Summary
Overview
Work History
Education
Skills
Tools
Personal Information
Student Experience
Timeline
Generic
Triyanto

Triyanto

Geophysicist (Field And Design Seismlogist) In Land Seismic Acquisition
Perum BTN Balongan Pratama, Jalan Batu Mulia, Blok A6, No.5, Tegalurung, Balongan, Indramayu

Summary

  • Expert in 2D and 3D seismic acquisition, especially acquisition design and has worked for 16 years.
  • Have good communication skills so that topography, drilling and pre-loading, as well as recording activities are in accordance with the survey design and run well, smoothly, effectively and efficiently and meet K3LL rules.
  • Good managerial, communicating/coordinating with clients and work partners well, problem solving, and able to carry out detailed evaluations or simulations of overall seismic survey activities.
  • Accustomed to working with/in teams with targets in 2D and 3D seismic projects.
  • Experienced in seismic operations in urban, swamp and remote areas.
  • Able to make project reports, like design reports

Overview

17
17
years of professional experience
5
5
years of post-secondary education
2
2
Languages

Work History

Geophysicist (Field Seismologist/Design Seismologist)

PT. Daqing Citra Petroleum Technology Services
11.2008 - Current

Job Description :

- Planning seismic hole drilling and pre-loading

- Providing supporting documentation (reports)

- Support to recording (SPS, recording program)

- Support to processing

- Seismic Data Acquisition Design with MESA software

Project :

2009-2010 (Field Seismologist) :

PT Daqing CPTS - SPC (Mahakam Hilir Block) Program 2D

2010-2011 (Field Seismologist) :

PT Daqing CPTS – PT PERTAMINA EP (Tapian Timur Block) Program 2D and 3D

2010-2011 (Field Seismologist) :

PT Daqing CPTS – PT PERTAMINA EP (Louisse Nonny & Samboja Block) Program 3D

2011 (Design Seismologist) :

PT Daqing CPTS – PT PERTAMINA EP (Cilamaya Block) Program 3D

2011-2012 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Nona & Semanggi Block) Program 2D and 3D

2012-2013 (Design Seismologist) :

PT Daqing CPTS–JOB PERTAMINA-TALISMAN ENERGY (West OK & Metur Block) Program 3D

2013-2014 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Marlin-Kambitin Block) Program 3D

2015-2016 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Tanjung Area 1 Block) Program 2D

2017-2018 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Piraiba Block) Program 2D & 3D

2019-2020 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Salawati Block) Program 3D

2020-2021 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Tanjung Barat Block) Program 2D

2021-2022 (Field & Design Seismologist) :

PT Daqing CPTS - PT Medco E&P Indonesia (South Sumatera-Lematang Block) Program 2D

2022-2023 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Abab Block) Program 3D

2023-2024 (Design Seismologist) :

PT Daqing CPTS - PT PERTAMINA EP (Idaman Block) Program 3D

Junior Geophysicist

Incooperate Project UNPAD, Bandung and Pertamina
07.2008 - 09.2008
  • Study geology & geophysics in Jambi Utara field, South Sumatera Basin
  • Crossplot analysis with Hampson-Russel

Junior Geophysicist

Incooperate project UPN “Veteran”, Yogyakarta and Pertamina
12.2007 - 05.2008
  • Miss tie editing for 467 lines seismic 2D in Sakakemang field area
  • Well to seismic tie
  • Picking horizon at Gumai, Baturaja, Talang Akar, inner Talang Akar, Basement formation
  • Time to depth conversion
  • Acoustic Impedance Seismic inversion modeling
  • Mapping lead and prospect area for proposed well

Education

Sub-department of Geophysics - Physics

Gadjah Mada University
08.2003 - 07.2008

Skills

  • seismic acquisition

  • seismic processing

Tools

Microsoft Windows, Linux, Microsoft Office, Surfer, Mapinfo, MapSource, MESA, Promax 1998.1, Hampson Russel (Geoview, Emerge/eLog, Strata), PETREL 2005

Personal Information

  • Date of Birth: 12/10/84
  • Gender: Male
  • Nationality: Indonesia
  • Marital Status: Married
  • Religion: Moslem

Student Experience

09/01/07 - 10/31/07, PPPTMGB LEMIGAS JAKARTA, One month on job training seismic data processing., 2D marine seismic data processing with ProMAX version 1998.1, Display and QC raw data, geometry correction, process data from Pre-Processing until Migration, report, presentation

Timeline

Geophysicist (Field Seismologist/Design Seismologist)

PT. Daqing Citra Petroleum Technology Services
11.2008 - Current

Junior Geophysicist

Incooperate Project UNPAD, Bandung and Pertamina
07.2008 - 09.2008

Junior Geophysicist

Incooperate project UPN “Veteran”, Yogyakarta and Pertamina
12.2007 - 05.2008

Sub-department of Geophysics - Physics

Gadjah Mada University
08.2003 - 07.2008
Triyanto Geophysicist (Field And Design Seismlogist) In Land Seismic Acquisition