Trias Agung Supriyanto

Trias Agung Supriyanto

Piping and Pipeline Designer
Penjaringan-Jakarta Utara

Overview

21
21
years of professional experience

Work History

Piping Designer & Coordinator Design Engineering

PT. Haryatek Elsindo Anugerah
02.2025 - 08.2025
  • Client : PT. MIRAH GANAL ENERGI (Bangkanai kalimantan tengah).
  • Job Assigment: Piping System Condensate Transfer pump, Project.
  • Responsibility :
  • Site visited Prepare TIE-IN
  • 3D Modeling & Routing piping condensate line suction & discharge pump
  • Provide Pipe support location & details
  • Provide Piping Section & Details Drawing
  • Provide Isometric Drawing & MTO
  • Provide Spool Drawing for Fabrication
  • (Engineering & Contractor Service)

pipeline / piping Designer & Coordinator Design Engineering

PT. Ramai Jaya Abadi
10.2024 - 02.2025
  • Client : ENERGY EQUITY EPIC (Sengkang).Pty. LTD
  • Job Assigment: Provision of Epci Flowline KB-10 Kampung Baru Development, Project
  • Responsibility :
  • Site visited Prepare TIE-IN & Hot-Tap Drawing
  • Site visited Prepare Topography
  • 3D Modeling & Routing piping Gas inlet
  • Prepare and Make Drawing Alignment Sheet, Piping Plan, Isometric, Detail Pipe Support, River and Road Crossing and Spool Drawing For Fabrication.
  • (Supplayer & Contractor)

Piping & Pipeline Design Drafting

PT. Tiga Inti Pilar
12.2022 - 10.2024
  • Client : PETROCHINA INTERNATIONAL JABUNG. LTD
  • Job Assigment: Betara Complex Development FEED OF PANEN SATATION, Project
  • Responsibility :
  • Site visited Prepare TIE-IN Drawing
  • Routing Piping gas inlet, gas outlet, instrument air Supply & Fire water
  • Provide Pipe support location & details
  • Provide Piping Section & Details Drawing
  • Routing Piping Pipe Rack drawing for all line
  • (Engineering & Project Management Consultant)

Piping & Pipeline Design Drafting, Site Supervisor

ENERGY EQUITY EPIC (SENGKANG)
01.2015 - 10.2022
  • Job Assigment: PIPELINE WASAMBO DEVELOPMENT AND KEERA METRING STATION, Project
  • Responsibility :
  • Site visited prepare location coordinate and ROW pipeline
  • Site visited prepare location coodinate wellhead
  • Sire visited prepare location Tie-in and hot tap
  • Prepare and creating drawing P&ID, Piping & Pipeline for document tender
  • Prepare and creating material take off for document tender
  • Review and Checking Drawing Plot Plan, Equipment Layout, Piping Plan, Isometric, Pipe support
  • Review and Checking drawing Alignment sheet
  • Make standard Detail HDD, Open Cut & Auger Boring
  • Monitor project progress and report progress to management.
  • Resolve issues and obstacles that arise on the project site.
  • Ensure that the work is in accordance with the engineering design
  • Job Assigment: KAMPUNG BARU GAS COMPRESSOR, Project
  • Responsibility :
  • Sire visited prepare location Tie-in and hot tap
  • Prepare and creating drawing P&ID, Piping for document tender
  • Prepare and creating material take off for document tender
  • Review and Checking Drawing Plot Plan, Equipment Layout, Piping Plan, Isometric, Pipe support
  • Resolve issues and obstacles that arise on the project site.
  • Ensure that the work is in accordance with the engineering design
  • Job Assigment: Metering City Gas , Inhouse Poject.
  • (Kontraktor Kontrak Kerjasama - KKKS)

Senior Piping Design Drafting

PT. Rekindworley Parsons
07.2014 - 01.2015
  • Client : PT. CHEVRON PACIFIC INDONESIA
  • Job Assigment: NIMAS DEVELOPMENT PROJECT, Project
  • Responsibility :
  • Site visited Prepare TIE-IN Drawing
  • Routing piping inlet and oulet for pipe oil distribution
  • Provide Pipe support location & details
  • Provide Piping Plan, Piping Section & Details Drawing
  • (Project Management Consultant)

Pipeline Design Drafting

PT. Petrotechindo Utama
02.2013 - 07.2014
  • Client : PT. PERUSAHAAN GAS NEGARA (Persero)Tbk.
  • Job Assigment: BITUNG-CIMANGGIS PIPELINE CP-10, Project
  • Responsibility :
  • Site visited Prepare TIE-IN Drawing
  • Make Detail HDD, Open Cut & Auger Boring
  • Make Drawing alignment sheet
  • Make detail drawing river crossing
  • (Engineering & Project Management Consultant)

Piping Design Drafting

PT. South Pacific Viscose
08.2010 - 12.2013
  • Job Assigment: PIPE RACK LINE 5 VISCOSE, Project
  • Responsibility :
  • Site visited Prepare TIE-IN Drawing
  • Provide Pipe support location & details
  • Isometric Spool Drawing & Bill of Material
  • Piping Section & Details Drawing
  • Routing Piping Pipe Rack drawing for all line
  • (Asia’s Preferred Choise for Viscose Fibres)

Piping Design Drafting

PT. Tripatra Engineering
10.2008 - 08.2010
  • Client : PT. E1-PERTAGAS.
  • Job Assigment: SOUTH SUMATRA NGL, Project
  • Responsibility :
  • Routing Piping gas inlet, Pilot gas & instrument air Supply
  • Site visited Prepare TIE-IN & HOT-TAP Drawing
  • Piping Section & Details Drawing
  • Client : PT. CONOCOPHILLIPS (KETAPANG) Ltd.
  • Job Assigment: FPSO BUKIT TUA FEL - 2 GAS DEVELOPMENT, Project
  • Responsibility :
  • Routing Piping Outdoor composite drawing for all line
  • Routing Piping main gas inlet & Estimation cost Production
  • Piping Section & Details Drawing
  • Client : PT. PERTAMINA – HESS JAMBI MERANG
  • Job Assigment: JAMBI MERANG DEVELOPMENT GAS PRODUCTION FACILITIES, Project
  • Responsibility :
  • Prepare Piping Plan Drawing
  • Prepare Piping Section
  • Prepare Isometric Drawing
  • Prepare Pipe Support Detail
  • (Engineers & Constructors)

Senior Piping Drafter

PT. Loka Wahana Usaha
10.2007 - 10.2008
  • Client : PT. ENERGY EQUITY EPIC (SENGKANG) PTY. LTD
  • Job Assigment: PATILA METERING STATION (EXPLANTION PLANT), Project
  • Responsibility :
  • Prepare Equipment Layout
  • Prepare Key Plan Drawing
  • Prepare Piping Plan Drawing
  • Prepare Isometric Drawing
  • Prepare Pipe Support Detail
  • Client : PT. ENERGY MEGA PERSADA
  • Job Assigment: KANGEAN DEVELOPMENT, Project
  • Responsibility :
  • Prepare Equipment Layout
  • Prepare Key Plan Drawing
  • Prepare Piping Plan Drawing
  • Prepare Isometric Drawing
  • Prepare Pipe Support Drawing
  • Responsibility :
  • SEPANJANG AREA SED#3 & SED#4, Project
  • Responsibility :
  • Prepare Equipment Layout
  • Prepare Key Plan Drawing
  • Prepare Piping Plan Drawing
  • Prepare Isometric Drawing
  • Prepare Pipe Support Drawing
  • (Engineering Consultan)

Piping Mechanical CAD Operator

PT. Betasurya Tatagraha
02.2007 - 10.2007
  • Client : PT. KODECO ENERGY Co.,Ltd.
  • Job Assigment: KANGEAN DEVELOPMENT, Project
  • Responsibility :
  • Prepare Equipment Layout
  • Prepare Isometric Drawing
  • Prepare Piping Plan Drawing
  • Prepare Piping Mechanical Dra
  • Client : PT. SANTOS (Sampang) Ltd.
  • Job Assigment: OYONG DEVELOPMENT, Project
  • Responsibility :
  • Prepare Equipment Layout
  • Prepare Isometric Drawing
  • Prepare Piping Drawing
  • Client : PT. BINAWAHANA PETERINDO
  • Job Assigment: LNG SAROLANGUN JAMBI, Project
  • Responsibility :
  • Prepare Equipment Layout
  • Prepare Isometric Drawing
  • Prepare Piping Mechanical Drawing
  • (Engineering & Contruction)

Piping Mechanical CAD Operator

PT. Gerbang Sarana Baja
02.2006 - 02.2007
  • Client : PT. ODIRA ENERGY NIAGA
  • Job Assigment: LPG PLANT TAMBUN, Project
  • 31 UNIT PRESSURE VESSEL PACKAGE
  • Responsibility :
  • Prepare Piping Plant Drawing
  • Prepare Isometric Drawing
  • Prepare Piping Mechanical Drawing
  • Prepare Shop Drawing
  • Prepare As-built Drawing
  • (Steel Structure Fabrication & Construction)

CAD Operator & Microstation Operator

PT. Pertafenikki engineering
01.2005 - 02.2006
  • Client : PT. Bp ARCO (PT. BPPT, Jakarta)
  • Job Assigment: NGLCA, NGLCB, JJA, BZNA Platform, Project
  • Responsibility :
  • Prepare Process Flow Diagram
  • Prepare Process & Instrument Diagram
  • Prepare Piping Plant Drawing
  • Prepare Isometric Drawing
  • (Engineering & Contruction)

Education

Graduate - Senior High School

Skills

Microsoft Word & Microsoft Excel

Drafting Training

AutoCAD 2000/2017 Training

PDMS Training

Plant3D AutoCAD 2013 Training

Microsoft Word & Microsoft Excel

Drafting

AutoCAD 2000/2026

Plant3D AutoCAD 2013 / 2026

Timeline

Piping Designer & Coordinator Design Engineering

PT. Haryatek Elsindo Anugerah
02.2025 - 08.2025

pipeline / piping Designer & Coordinator Design Engineering

PT. Ramai Jaya Abadi
10.2024 - 02.2025

Piping & Pipeline Design Drafting

PT. Tiga Inti Pilar
12.2022 - 10.2024

Piping & Pipeline Design Drafting, Site Supervisor

ENERGY EQUITY EPIC (SENGKANG)
01.2015 - 10.2022

Senior Piping Design Drafting

PT. Rekindworley Parsons
07.2014 - 01.2015

Pipeline Design Drafting

PT. Petrotechindo Utama
02.2013 - 07.2014

Piping Design Drafting

PT. South Pacific Viscose
08.2010 - 12.2013

Piping Design Drafting

PT. Tripatra Engineering
10.2008 - 08.2010

Senior Piping Drafter

PT. Loka Wahana Usaha
10.2007 - 10.2008

Piping Mechanical CAD Operator

PT. Betasurya Tatagraha
02.2007 - 10.2007

Piping Mechanical CAD Operator

PT. Gerbang Sarana Baja
02.2006 - 02.2007

CAD Operator & Microstation Operator

PT. Pertafenikki engineering
01.2005 - 02.2006

Graduate - Senior High School

Trias Agung SupriyantoPiping and Pipeline Designer