Zeindri Saputra

Zeindri Saputra

Instrument Electrical Engineer
Tangerang Selatan

Summary

I am a friendly, loyal and clearly dedicated individual who has an ambition to succeed in any given environment. Although I have informatics engineering background, I love to learn and am always up to a challenge whatever the situation. I get along well with others, with also working efficiently on my own. I am seeking a position where I can develop and excel while giving my best to an employer

Overview

2026
2026
years of professional experience
1
1
Language

Work History

Project Engineer

PT. Saberindo Pacific
05.2025 - 11.2025
  • Responsible material project ATG
  • Developt drawing Layout Monitoring Project System and wiring system ATG
  • Supervisi installation instrument and electrical system ATG

Commissioning Engineer

PT. Control System
02.2019 - 08.2020
  • Developt System Monitoring DCS Delta-V Project MusimMas - Medan.
  • Responsible for Commissioning DCS Delta-V for loop check I/O List system Project Musim Mas – medan

Supervisor Operational Water Resourcese Monitoring

PT. Danone – AQUA
05.2013 - 09.2018

1. Maintenance Equipment Instrument Monitoring
All Location refenery.


2. Report Maintenance Monitoring to Head Office
Responsible Troubleshooting Intrument monitoring water (pH, Conductivity, Level transmitter, Flowmeter, Recorder, and Scara System Monitoring).

Project Engineer

PT.Grama Bazita (EPC) / PT.Endress Hauser Indonesia
08.2011 - 05.2013
  • Responsible for preparing some instrument ( flowmeter, pressure, level transmitter and valve) and system engineering document i.e function design spesification (FDS).
  • Responsible for Factory Acceptance Test (FAT) and standard of procedure (SOP).
  • Wiring termination Commissioning electrical instrument to system PLC ATG ( Automatic Tank Gauging).
  • I have completed Commissioning several major projects such as ;


a. PT. Wilmar Wina - Kota Dumai {2011-2012}

b. PT. Wilmar WBI - Pelintung Dumai {2011-2012}

c. PT. Wilmar Bulking - Pelintung Dumai {2011-2012}

d. PT. Wilmar SAP - Palembang {2012-2013}

e. PT. Oleo Chemical - Dumai {2012}

f. PT. Surya Agrolika Reksa - Kuansing Riau {2012}

g. PT. Musimas Fuji - Bekasi {2012-2013}

h. PT. Pertamina Avtur - Soekarno Hatta {2012-2013}

i. PT. Pertamina Avtur - Kuala Tanjung {2012-2013}

j. PT. Pertamina LPG - Tanjung Priok {2013}


  • Responsible structural design drawings and electrical wiring systems on the distribution panel for the project.
  • Responsible for Engineering and Construction Stage for System Integration Projects.
  • Troubleshoot Instrument and Control System problem on site.
  • Responsible for Develop HMI/Scada programming


Project Engineer

PT. Solusi Prima Control
2010 - 2011
  • Developt Project ATG Pertamina Cilacap – 2010 ;

a. Development process architecture system DCS and integration monitoring system to field instrument electrical.

b. Responsible preparing I/O List instrument assigment.

  • Site survey layout architecture project.

Education

Bachelor of Science - Informatic of Engineer

University Islamic of Indonesia
Yogyakarta, Indonesia
04.2001 -

Software

PLC

Autocad

Scada System

Languages

English
Intermediate (B1)

Timeline

Project Engineer

PT. Saberindo Pacific
05.2025 - 11.2025

Commissioning Engineer

PT. Control System
02.2019 - 08.2020

Supervisor Operational Water Resourcese Monitoring

PT. Danone – AQUA
05.2013 - 09.2018

Project Engineer

PT.Grama Bazita (EPC) / PT.Endress Hauser Indonesia
08.2011 - 05.2013

Bachelor of Science - Informatic of Engineer

University Islamic of Indonesia
04.2001 -

Project Engineer

PT. Solusi Prima Control
2010 - 2011
Zeindri SaputraInstrument Electrical Engineer