Structural engineering professional with proven track record in designing and evaluating structural components. Known for strong focus on team collaboration and consistently delivering reliable results. Expertise in structural analysis and project management, coupled with proactive approach to problem-solving and adaptability to changing project requirements.

Overview

17
17
years of professional experience
1
1
Certification
1
1
Language

Work History

Civil & Structure Engineer

Medco E & P Indonesia
06.2022 - 04.2025

Collaborated with multidisciplinary teams (Mechanical, Electrical, Piping, Process, & Instrument) on large-scale projects, integrating structural components seamlessly into overall designs.

Projects:

  • IPAL Project Bangkanai
  • Engineering Coordinator DED New Warehouse and Staff Camp Building Block A
  • Pre FEED Block A Phase 3
  • Tower inspection Tarakan
  • Mitigation Sulfur Pit leakage Block A
  • Singa 1 & Singa 3 Flowline Replacement
  • Bridge Reinforcement Soka
  • FEED Arung Nowera CPP
  • Pre-FEED Arung Nowera CCS project

-

Civil & Structure Engineer

PT Medco E&P Natuna
02.2021 - 05.2022

Projects:

  • RSR Analysis (Meliwis & Wortel)
  • Matak Runway assessment
  • Matak Driling Warehouse
  • Scaffolding structure assessment Kerisi
  • Structure assessment for Solar PV Installation
  • Belanak FPSO and Belida DPPA Flare Tip Inspection.
  • Splash Zone Inspection

Lead Civil & Structure Engineer

PT Medco E&P Indonesia
09.2019 - 01.2021
  • Conducted thorough risk assessments prior to initiating projects, minimizing potential hazards for both workers and endusers.
  • Developed cost-effective solutions to structural challenges, maintaining client satisfaction and budgetary constraints.
  • Optimized existing structures through careful analysis of load capacity, recommending necessary reinforcements or modifications for improved performance.
  • Maintained detailed documentation throughout all stages of a project''s lifecycle, ensuring complete and accurate records for future reference or analysis.

Projetcs:

  • Structure Assessment (Pump house Matra, Pump House Pengabuan)
  • Extension Power Plant Ibul
  • Landslide mitigation Teras-Rambutan
  • Iliran High Open Pit Trial Oil Mining Feasibility Study
  • Landslide Mitigation Block
  • Compressor Relocation Project Singa
  • Pre Feed Arung-Nowera Project


CIVIL & STRUCTURE ENGINEER

PT Medco E&P Indonesia
03.2017 - 08.2019

Projects:

  • Compressor relocation Singa
  • Optimization Lica production facilities
  • Bridge structure assessment Semangus & Panglero Bridge
  • Iliran High Open Pit Trial Feasibility Study


Construction Engineer Project Block A

PT Medco E&P Malaka
11.2015 - 02.2017
  • Managed contractor relationships to ensure timely delivery of services while maintaining high-quality standards.
  • Reviewed construction work against technical designs and drawings to assess compliance.
  • Set work schedules, coordinated site facilities and monitored progress.
  • Visited construction sites daily to evaluate work quality.

Civil & Structure Engineer

PT Medco E&P Indonesia
08.2009 - 09.2015

Projects:

  • Power Plant Upgrading for Waterflood POFD Project
  • Telisa Pressure Maintenance project
  • WIP Capacity Upgrading
  • H2S Removal Unit
  • Power Plant Upgrading Phase II (POFD Waterflood)
  • Enhance Oil Recovery Project at Rimau Asset
  • Workshop E&I Development Project
  • Manifold support foundation design due to foundation settlement
  • ALD Staging Building Modification (assessment & engineering design)
  • Building assessment Power Plant Semoga Rimau Asset
  • Building assessment & modification Power Plan B Kaji Station & Pump House Kaji station
  • Retaining Wall Refurbishment at Kaji Satelite
  • Assessment & design modification CTP House and foundation at Tengguleng
  • Assessment & design modification Fire Water Tank support Tengguleng
  • Structure assessment Mess Kembar
  • Building Assessment Rimau Asset
  • Earthquake Study and Assessment at South Sumatra Extension Asset
  • Liquid handling facilities Project South Sumatra Extension Asset
  • Assessment and engineering design for rectification jetty at Sembakung
  • Pipeline Gn. Kembang – Teras Project
  • Rectification dolphin at Bunyu Tarakan Sembakung Asset
  • Road crossing Pipeline Pengabuan - Plaju

Graduate Engineer Trainee

PT Medco E&P Indonesia
08.2008 - 07.2009

Education

Bachelor of Science - Civil Engineering

Gadjah Mada University
Yogyakarta
04.2001 -

Skills

Civil engineering

Software

Staad Pro

SACS

Paxis

Certification

Procurement Management BNSP

Timeline

Procurement Management BNSP

02-2024

Civil & Structure Engineer

Medco E & P Indonesia
06.2022 - 04.2025

Civil & Structure Engineer

PT Medco E&P Natuna
02.2021 - 05.2022

Lead Civil & Structure Engineer

PT Medco E&P Indonesia
09.2019 - 01.2021

CIVIL & STRUCTURE ENGINEER

PT Medco E&P Indonesia
03.2017 - 08.2019

Construction Engineer Project Block A

PT Medco E&P Malaka
11.2015 - 02.2017

Civil & Structure Engineer

PT Medco E&P Indonesia
08.2009 - 09.2015

Graduate Engineer Trainee

PT Medco E&P Indonesia
08.2008 - 07.2009

Bachelor of Science - Civil Engineering

Gadjah Mada University
04.2001 -
Yudi Agung NugrohoCIVIL & STRUCTURE ENGINEER