Summary
Overview
Work History
Education
Skills
Timeline
Languages
Personal Information
Generic
Tatang Hidayat

Tatang Hidayat

Chief Technical Officer
Kota Madiun

Summary

I am an individual who embodies a profound sense of commitment, unwavering discipline, and an exceptional level of responsibility. These core attributes are the bedrock of my professional ethos and are evident in every project I undertake. My steadfast commitment ensures that I am fully dedicated to delivering results, while my discipline guarantees a methodical and focused approach to my work. Furthermore, my strong sense of responsibility means that I am always accountable for my actions, ensuring reliability and trustworthiness in all my professional endeavors.

Overview

17
17
years of professional experience
2
2
Languages

Work History

CHIEF TECHNICAL OFFICER

PT SHINRYO INDONESIA
10.2024 - Current
  • HVAC.PLUMBING,FIRE FIGHTING,AND TEST COMMISSIONING AT FOOD CULTURE RENOVATION PROJECT AEON MALL BSD- TANGERANG WEST JAVA INDONESIA
  • technology investments while achieving cost savings through effective vendor negotiation tactics and resource allocation strategies.
  • Negotiated strategic partnerships with technology vendors to secure favorable pricing on cutting-edge products and services.
  • Mentored technical teams, fostering a culture of continuous learning and professional development within the organization.

SENIOR SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
08.2022 - 08.2024
  • HVAC.PLUMBING,FIRE FIGHTING,AND TEST COMMISSIONING AT FREEPORT SMELTER PROJECT- GRESIK EAST JAVA INDONESIA
  • Lead, manage, and supervise the overall implementation of the project, ensuring the project is completed on time, within budget, and meets established quality standards.
  • Controlling the operational implementation of the project
  • Carrying out project operational activities
  • Planning work schedule for foreman
  • Planning and calculating material and labor requirements and placement
  • Coordinate with Safety regarding K3
    Coordinate with materials
    Coordinate with Owner / Consultant regarding the implementation of workers


SENIOR SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
07.2021 - 06.2022
  • HVAC.PLUMBING,FIRE FIGHTING,AND TEST COMMISSIONING AT GLICO PROJECT - KIIC KARAWANG WEST JAVA INDONESIA
  • Lead, manage, and supervise the overall implementation of the project, ensuring the project is completed on time, within budget, and meets established quality standards.
  • Controlling the operational implementation of the project
  • Carrying out project operational activities
  • Planning work schedule for foreman
  • Planning and calculating material and labor requirements and placement
  • Coordinate with Safety regarding K3 Coordinate with materials Coordinate with Owner / Consultant regarding the implementation of workers

SENIOR SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
07.2018 - 06.2020
  • HVAC.,FIRE FIGHTING,AND TEST COMMISSIONING AT TANJUNG JATI B (TJB) UNIT 5&6 COAL FIREDPOWER PLANT PROJECT - JEPARA CENTRAL JAVA TIMUR INDONESIA
  • Lead, manage, and supervise the overall implementation of the project, ensuring the project is completed on time, within budget, and meets established quality standards.
  • Controlling the operational implementation of the project
  • Carrying out project operational activities
  • Planning work schedule for foreman
  • Planning and calculating material and labor requirements and placement
  • Coordinate with Safety regarding K3 Coordinate with materials Coordinate with Owner / Consultant regarding the implementation of workers

SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
01.2017 - 06.2018
  • INSTALLATION HVAC.PLUMBING,FIRE FIGHTING,AND TEST COMMISSIONING AT MAXXIS PROJECT - GIIC CIKARANG WEST JAVA INDONESIA
  • Controlling the operational implementation of the project
  • Carrying out project operational activities
  • Planning work schedule for foreman
  • Planning and calculating material and labor requirements and placement
  • Coordinate with Safety regarding K3 Coordinate with materials Coordinate with Owner / Consultant regarding the implementation of workers

SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
06.2015 - 12.2016
  • INSTALLATION HVAC.PLUMBING,FIRE FIGHTING,AND TEST COMMISSIONING AT MITSUBISHI MOTORS KRAMAYUDA INDONESIA PROJECT - GIIC CIKARANG WEST JAVA INDONESIA
  • Controlling the operational implementation of the project
  • Carrying out project operational activities
  • Planning work schedule for foreman
  • Planning and calculating material and labor requirements and placement
  • Coordinate with Safety regarding K3 Coordinate with materials Coordinate with Owner / Consultant regarding the implementation of workers

MECHANICAL COMMISSIONING

TOSHIBA CORPORATION
06.2014 - 10.2014
  • COMMISSIONING FOR PATUHA UNIT 1 (1 X 55 MW ) GEOTHERMAL POWER PLANT PROJECT BANDUNG WEST JAVA INDONESIA
  • Lead and supervise the entire commissioning process, ensuring that the project is running according to plan meets quality and safety standards, and that the systems or equipment are functioning properly before being handed over.
  • Develop a comprehensive commissioning plan, including schedule, resources, and test procedures. Organize and allocate tasks to the commissioning team

LEADER COMMISSIONING

PT WASA MITRA ENGINEERING
02.2014 - 08.2014
  • COMMISSIONING AT KIIC IB PROJECT KARAWANG WEST JAVA INDONESIA
  • Lead and supervise the entire commissioning process, ensuring that the project is running according to plan meets quality and safety standards, and that the systems or equipment are functioning properly before being handed over.
  • Develop a comprehensive commissioning plan, including schedule, resources, and test procedures.
    Organize and allocate tasks to the commissioning team

LEADER HYDRO TEST

PT WASA MITRA ENGINEERING
03.2013 - 09.2013
  • HYDROTEST AT KIC PROJECT KARAWANG WEST JAVA INDONESIA
  • Planning, coordination with related parties, supervision of implementation, and handling of problems that may arise during the hydrotest process
  • Supervision of the implementation of pressure testing (hydrotest) on pipe circuits, ensuring the suitability and safety of the piping system before use.

MECHANICAL LEADER

THOSIBA
04.2012 - 02.2013
  • REHABILITATION TURBIN AND GENERATOR AT 2X400 MW PAITON UNIT 1&2 COAL FIRED POWER PLANT INDONESIA
  • Identified team weak points and implemented corrective actions to resolve concerns.
  • Maintained team flexibility and embraced change to adapt within dynamic markets.
  • Mentored junior staff members, helping them develop leadership skills and advance their careers within the organization.

MECHANICIAN

PT WASA MITRA ENGINEERING
01.2011 - 02.2012
  • INSTALLATIN TURBIN AND GENERATOR AT PLTGU TANJUNG PRIOK 740 MW GFPPEP JAKARTA INDONESIA
  • Assembled and disassembled equipment to perform repairs and maintenance.
  • Resolved mechanical issues using both technical and manual skills.
  • installation, maintenance, repair and testing of mechanical systems and equipment

MECHANICIAN

PT WASA MITRA ENGINEERING
02.2010 - 01.2011
  • REHABILITATION GENERATOR AND TURBIN AT PROJECT PLTU MUARA KARANG REHABILITATION UNIT 4 JAKARTA INDONESIA
  • Assembled and disassembled equipment to perform repairs and maintenance.
  • Resolved mechanical issues using both technical and manual skills.
  • installation, maintenance, repair and testing of mechanical systems and equipment

PIPE FITTER

PT WASA MITRA ENGINEERING
12.2008 - 01.2010
  • INSTALLATION PIPE AT PROJECT PLTU JAWA TENGAH 2X(300-400MW)REMBANG CENTRAL INDONESIA
  • Improved workflow with efficient pipe system modifications, including cutting, threading, welding, and soldering components as needed.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Connected piping systems to water heaters, boilers, pumps and auxillary equipment to complete installations.

PIPE FITTER

PT WASA MITRA ENGINEERING
05.2008 - 11.2008
  • INSTALLATION PIPE AT WAYANG WINDU UNIT 2 PROJECT PANGALENGAN-WEST JAVA INDONESIA
  • Improved workflow with efficient pipe system modifications, including cutting, threading, welding, and soldering components as needed.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Connected piping systems to water heaters, boilers, pumps and auxillary equipment to complete installations.

Education

SMA - undefined

SMA 1 PANGALENGAN

NDT LEVEL 2 - undefined

BALAI BESAR BAHAN & BARANG TEKNIK
04.2017 - 09.2017

Skills

MECHANICAL

undefined

Timeline

CHIEF TECHNICAL OFFICER

PT SHINRYO INDONESIA
10.2024 - Current

SENIOR SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
08.2022 - 08.2024

SENIOR SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
07.2021 - 06.2022

SENIOR SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
07.2018 - 06.2020

NDT LEVEL 2 - undefined

BALAI BESAR BAHAN & BARANG TEKNIK
04.2017 - 09.2017

SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
01.2017 - 06.2018

SUPERVISOR MECHANICAL

PT SHINRYO INDONESIA
06.2015 - 12.2016

MECHANICAL COMMISSIONING

TOSHIBA CORPORATION
06.2014 - 10.2014

LEADER COMMISSIONING

PT WASA MITRA ENGINEERING
02.2014 - 08.2014

LEADER HYDRO TEST

PT WASA MITRA ENGINEERING
03.2013 - 09.2013

MECHANICAL LEADER

THOSIBA
04.2012 - 02.2013

MECHANICIAN

PT WASA MITRA ENGINEERING
01.2011 - 02.2012

MECHANICIAN

PT WASA MITRA ENGINEERING
02.2010 - 01.2011

PIPE FITTER

PT WASA MITRA ENGINEERING
12.2008 - 01.2010

PIPE FITTER

PT WASA MITRA ENGINEERING
05.2008 - 11.2008

SMA - undefined

SMA 1 PANGALENGAN

Languages

Indonesian
English

Personal Information

Driving License: Category A, Category C
Tatang HidayatChief Technical Officer