Indonesia (agency: AIRSWIFT Pte, Ltd.)
11.2016 - 04.2017
  • Company Overview: Yamal LNG batch 4-5 – SIEMENS Fabrication Yard - Batam, Indonesia
  • Attend Inspection based on Invitation from Sub-Contractor.
  • Doing Inspection (Installation, Cable testing and Ex Inspection) refer to Project specification, method statements, and ITP (Inspection Test Procedure).
  • Communication and discussion with Client about daily Inspection Plan.
  • Maintain Inspection timing with quantity RFI per day.
  • Raise Punch List with clearly Punch list Category.
  • Fill up, review and Sign ITR for one day inspection.
  • Monitoring Inspection Progress and Remaining ITR per Subsystem in each platform.
  • Create VIR (Visual Inspection Report) after completed Inspection.
  • Submitted VIR and document attachment to Client (YAMGAZ Inspector).
  • Report results of inspection to Commissioning Manager.
  • Discussion to Construction Supervisor if any obstacle during Inspection to get solution.
  • Yamal LNG batch 4-5 – SIEMENS Fabrication Yard - Batam, Indonesia

Senior Hook up and Commissioning Technician

PT. Mcdermott Indonesia
08.2016 - 11.2016
  • Company Overview: YAMAL LNG Process Modules Batch 3 – Batam, Indonesia
  • Prepare task as per subsystems and Client Request based on Subsystems.
  • Perform Loop check and Loop test for F&G systems.
  • Perform Loop test and Loop check for PAGA Speaker including Impedance test.
  • Perform partial loop check for Flow transmitter with Radar type.
  • Partially hand over Instrument progress to Operation teams.
  • Report all Progress to Commissioning Lead for daily updated.
  • YAMAL LNG Process Modules Batch 3 – Batam, Indonesia

Electrical Leader

PT. Aryacipta Technology
09.2015 - 11.2016
  • Company Overview: Radission Hotel – Batam, Indonesia
  • Prepare task as per subsystems and Client Request.
  • Monitoring and preparation for Cable Pulling as per Cable Schedule.
  • Maintain Cable pulling progress as per manhours and cable length needed.
  • Discussion with engineering for Mock-up Room termination as per project spec and material availability.
  • Perform termination for Transformer cables as per termination drawing.
  • Report all progress to Site Manager and discussion for any obstacle.
  • Radission Hotel – Batam, Indonesia

E&I MC technician

PT. DELIMAX Indonesia
01.2016 - 06.2016
  • Company Overview: YAMAL LNG Batch 2 to 3 – SIEMENS Fabrication Yard
  • Prepare Internal Inspection Test for Lighting system before actual Inspection with Client.
  • Doing Inspection for Lighting systems with Delimax QC and Client.
  • Minimize PL before inspection and closing PL after Inspection.
  • Perfom Continuity and IR test in every Inspection activity.
  • Monitoring Punch list and separate based on Punch List Category.
  • Prepare next priority subsystems as per information from DELIMAX QC.
  • YAMAL LNG Batch 2 to 3 – SIEMENS Fabrication Yard

Purchasing Staff

PT. EX Batam Indonesia
08.2013 - 08.2014
  • Company Overview: Japanese Electronic Manufacturing – Batamindo Industrial Estate
  • Prepare task as per Production and Client Request.
  • Monitoring and preparation Material as per Warehouse availability.
  • Calculation and issuing Spare part as per Product request and Warehouse stock in every Thursday.
  • Visit and monitoring Moulding Part to Vendor when needed.
  • Japanese Electronic Manufacturing – Batamindo Industrial Estate

Metal Painting Operator

CHIBA Bosei Co, Ltd.
07.2010 - 07.2013
  • Company Overview: Japanese Blasting Painting – CHIBA prefecture, Japan
  • Painting Preparation after Blasting activities.
  • Material Preparation before starting activities.
  • Cleaning painting area and make sure all rubbish trow to rubbish bin.
  • Make sure painting thickness accepted as per project standards.

QC Assistance

PT. Besmindotama Semesta
02.2007 - 02.2009
  • Company Overview: Oilfield Service Company – Cibitung of West Java
  • Inspection preparation device before Certified QC doing activities.
  • Assist for grind area that will be doing MPI (magnetic Process Inspection) and cleaning after inspection.
  • Secure devices or equipments after inspection with acceptable marking to next step of replacement area.
  • Monitoring equipments or devices that will be completed from Production to do next step of inspection activities.

Education

Diploma - English

Lampung University
Bandar Lampung, Indonesia
09-2006

Skills

Inspection reporting

Certification

Process Instrument and Calibration Training, Delta Skills Solution (M) SDN. BHD, Malaysia

Bosiet Vantage No

2339669, 07/30/28

H2s Certificate No

21262501, 11/27/23

Personal Information

  • Passport Number: C7886047
  • Date of Birth: 11/16/84
  • Gender: Male
  • Nationality: Indonesia
  • Religion: Islam

Timeline

QC E&I Inspector (EEHA & Compex)

PT. McDermott Indonesia
09.2024 - 02.2025

E&I QC Inspector (Compex)

Saipem ( Agency: AARVI Encon Service)
04.2024 - 09.2024

E&I QC Inspector (Compex)

Saipem ( Agency: Ceria Utama Abadi)
10.2023 - 04.2024

Instrument Technician

ASOM (Asian Sealand Offshore & Marine) Pte, Ltd.
04.2023 - 08.2023

E&I Technician

PT. WASCO Engineering Indonesia
03.2023 - 04.2023

Hook up & Commissioning Technician (DCC Teams)

Mcdermott Indonesia (Agency: NES Fircroft)
08.2022 - 10.2022

ICSS & Instrument Commissioning SPV

SMOP ( Agency: PT. Angkasa Engineering Indonesia)
12.2021 - 05.2022

Instrument Commissioning Technician

PT. Angkasa Engineering Indonesia
06.2021 - 11.2021

Hook-up & Commissioning Technician

PT. Mcdermott Indonesia
02.2021 - 05.2021

I&C Commissioning Technician

Samsung Commissioning & Testing-Destin Mandiri Int
09.2020 - 02.2021

I&C Commissioning Technician

Black and Veatch (PT. Haman Energy Indonesia)
02.2020 - 06.2020

Hook-up & Commissioning Technician

PT. Mcdermott Indonesia
06.2019 - 09.2019

QC Superintendent

PT. TOMOE Valve Batam
05.2018 - 06.2019

Freelance E&I Inspection and Testing

PT. Bina Mandiri
07.2017 - 04.2018

QCF Inspector-E&I

SIEMENS Indonesia (agency: AIRSWIFT Pte, Ltd.)
11.2016 - 04.2017

Senior Hook up and Commissioning Technician

PT. Mcdermott Indonesia
08.2016 - 11.2016

E&I MC technician

PT. DELIMAX Indonesia
01.2016 - 06.2016

Electrical Leader

PT. Aryacipta Technology
09.2015 - 11.2016

Purchasing Staff

PT. EX Batam Indonesia
08.2013 - 08.2014

Metal Painting Operator

CHIBA Bosei Co, Ltd.
07.2010 - 07.2013

QC Assistance

PT. Besmindotama Semesta
02.2007 - 02.2009

Diploma - English

Lampung University
Sunaryo Vardamean Manalu